Sultan Abdul Halim Muadzam Shah Bridge
The Sultan Abdul Halim Muadzam Shah Bridge (Malay: Jambatan Sultan Abdul Halim Muadzam Shah), also known as the Penang Second Bridge (Jambatan Kedua Pulau Pinang) is a dual carriageway toll bridge in Penang, Malaysia. It connects Bandar Cassia (Batu Kawan) in Seberang Perai on mainland Peninsular Malaysia with Batu Maung on Penang Island. It is the second bridge to link the island to the mainland after the first Penang Bridge.
Expressway 28 | |
---|---|
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | |
Route information | |
Maintained by Jambatan Kedua Sdn Bhd (JKSB) | |
Length | 24 km (15 mi) |
Existed | 2006–present |
History | |
Major junctions | |
East end | Bandar Cassia (Batu Kawan), Seberang Perai |
West end | Batu Maung, Penang Island |
Location | |
Country | Malaysia |
Primary destinations | George Town, Bukit Tambun, Bandar Cassia, Batu Kawan, Simpang Ampat, Juru, Bayan Lepas, Bayan Baru, Batu Maung, Teluk Tempoyak, Permatang Laut, Serdang, Selama, Jelapang, Ipoh |
Highway system | |
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Jambatan Sultan Abdul Halim Muadzam Shah (Jambatan Kedua Pulau Pinang) | |
---|---|
Coordinates | 5°14′59″N 100°21′05″E |
Carries | Motor vehicles |
Crosses | South Channel, Malaysia |
Locale | Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge |
Official name | Sultan Abdul Halim Muadzam Shah Bridge |
Maintained by | Jambatan Kedua Sdn Bhd (JKSB) |
Characteristics | |
Design | |
Total length | 24 km |
Width | -- |
Longest span | 250 m |
History | |
Designer |
|
Constructed by |
|
Construction end | February 2014 [2] |
Opened | 2 March 2014 at 00:01 MST[2] |
Inaugurated | 1 March 2014 at 20:30 MST[2] |
Location | |
The total length of the bridge is 24 km (15 mi) with length over water at 16.9 km (10.5 mi), making it the longest bridge in Malaysia and the second longest in Southeast Asia. China Harbour Engineering Co Ltd (CHEC), a main contractor for the second bridge was expected to start work on the second Penang bridge in November 2007 and complete the project in 2011, but the completion date was then postponed to May 2012, and later to February 2014.[1]
It originally was given route code E22 but later changed to E28, and E22 was used by Senai–Desaru Expressway. Construction started in November 2008. To reduce the cost of construction, its design was then modified to resemble the first cable stayed Penang Bridge. The bridge has been built with a large loan from the People's Republic of China to continue and maintain the economic relationship between China and Malaysia.[3] The bridge was officially opened on 1 March 2014 at 20:30 MST and was named after the fourteenth Yang di-Pertuan Agong, the late Tuanku Abdul Halim Muadzam Shah of Kedah and was assigned with the route number E28.
Overview
The Sultan Abdul Halim Muadzam Shah Bridge is a High Impact Project (HIP) launched under the Ninth Malaysia Plan. Being a High Impact Project, it is seen as a key catalyst in the socio-economic development of the Northern Corridor Economic Region (NCER) of Malaysia. The project is being delivered by a special purpose Concession Company formed by the Government of Malaysia, Jambatan Kedua Sdn Bhd (JKSB). The bridge measuring a total of 24 km in length is being constructed by UEM Builders Sdn Bhd, a subsidiary of the UEM Group Malaysia, as well as China Harbour Engineering Company (CHEC), a subsidiary of the China Communications Construction Company (CCCC). Construction of the bridge, linking Batu Kawan on the mainland and Batu Maung on Penang Island, began in November 2008 and is projected completed in February 2014. The bridge was opened to traffic on 2 March 2014.[4]
Route background
The E28 expressway consists of the bridge and a land expressway linking the bridge to the North–South Expressway Northern Route E1, the main expressway of Peninsular Malaysia.
