HealthLine
The HealthLine (formerly known as the Silver Line[2] and as the Euclid Corridor Transportation Project) is a bus rapid transit (BRT) line run by the Greater Cleveland Regional Transit Authority in Cleveland and East Cleveland, Ohio, United States. The line runs along Euclid Avenue from Public Square in downtown Cleveland to the Louis Stokes Station at Windermere in East Cleveland. It began operation on October 24, 2008.[3] Its current name was the result of a naming rights deal with the Cleveland Clinic and University Hospitals of Cleveland.[4] The HealthLine is denoted with a silver color and abbreviated simply as HL on most RTA publications.
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operator | GCRTA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Garage | Hayden | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Vehicle | New Flyer XN60 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began service | October 24, 2008[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route type | Bus rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Cleveland and East Cleveland, Cuyahoga County, Ohio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Start | Public Square | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
End | Louis Stokes Station at Windermere | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Length | 6.8 mi (11 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 59 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operates | 24 hours | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 1,462,001 (2020) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The HealthLine's ridership peaked at 5.08 million rides in 2014, but has since declined by over 25% through 2018, with 3.7 million rides that year.[5]
The Healthline is tied with Connecticut Transit's CTfastrak as the second-top rated BRT system in the United States each with Silver rating according to the BRT Standard.[6][7] Only ABQ RIDE's Albuquerque Rapid Transit has achieved the top rating of Gold.
History
Going back to the 1950s, the city of Cleveland considered alternatives for rapid transit along Euclid Avenue between downtown and University Circle. In 1985, the city commissioned a study called the Dual Hub Corridor Alternatives Analysis/Draft Environmental Impact Statement. The study estimated the cost of a subway along this corridor to be $1 billion and an option that involved a light rail component at $750 million.[8] A further study in 1993 examined additional alternatives, including a bus rapid transit plan, which ultimately was selected by the RTA in 1995. Upon adoption by the Northeast Ohio Areawide Coordinating Agency in December 1995, the name of the project was changed from the Dual Hub Corridor to the Euclid Corridor.[9]
The plan included the Euclid Corridor busway, relocating five Red Line stations and right-of-way improvements on East 17th and East 18th Streets. At the time, the estimated cost of the project was $210 million with the federal government funding 80% of the cost.[9] In 1996, the Federal Transit Administration provided $4.0 million in funds for initial engineering studies. The initial ridership projections were 29,500 boardings per day by 2025. In 1999, the plan was scaled back to include only the busway and a budget of $228.6 million was established with the city seeking a 59% federal government share, or $135.0 million.[10] The final design was completed in 2002 and the project was funded in 2004, with completion in 2008. The total cost was $197.2 million, which accounted for some additional changes to the initial scope.[11]
In 2008, the RTA secured a naming rights deal with the Cleveland Clinic and University Hospitals for $6.25 million over 25 years and the route was renamed the HealthLine.[12]
Route description
The HealthLine route travels 6.8 miles (11 km) along Euclid Avenue from Public Square in Downtown Cleveland to Louis Stokes Station at Windermere in East Cleveland. It passes through the neighborhoods of Downtown, Midtown, Fairfax, University Circle and the suburb of East Cleveland.[3]
There are 59 stations along Euclid Avenue that serve the HealthLine. All stations are equipped with a fare card vending machine, 24-hour lighting and an emergency phone. An illuminated text display informs passengers of expected arrival times. Between Public Square and East 107th Street, all stations have raised platforms that align with the floor of the rapid transit vehicle, easing boarding and alighting.[13]
Between Public Square and East 105th Street, Euclid Avenue has two "bus only" lanes close to the inner median which only allow HealthLine vehicles passage, reducing delays due to conflicts with general traffic during busy times. Complementing the HealthLine is a set of bike lanes on the outer edges of the stretch Euclid Avenue that connects Cleveland State University with Case Western Reserve University.[14]
As late as July 2010, the trip from East Cleveland to downtown during rush hour was more than 40 minutes – longer than the planned 33 minutes. This was due to traffic light timing and the 25 mph speed limit along most of the route. The speed limit was raised to 35 mph for buses and traffic light timing was adjusted further to combat this issue.[15][16]
Shortly after the line began service, signal priority was discontinued along portions of the line. The decision has been referred to as a form of BRT creep.[17]
The HealthLine operates out of the Hayden Garage, located behind the Stokes-Windermere station.
