Jinkeng station
Jinkeng station (Chinese: 金坑站), is a station of Line 21 of the Guangzhou Metro. It started operations on 20 December 2019.[1]
Jinkeng 金坑 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 金坑站 | ||||||||||
Traditional Chinese | 金坑站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Guangshan Highway, Huangpu District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 21 | ||||||||||
Platforms | 4 (2 island platforms) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 21 12 | ||||||||||
History | |||||||||||
Opened | 20 December 2019 | ||||||||||
Services | |||||||||||
|
On 17 December 2019, Jinkeng Station was awarded the "Three-star Green Building Design Mark Certificate" by the Department of Housing and Urban-Rural Development of Guangdong Province, reaching the highest level in China's green building evaluation standards and becoming the first city rail transit line in mainland China to have a station that has obtained this certificate.[2]
The station has 2 elevated island platforms, numbered 1 & 2 on the inside, and 3 & 4 on the outside. Trains usually stop at the middle 2 platforms (platforms 1 and 2), with the express trains also passing through the middle tracks.
Exits
There are 2 exits, lettered A and B. Both exits are accessible and are located on Guangshan Highway.
Gallery
- Platform 3
- Concourse
- Exit A
- Exit B
- Exterior
References
- "二十一号线真的官宣来啦!". 19 December 2019.
- "国内首个绿色建筑三星认证地铁站落户广州地铁二十一号线". Yangcheng Evening News. 2019-12-17.