The Kilometre Zero of the expressway is located at its interchange with the North–South Expressway Northern Route E1. The westbound lanes towards the bridge feature a collector-express lanes system, where the collector lanes have an interchange at Exit 2801 to Bandar Cassia and Batu Kawan while the express lanes continue uninterrupted to the bridge. The bridge and expressway end in Batu Maung on Penang Island at the interchange with Tun Dr Lim Chong Eu Expressway.
History
Planning
The idea to build a second bridge linking Seberang Perai to Penang Island was suggested in 1995 by the fourth Prime Minister of Malaysia's Tun Dr Mahathir Mohamad and the 3rd Chief Minister of Penang's Tan Sri Dr Koh Tsu Koon. In August 2006, the Malaysian federal government unveiled a plan to build the Penang Second Bridge in the Ninth Malaysia Plan. On 12 November 2006, the groundbreaking ceremony for the new Penang Second Bridge was performed by the 5th Malaysian Prime Minister, Tun Abdullah Ahmad Badawi.
Construction
After months of soil survey work and test piling work, CHEC and UEM announced that the project was on track for completion in 2011. Construction work was expected to begin in January 2008.[5]
In April 2008, the government announced that the project was to be delayed by 9 months due to land acquisition, design issues, and also the rising costs of building materials.[6] Newly elected Penang Chief Minister, Lim Guan Eng proposed a toll discount for any delays on the project[7] and also expressed disappointment regarding the construction delay.[8]
In July 2008, Jelutong MP Jeff Ooi reported that the loan for the bridge risked being withdrawn if the shareholder agreement between UEM Builders Berhad and its joint-venture partner CHEC was not inked by August 2008. It was reported that there were disagreements between the two parties on the apportionment of the cost of building the bridge although the issue was expected to be resolved quickly due to UEM having a variation on the price on its portion.[9]
On 8 November 2008, the construction of the Penang Second Bridge by CHEC finally commenced.[10]
On 3 October 2012, media reports indicated that the bridge was 84% complete, and that the bridge was due to be completed approximately two months ahead of the deadline of September 2013.[11]
On 20 April 2013, the final closure of the cable stayed bridge at the main navigational span of the Penang Second Bridge was completed and thus signified the completion of the construction of the bridge and physically connecting Batu Maung on the Island and Batu Kawan on the Mainland.
On 30 April 2013, the sixth Prime Minister Najib Tun Razak became the country's first leader to use the 24 km Penang Second Bridge to cross from the island to the mainland to attend a function in Kepala Batas, Seberang Perai.
The bridge had been planned for completion on 8 November 2013 and to be opened to the public by the end of November.[12] However, the opening day of 8 November 2013 was postponed and the bridge would be opened to traffic on 1 March 2014.[4][13]
Opening
The opening ceremony of the Penang Second Bridge was held at 20:30 MST on 1 March 2014 and was officially opened by the Malaysian Prime Minister, Najib Tun Razak.[14] The bridge was official named as Sultan Abdul Halim Muadzam Shah Bridge after the fourteenth Yang di-Pertuan Agong, the late Tuanku Abdul Halim Muadzam Shah of Kedah.[13][15][16] At midnight on 2 March 2014, the bridge was opened to traffic at 00:01 MST after the official opening ceremony.
Restrictions during MCO
During the COVID-19 pandemic, the expressway experienced ramp closures several times.[17] Those ramps were:
- Batu Maung Ramp 4 (BMR4) (Southbound motorists had to make a U-turn at Batu Maung before entering the bridge)
- Bandar Cassia Ramp 7 (BCR7) (Southbound motorists had to make a U-turn at Bandar Cassia before approaching the JK2PP toll plaza)
- Bandar Cassia Toll Plaza A (Westbound motorists had to pay at Plaza B and pay again at JK2PP toll plaza)
Incidents
As with most bridges, the bridge has also been subject to a number of road accidents and suicides.
Penang Second Bridge ramp collapse
On 6 June 2013, a ramp leading to the still under construction Penang Second Bridge at Batu Maung interchange collapsed at around 7:00 pm, burying a car and two motorcycles under the debris. One person was killed in the incident. The ramp which is part of the Package 3A of the bridge project was built by the contractor Cergas Murni Sdn Bhd and not UEM Builders Berhad.