Bus fleet
The HealthLine's original fleet consists of 21 articulated New Flyer DE60LFA vehicles, each with a seating capacity of 47 and able to accommodate 53 more standing up. The vehicles have two doors on each side and run on a diesel-electric hybrid motor system, producing 90% fewer carbon emissions than conventional diesel buses;[18][19] a Caterpillar C9 low-sulfur diesel engine generates electrical power to run smaller electric motors mounted on each of the wheels.[20] Each vehicle also has a GPS locator on board, which allowed automated traffic signals to give the HealthLine buses priority at busy intersections, until the feature was discontinued.
Sixteen CNG-powered New Flyer Xcelsior buses were added to the HealthLine fleet in 2021, commencing service in January 2022.[21]
Bus stops
The RTA classifies its bus rapid transit stops as "curb stations" and "median stations". Median stations are located within the Euclid Avenue busway and can only be accessed using crosswalks. Median stations can utilize left- or right-side boarding, as buses have doors on both sides. Curb stations are more traditional bus stops where buses open their doors to the right curb of the street.
Schedule
On weekdays, the HealthLine runs every 7-10 minutes from 6:10 am to 7:10 pm, and every 15-30 minutes outside that window. On weekends and holidays, it runs every 15 minutes from 4:40 am to 11:40 pm and every 30 minutes outside that window.[22]
Stations
All stations are ADA-accessible
Station | Platform style | Doors opened | Location | Connections / Notes |
---|---|---|---|---|
Public Square/West Roadway | curb | left | Downtown | RTA Bus: 1, 3, 8, 9, 11, 14, 14A, 15, 19, 19A, 19B, 22, 25, 26, 26A, 39, 45, 51, 51A, 53, 53A, 55, 55B, 55C, 71, 77, 90, 251, B-Line Trolley eastbound stop |
Public Square/Tower City | RTA Rapid Transit: Red Line, Blue Line, Green Line, Waterfront Line at Tower City station RTA Bus: 1, 3, 8, 9, 11, 14, 14A, 15, 19, 19A, 19B, 22, 25, 26, 26A, 39, 45, 51, 51A, 53, 53A, 55, 55B, 55C, 71, 77, 90, 251, B-Line Trolley Laketran: 10, 11, 12 METRO RTA: 61 PARTA: 100 SARTA: 4 eastbound stop | |||
East 2nd Street | median | |||
East 6th Street | ||||
East 9th Street | ||||
East 14th Street | ||||
East 19th Street | 2 median | right | METRO RTA: 61 | |
East 24th Street | ||||
East 30th Street | Central | |||
East 36th Street | ||||
East 40th Street | ||||
East 51st Street | ||||
East 59th Street | RTA Bus: 16 | |||
East 66th Street | ||||
East 71st Street | ||||
East 79th Street | Fairfax | RTA Bus: 2 | ||
East 83rd Street | ||||
East 89th Street | ||||
East 93rd Street | RTA Bus: 48, 50 | |||
East 100th Street | Sunday service only METRO RTA: 61 (weekdays only) | |||
East 105th Street | University Circle | RTA Bus: 10, 11 Easternmost stop on exclusive BRT right-of-way | ||
Stokes/Stearns | 2 curb | RTA Bus: 9, 11, 50 | ||
Adelbert Road | RTA Bus: 9 | |||
Cornell Road | RTA Bus: 9 | |||
East 115th Street | ||||
East 118th Street | ||||
East 123rd Street | ||||
Lakeview Road | East Cleveland | |||
Delmont Avenue | curb | Westbound stop | ||
Roxbury Road | Eastbound stop | |||
Emily Street | Westbound stop | |||
Garfield Road | Eastbound stop | |||
Superior Avenue | 2 curb | RTA Rapid Transit: Red Line at Superior station RTA Bus: 3, 40 | ||
Eddy Road | curb | Westbound stop | ||
Wellesley Avenue | Eastbound stop | |||
Lakefront Road | Westbound stop | |||
Belmore Avenue | Eastbound stop | |||
Debra Ann Lane | Westbound stop | |||
Louis Stokes–Windermere | RTA Rapid Transit: Red Line (direct connection) RTA Bus: 3, 7, 7A, 28, 28A, 31, 35, 37, 41, 41F |
- Public Square/West Roadway
- Public Square/Tower City
- East 2nd Street
- East 6th Street
- East 9th Street
- East 66th Street
- Adelbert Road
- Cornell Road
- Louis Stokes Station at Windermere
References
- Greater Cleveland Regional Transit Authority (24 October 2008). "HealthLine opens, pumping new life into Cleveland". Retrieved 26 January 2020.
