Seibu Haijima Line
The Seibu Haijima Line (西武拝島線, Seibu Haijima-sen) is a railway line in Tokyo, Japan, operated by Seibu Railway.[1] It acts as a branch line of the Seibu Shinjuku Line, with direct trains to Seibu-Shinjuku Station in Tokyo.
Seibu Haijima Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Seibu Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Kanto region | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 14.3 km (8.9 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 (Single-tracked: from Tamagawa-Jōsui to Musashi-Sunagawa, from Seibu-Tachikawa to Haijima) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,067 mm (3 ft 6 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 1,500 V DC, overhead catenary | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 110 km/h (70 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Stations
- O: stop
- SE: Semi Express (準急, Junkyū)
- E: Express (急行, Kyūkō)
- HL: Haijima Liner (拝島ライナー, Haijima Rainā)[2]
All trains on this line stop at every station.
No. | Station | Japanese | Distance (km) |
SE | E | HL | Transfers | Location |
---|---|---|---|---|---|---|---|---|
SS19 | Kodaira | 小平 | 0.0 | O | O | O | Seibu Shinjuku Line
(Direct service to Seibu-Shinjuku) |
Kodaira |
SS30 | Hagiyama | 萩山 | 1.1 | O | O | O | Seibu Tamako Line
(Limited direct service from Tamako to Seibu-Shinjuku) |
Higashimurayama |
SS31 | Ogawa | 小川 | 2.7 | O | O | O | Seibu Kokubunji Line | Kodaira |
SS32 | Higashi-Yamatoshi | 東大和市 | 5.7 | O | O | O | Higashiyamato | |
SS33 | Tamagawa-Jōsui | 玉川上水 | 7.2 | O | O | O | Tama Toshi Monorail Line | Tachikawa |
SS34 | Musashi-Sunagawa | 武蔵砂川 | 9.6 | O | O | O | ||
SS35 | Seibu-Tachikawa | 西武立川 | 11.6 | O | O | O | ||
SS36 | Haijima | 拝島 | 14.3 | O | O | O | JCŌme Line, Itsukaichi Line, Hachiko Line | Akishima |
Rolling stock
A fleet of eight 10-car Seibu 40000 series EMUs is scheduled to be introduced from spring 2017, operating on the Seibu Ikebukuro, Seibu Shinjuku, and Seibu Haijima Lines.[3]
History
- 2 November 1928: Opened as Tamako Railway from Hagiyama to Moto-Kodaira (near Kodaira).
- 15 August 1932: Electrified at 600 V DC from Hagiyama to Moto-Kodaira.
- 12 March 1940: Tamako Railway merged with Musashino Railway (present-day Seibu Railway).
- 15 November 1949: Moto-Kodaira Station merged into Kodaira Station.
- 15 May 1950: Jōsui Line opened from Ogawa to Tamagawa-Jōsui. Omebashi and Tamagawa-Jōsui stations opened.
- 12 October 1954: Electrified at 1,500 V DC from Ogawa to Tamagawa-Jōsui.
- 18 March 1955: Electrification raised to 1,500 V DC between Kodaira and Hagiyama.
- 1 September 1962: Josui Line opened from Hagiyama to Ogawa. Renamed Jōsui Line from Kodaira to Hagiyama.
- 7 November 1967: Double-tracked from Kodaira to Hagiyama.
- 15 May 1968: Haijima Line opened from Tamagawa-Jōsui to Haijima, Seibu-Tachikawa station opened. Jōsui Line renamed Haijima Line.
- 25 March 1979: Omebashi Station renamed Higashi-Yamatoshi Station.
- 7 December 1979: Double-tracked from Hagiyama to Ogawa.
- 12 December 1983: Musashi-Sunagawa Station opened.
- 1 December 1983: Double-tracked from Musashi-Sunagawa to Seibu-Tachikawa.
- 5 March 1987: Nishi-Ogawa passing loop opened. Double-tracked from Nishi-Ogawa to Higashi-Yamatoshi.
- 2 November 1988: Double-tracked from Higashi-Yamatoshi to Tamagawa-Jōsui.
- 29 March 1991: Double-tracked from Ogawa to Nishi-Ogawa, Nishi-Ogawa passing loop abolished.
- 14 June 2008: Haijima Rapid service started. The service stopped at: Kodaira, Tamagawa-Jōsui, Musashi-Sunagawa, Seibu-Tachikawa and Haijima stations.
- 30 June 2012: Haijima Rapid service abolished.[4]
References
- Terada, Hirokazu (July 2002). データブック日本の私鉄 [Databook: Japan's Private Railways]. Japan: Neko Publishing. pp. 58–59. ISBN 4-87366-874-3.
- "西武新宿線停車駅あんない". Seibu Railway. Archived from the original on 7 August 2013. Retrieved 5 August 2013.
- 進化した”スマイルトレイン" 西武鉄道、新型車両「40000系」デビューへ [New Seibu 40000 series "advanced Smile train" rolling stock to debut] (in Japanese). Japan: Tetsudo Shimbun. 24 August 2015. Retrieved 25 August 2015.
- "2012 年 6 月 30 日(土) ダイヤ改正を実施します" [30 June 2012 (Sat), a change in timetable will be implemented] (PDF). News Release (in Japanese). Japan: Seibu Railway. 21 May 2012. Archived from the original (PDF) on 24 September 2015. Retrieved 4 September 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.