Design specifications
Bridge
The Sultan Abdul Halim Muadzam Shah Bridge is designed based on the double "S" curvy concept due to the geological reasons.The numerous "S"-like curves along the 24 km stretch are a requirement under the Road Safety Audit.
The Sultan Abdul Halim Muadzam Shah Bridge is the longest bridge in the world installed with High Damping Natural Rubber (HDNR) Bearing, an effective seismic isolation system that enables the bridge to withstand high intensity earthquakes. The bridge is the first in Malaysia to be installed with seismic expansion joints, which will allow movements during an earthquake.
Bridge specifications
- Overall length: 24 km (15 mi)
- Length over water: 16.9 km (10.5 mi)
- Main span: Length – 250 m
- Height clearance (above water): 30 m
- Number of vehicle lanes: 2 (with road shoulder) + 1 for motorcycles (each direction)
- Targeted date to be opened to the public: 2 March 2014
- Overall cost: RM 4.5 Billion
- Average time taken to drive from Batu Kawan to Batu Maung: 20 mins
- Proposed speed limit on bridge: 80 km/h (50 mph)
- Percentage of local contents to be used: 60%
Land expressway
The land expressway is the first in Malaysia to be designed based on an upgraded secondary consolidation criterion of 50-millimeter earth embankment settlement for every 20 years, as compared to the Penang Bridge whose 367-millimeter earth embankment has to be settled every five years.[18]
Tolls
Penang Second Bridge Integrated Toll Plaza Bandar Cassia PLUS Toll Plaza (Gateway Arch Toll Plaza) | |
---|---|
Plaza Tol Bersepadu Jambatan Kedua Pulau Pinang Plaza Tol PLUS Bandar Cassia (Plaza Tol Pintu Gerbang) | |
General information | |
Architectural style | Structural expressionism |
Location | Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge), Penang, Malaysia |
Construction started | 2011 |
Completed | February 2014 |
Opened | 2 March 2014 at 00:01 MST |
Inaugurated | 1 March 2014 at 20:30 MST |
Renovated | February 2014 |
Technical details | |
Floor count | 28 booths |
Overview
The bridge and the link road to the North–South Expressway are maintained by a private concession company, Jambatan Kedua Sdn Bhd (JKSB). The toll for the bridge is similar to the toll scheme for the Penang Bridge, where a fee is collected one way when crossing the bridge from the mainland to Penang Island, while no fee is imposed for mainland-bound motorists coming from the island. On the other hand, the toll for the link road between the bridge and the North–South Expressway is collected in both directions.
There was a toll-free trial period during the opening month from 2 March until 31 March 2014. Toll collection began on 1 April 2014 at 6am.[19] There are two toll plazas on the route: the Penang Second Bridge Integrated Toll Plaza (Bandar Cassia PLUS Toll Plaza) and the Penang Second Bridge Toll Plaza (JK2PP Toll Plaza).
Penang Second Bridge Integrated Toll Plaza (Bandar Cassia PLUS Toll Plaza)
The Penang Second Bridge Integrated Toll Plaza or Bandar Cassia PLUS Toll Plaza, also known as Gateway Arch Toll Plaza after its gateway arch design, is the main toll plaza for Sultan Abdul Halim Muadzam Shah Bridge. Upon completion in February 2014, it is the largest toll plaza in Malaysia, overtaking the Sungai Besi Toll Plaza of the North–South Expressway Southern Route E2.[20] The toll plaza is Malaysia's longest non-vehicular span steel arch structure. It is also the first in Malaysia to be awarded with a Platinum rating in the Green Building Index (GBI).[21]
Situated between the North–South Expressway (Exit 157) and Bandar Cassia (Exit 2801) interchanges, the Bandar Cassia PLUS Toll Plaza is managed by PLUS Expressways, the highway concessionaire of the North–South Expressway.