- Clinic, UH pay to name Euclid Corridor buses. The Plain Dealer. Retrieved on March 4, 2008.
- "Where it goes" -
- "Greater Cleveland Regional Transit Authority". www.riderta.com. 11 March 2013. Retrieved 2015-04-12.
- "The Greater Cleveland Regional Transit Authority (GCRTA) | National Transit Database". www.nationaltransitdatabase.org. Retrieved 2019-08-13.
- "Albuquerque, NM Opens First USA Gold Standard BRT on Historic Route 66". Transport Matters. Institute for Transportation and Development Policy. November 27, 2017. Retrieved April 26, 2020.
- "BRT Rankings". Institute for Transportation and Development Policy. 2020. Retrieved April 26, 2020.
- "Cleveland, Ohio, Euclid Avenue BRT" (PDF). Transportation Research Board. Retrieved 2020-05-01.
- Report on Funding Levels and Allocations of Funds for Transit Major Capital Investments: Report of the Secretary of Transportation to the United States Congress Pursuant to 49 U.S.C. 5309(m)(3) (formerly Section 3(j) of the Federal Transit Act). Federal Transit Administration. 1997. Retrieved 2020-05-01.
- Department of Transportation and Related Agencies Appropriations Bill, 2003. United States Congress. p. 123. Retrieved 2020-05-01.
- Euclid Corridor Transportation Project Before-and-After Study (2012) (PDF). Federal Transit Administration. 2012. Retrieved 2020-05-01.
- "Clinic, UH pay to name Euclid Corridor buses". The Plain Dealer. 2008-02-28.
- "What it is - Station" -
- Rapid Transit Vehicles - http://euclidtransit.org/rapid_transit_system/euclid_corridor_vehicles.asp Archived 2008-06-21 at the Wayback Machine
- McIntyre, Michael (17 July 2010). "Cleveland allows RTA buses to drive faster on Euclid Avenue". Cleveland Plain Dealer. Retrieved 1 August 2010.
- Farkas, Karen (6 July 2010). "HealthLine buses moving slower than expected on Euclid Avenue". Cleveland Plain Dealer Blog. Retrieved 1 August 2010.
- Ross, Benjamin. "Big Philanthropy Takes the Bus". Dissent Magazine. Dissent Magazine. Retrieved 5 October 2016.
- RTA HealthLine -
- "What it is - Vehicle" -
- Euclid Corridor Transportation Project - http://euclidtransit.org/rapid_transit_system/euclid_corridor_vehicles.asp Archived 2008-06-21 at the Wayback Machine
- "Greater Cleveland Regional Transit Authority 6001-6016". CPTDB Wiki. Canadian Public Transit Discussion Board. Retrieved 2023-04-05.
- "Schedule Effective April 21, 2013" - http://www.riderta.com/sites/default/files/schedule-pdfs/HealthLine.pdf