Harold Wood railway station
Harold Wood railway station is on the Great Eastern Main Line in east London, serving Harold Wood in the London Borough of Havering. It is 14 miles 76 chains (24.1 km) down the line from London Liverpool Street and is situated between Gidea Park and Brentwood. Its three-letter station code is HRO and it is in Travelcard zone 6.
Harold Wood | |
---|---|
Harold Wood Location of Harold Wood in Greater London | |
Location | Harold Wood |
Local authority | London Borough of Havering |
Managed by | Transport for London |
Owner | Network Rail |
Station code | HRO |
DfT category | C2 |
Number of platforms | 4 |
Accessible | Yes[1] |
Fare zone | 6 |
National Rail annual entry and exit | |
2017–18 | 2.930 million[2] |
2018–19 | 3.089 million[2] |
2019–20 | 3.064 million[2] |
2020–21 | 0.964 million[2] |
2021–22 | 1.998 million[2] |
Key dates | |
1 December 1868 | Opened |
Other information | |
External links | |
WGS84 | 51.5928°N 0.2343°E |
London transport portal |
The station is currently managed by Transport for London and is on the Elizabeth line between Shenfield and London Paddington.
History
Harold Wood station was opened on 1 December 1868 by the Great Eastern Railway on its main line from Bishopsgate in London to the east of England and consisted of two staggered platforms of wooden construction, the down platform accessed from Station Road and the up platform from Oak Road. Goods facilities consisted of two sidings on the north side of the line opposite the up platform, and there was also a long siding serving a brickworks. A signal box was provided at the up end of the down platform controlling the signals, access to the goods facilities, and a trailing crossover.[3]
Two additional tracks were built to the north of the original lines in 1934 under London and North Eastern Railway ownership. The original tracks are normally used today by express services which do not call at Harold Wood. At this time the current station building was constructed on the overbridge at Gubbins Lane, and new platforms of precast concrete construction located slightly further east nearer to the new station building. The signal box was removed as part of these works, with control of the new colour light signals shared between Gidea Park and Brentwood.[3]
Services
As of the May 2023 timetable, the typical Monday to Friday off-peak Elizabeth line service is:
- 2 tph (trains per hour) westbound to Heathrow Terminal 5
- 6 tph westbound to Paddington
- 8 tph eastbound to Shenfield
Preceding station | Elizabeth line | Following station | ||
---|---|---|---|---|
Gidea Park | Elizabeth line | Brentwood towards Shenfield |
References
- "Harold Wood Station Plan". National Rail Enquiries. Retrieved 12 January 2021.
- "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
- Brennand, Dave (December 2002). "Harold Wood". Ilford to Shenfield. Eastern Main Lines. Midhurst: Middleton Press (published 2002). pp. 59–63. ISBN 1-901706-974.
External links
- Train times and station information for Harold Wood railway station from National Rail
- Excel file displaying National Rail station usage information for 2005/06 Archived 22 January 2013 at the Wayback Machine