In the westbound direction towards the bridge, the toll plaza is the starting point of the collector-express lanes system with division into two sections: Plaza A for the express lanes to the bridge and Plaza B for the collector lanes to the Bandar Cassia interchange.[22] At Plaza A, three tolls are collected from motorists: the PLUS closed toll collection for the North–South Expressway, the toll for the link road and the toll for the bridge; the latter two are collected on behalf of JKSB. At Plaza B, only the first two tolls are collected without the bridge component, as it is intended for motorists heading towards Bandar Cassia and Batu Kawan without using the bridge.
In the eastbound direction towards the North–South Expressway, the toll plaza serves as the entry point into the PLUS closed toll system. The toll for the link road is collected together with the PLUS closed toll when the motorist exits the closed toll system.
Beginning 26 April 2017, only Touch 'n Go cards and SmartTAGs are accepted for toll payment. PLUS transit ticket is no longer issued for entry at Bandar Cassia toll plaza.
Penang Second Bridge Toll Plaza (JK2PP Toll Plaza)
The Penang Second Bridge Toll Plaza or JK2PP Toll Plaza is located on the collector lanes after the Bandar Cassia interchange (Exit 2801), before merging with the express lanes towards the bridge. The toll plaza is managed by Jambatan Kedua Sdn Bhd (JKSB).
The toll for the bridge is collected from motorists going towards the bridge from the Bandar Cassia interchange, as well as from those who had used Plaza B at the Bandar Cassia PLUS Toll Plaza and travelled on the collector lanes to the bridge. Motorists travelling on the express lanes bypass the JK2PP Toll Plaza, as they had already paid the toll for the bridge at Plaza A of the Bandar Cassia PLUS Toll Plaza.
Motorcyclists used to pay a bridge toll of RM1.70 at the JK2PP Toll Plaza. However, since 1 January 2019, toll collection for motorcyclists was abolished for both Penang bridges.[23][24][25] To date, the toll plaza canopy for motorcyclists remain.
Since 1 June 2016, all electronic toll transactions have been conducted using Touch 'n Go cards and SmartTAGs. The SmartTAG and MyRFID lanes are for light vehicles only. Cash payment is no longer accepted.
Fares
(Since 1 February 2020)[26][27]
Class | Types of vehicles | Rate (in Malaysian Ringgit (RM)) | |
---|---|---|---|
Bandar Cassia | JK2PP | ||
0 | Motorcycles (Vehicles with two axles and two wheels) |
Free | |
1 | Private Cars (Vehicles with two axles and three or four wheels (excluding taxis and buses)) |
0.60 | 5.74 |
2 | Vans and other small goods vehicles (Vehicles with two axles and five or six wheels (excluding buses)) |
0.90 | 30.50 |
3 | Large Trucks (Vehicles with three or more axles (excluding buses)) |
1.20 | 70.10 |
4 | Taxis | 0.30 | 8.50 |
5 | Buses | 0.50 | 26.20 |
Facilities
JKSB Ronda
JKSB Ronda is the highway patrol unit to patrol along the Sultan Abdul Halim Muadzam Shah Bridge and land expressways and also to provide assistance to commuters on the bridge. The current highway patrol vehicles are the Japanese made Toyota Hilux and the Mitsubishi i-MiEV, the four-seater electric vehicle, with similar dimensions of a Perodua Viva, is able to travel 150 km after an eight-hour full charge. Seven charging stations were also set up at the toll plaza on the mainland, two of them being rapid chargers which are able to give an 80 percent charge in 30 minutes.[28]
Inventory
Vehicle | Origin | Type | In service | Notes |
---|---|---|---|---|
Mitsubishi i-MiEV | Japan | Highway patrol vehicles | 2014–present | First highway patrol electric vehicles in Malaysia. |
Toyota Hilux | Japan | Highway patrol vehicles and tow truck | 2014–present |
Rest and service areas (R&R)
The future two rest and service areas (R&R) is located at Batu Kawan on the mainland. It will be built in six months' time. The plan had been the floating rest and service area on the middle of the bridge. However, the plan was scrapped due to high cost.
List of interchanges
Major Routes
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
Sultan Abdul Halim Muadzam Shah Bridge 0 | 157 | Penang Second Bridge-NSE Interchange | North–South Expressway Northern Route AH2 North-South Expressway Northern Route North North–South Expressway Northern Route AH2 Alor Star (Langkawi Island) Butterworth–Kulim Expressway AH140 Gerik North–South Expressway Northern Route AH2 Butterworth South North–South Expressway Northern Route AH2 Kuala Lumpur North–South Expressway Northern Route AH2 Ipoh North–South Expressway Northern Route AH2 Jawi Sungai Bakap Layby | Closed tolled trumpet expressway interchange | |
0.1 | |||||
0.2 | Canal bridge | ||||
0.3 | Sungai Tengah bridge | ||||
0.4 | |||||
0.5 | Penang Second Bridge Integrated Toll Plaza Bound Exit | T Sultan Abdul Halim Muadzam Shah Bridge (Gateway Arch Toll Plaza) T PLAZA A Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge Integrated Toll Plaza (Penang Second Bridge) FT 3113 George Town P10 Bayan Lepas P10 Batu Maung FT 3113 Bayan Lepas Free Industrial Zone FT 6 Penang International Airport T PLAZA B 2801 Bandar Cassia Interchange Bandar Cassia FT 149 Batu Kawan FT 149 Bukit Tambun FT 1 Simpang Ampat Changkat Nibong Tebal | West bound | ||
Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza) JKP PLAZA A (Main Toll Plaza) PLUSTransit Touch 'n Go SmartTAG MyRFID SmartTAG Touch 'n Go RM (Cash) Closed toll system Collect PLUSTransit cards and pay a distance toll including toll for Penang Second Bridge (Enter bridge only) | |||||
Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza} JKP PLAZA B (To Bandar Cassia Interchange only) SmartTAG MyRFID Touch 'n Go RM (Cash) Closed toll system Pay a distance toll | |||||
0.7 | Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza) JKP | West bound To Bandar Cassia Interchange only | |||
0.8 | |||||
North–South Expressway Northern Route AH2 North–South Expressway Northern Route (Batu Kawan Expressway) PLUS Expressway border limit | |||||
Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) JKSB border limit | |||||
0.9 | |||||
Sultan Abdul Halim Muadzam Shah Bridge 1 | 2801 | Bandar Cassia Interchange | Lebuhraya Bandar Cassia (Bandar Cassia Avenue) North Bandar Cassia FT 149 Batu Kawan FT 149 Bukit Tambun FT 1 Simpang Ampat FT 149 Aman Island (Jetty) Batu Kawan Sports Complex Southeast Changkat Nibong Tebal | Cloverleaf interchange | |
Penang Second Bridge Toll Plaza JKSB (From Bandar Cassia Interchange only) MyRFID SmartTAG Touch 'n Go RM (Cash) Opened toll system Pay toll | |||||
1.5 | Penang Second Bridge Toll Plaza JKSB | Penang Second Bridge Info Centre | West bound From Bandar Cassia Interchange only | ||
Sultan Abdul Halim Muadzam Shah Bridge 2 | |||||
Sultan Abdul Halim Muadzam Shah Bridge Batu Kawan Expressway | |||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Length Over Water: 16.9 kilometres | Start/End of bridge | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Batu Kawan Rest and Service Area | Eastern approach span East bound Future Rest and Service Area | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Batu Kawan Rest and Service Area | Eastern approach span West bound Future Rest and Service Area | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | ||||
Seberang Perai Selatan-Barat Daya district border | |||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Main navigational span Cable stayed bridge 250 m | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Western approach span | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Western approach span | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Length Over Water: 16.9 kilometres | Start/End of bridge | ||||
Sultan Abdul Halim Muadzam Shah Bridge 24 | 2802 | Batu Muang | Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Batu Muang Expressway North FT 3113 Tun Dr Lim Chong Eu Expressway (Bayan Lepas Expressway) FT 3113 Bayan Lepas Free Industrial Zone FT 3113 George Town Jerejak Island (Jetty) Penang Hospital South P10 Batu Maung P10 Bayan Lepas FT 6 Penang International Airport | Elevated directional-Y interchange | |
Persiaran Bayan Lepas | West Persiaran Bayan Lepas | Interchange | |||
Sungai Nipah bridge | |||||
Solok Bayan Lepas | West Solok Bayan Lepas | Interchange | |||
Sungai Batu Maung bridge | |||||
Penang Aquarium | |||||
Batu Muang Interchange | Northwest Jalan Pekan Batu Muang Batu Maung town centre MAS Complex Cargo Terminal Southeast P220 Jalan Permatang Damar Laut Permatang Damar Laut Penang War Museum | Diamond interchange | |||
Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | |||||
P10 Jalan Batu Muang JKR border limit | |||||
Southwest P10 Jalan Batu Maung P10 Bayan Lepas FT 6 Penang International Airport |
Lebuhraya Bandar Cassia
Lebuhraya Bandar Cassia | |
Major junctions | |
---|---|
North end | Jalan Bukit Tambun |
FT 149 Jalan Bukit Tambun Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge | |
South end | Batu Kawan |
Location | |
Country | Malaysia |
Primary destinations | Bandar Cassia |
Highway system | |
Lebuhraya Bandar Cassia is a major road in Penang, Malaysia.
List of interchange
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
Batu Kawan | FT 149 Jalan Bukit Tambun West FT 149 Pengkalan Batu Kawan FT 149 Aman Island (Jetty) East FT 149 Bukit Tambun FT 149 Simpang Ampat FT 1 Sungai Bakap FT 1 Bukit Mertajam North–South Expressway Northern Route AH2 North-South Expressway Northern Route Alor Setar Kuala Lumpur Ipoh | Roundabout | |||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) Start/End of highway | |||||
Batu Kawan Batu Kawan Sports Complex | Batu Kawan Stadium | ||||
Bandar Cassia | Lingkaran Cassia Timur | Junctions | |||
Bandar Cassia | |||||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) JKR border limit | |||||
Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) Start/End of expressway JKSB border limit | |||||
Bandar Cassia-JKPP | Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge (Batu Kawan Expressway) West T Penang Secong Bridge Toll Plaza Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge P10 Batu Maung P10 Bayan Lepas FT 6 Penang International Airport East T Penang Second Bridge Integrated (Gateway) North–South Expressway Northern Route AH2 North-South Expressway Northern Route North–South Expressway Northern Route AH2 Alor Setar North–South Expressway Northern Route AH2 Butterworth North–South Expressway Northern Route AH2 Kuala Lumpur North–South Expressway Northern Route AH2 Ipoh | Cloverleaf interchange | |||
Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) Start/End of expressway JKSB border limit | |||||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) JKR border limit | |||||
Bandar Cassia | |||||
Sungai Tengah bridge | |||||
Changkat |
Major events
Facts and figures
- Sultan Abdul Halim Muadzam Shah Bridge is the longest bridge in Malaysia and second longest in Southeast Asia, after Temburong Bridge. It was listed into the Malaysian Book of Records.
- Penang Second Bridge Integrated Toll Plaza or Gateway Arch Toll Plaza is the largest toll plaza in Malaysia. It was listed into the Malaysian Book of Records.
- The longest bridge over the water in Malaysia and Southeast Asia at 16.9 km.
- The longest bridge in Malaysia installed with High Damping Natural Rubber Bearing (HDNRB) that provides effective seismic isolation system that enables the bridge to withstand high intensity earthquakes.
- The bridge's 2.3 meter diameter bore pile designed for the Main Span bored 127 meter deep is among the deepest in the world.
- The Statnamic load test conducted at Pier 24 was the biggest Statnamic load test ever conducted in the world at 54MN.
- The first bridge to deploy electric vehicles as its Patrol Vehicle for the bridge and land expressway.
- Sultan Abdul Halim Mu’adzam Shah Bridge Toll Plaza Complex (Gateway Arch Toll Plaza) is the first in Malaysia to be awarded with a Platinum rating for the Green Building Index (GBI).
- The land expressway is the first in Malaysia to be designed for upgraded secondary consolidation criteria at 50mm settlement in 20 years.
- The first bridge in Malaysia installed with seismic expansion joints.
- First bridge in Malaysia installed with noise reduction seismic expansion joints.
- Malaysia's first third generation saddles at Pylon 25 & 26 for Main Span Stayed Cable Bridge.
- Largest Toll Plaza Complex in Malaysia installed with Ethylene Tetrfluoroethylene (ETFE) as its roof canopy (Jambatan Sultan Abdul Halim Mu’adzam Shah Integrated Toll Plaza/ Bandar Cassia PLUS Toll Plaza).
- Malaysia's longest pre-joined precast spun concrete piles were driven in the construction of this project.
- The first bridge in Malaysia to use the TL-4 movable barrier at the median crossing (every 2 km interval), which can stand impact from trucks, busses or other heavy vehicles.
- Installation of Dynamic Road Signage, which allow road users to access real time traffic conditions on the first bridge and Jambatan Sultan Abdul Halim Mu’adzam Shah. The first of such system installed in Malaysia.
- Sultan Abdul Halim Mu’adzam Shah Bridge Integrated Toll Plaza/ Bandar Cassia PLUS Toll Plaza is Malaysia's largest non-vehicular span steel arch structure erected, greeting the road users coming from PLUS Expressway.
Commemorative events
Postage stamps
The commemorative postage stamps to mark the opening of the Sultan Abdul Halim Muadzam Shah Bridge on 1 March 2014 was issued by Pos Malaysia on 31 December 2014. The denominations for these stamps were RM 1.20.
Bridge in popular culture
- The Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) was featured in an episode of Megastructures on the National Geographic Channel and TV1.
References
- "Second Penang Bridge set to open in February 2014".
- "Second Penang Bridge set to open in February 2014 - Nation - The Star Online". Retrieved 17 March 2016.
- "Malaysia secures 800 mln usd loan from China for second Penang bridge – report". Forbes. AFX News. 13 July 2007. Archived from the original on 15 July 2007.
- "Penang Second Bridge to open March 1".
- Work on second Penang bridge begins
- "Construction of Second Penang Bridge delayed". New Straits Times.
- CHRISTINA CHIN and TAN SIN CHOW. "Discount 'punishment' for Second Penang Bridge delay". The Star.
- ANDREA FILMER. "Penang CM disappointed over bridge delay". The Star.
- Pauline Puah (9 July 2008). "Second Penang Bridge loan risks being withdrawn". The Edge. Archived from the original on 4 August 2008. Retrieved 11 August 2008.
- "D- Day for Second Bridge".
- "Penang Second Bridge 84% complete".
- "All abuzz over Penang's new bridge".
- "Second Penang Bridge set to open on February 2014".
- "PM to open 2nd Penang Bridge".
- "Penang's second link named Sultan Abdul Halim Mu'adzam Shah Bridge".
- "Second Penang bridge opens to fanfare".
- "MCO: Several routes to JSAHMS remain closed". bernama.com. 14 April 2020.
- "THE BRIDGE: COMPARISON".
- "RM8.50 toll for Second Penang Bridge starting April 1". Malay Mail. Petaling Jaya, Malaysia. 31 March 2014. Retrieved 21 February 2018.
- Second Penang bridge expected to open in February
- The Malaysian Book of Records, Jambatan Sultan Abdul Halim Muadzam Shah website
- "80km speed limit for cars". The Star. Petaling Jaya, Malaysia. 27 February 2014. Retrieved 22 February 2018.
- "Motorcyclists rejoice as they don't have to pay toll now". thestar.com.my. 3 November 2018.
- "No more bridge tolls for motorcyclists in Penang". Malay Mail. Petaling Jaya, Malaysia. 1 January 2019. Retrieved 1 May 2022.
- Basyir, Mohamed (January 2019). "Toll charges gone at Penang bridges, but some motorcyclists still taking ferries". nst.com.my.
- "OPEN SYSTEM TOLL FARES".
- "VEHICLES CLASSIFICATION".
- "Electric vehicles to patrol new bridge - General - New Straits Times".