Shenzhoulu station
Shenzhoulu station[1] (Chinese: 神舟路站; pinyin: Shénzhōulù zhàn), is a station of Line 21 on the Guangzhou Metro. It started operations on 20 December 2019.
Chinese name | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 神舟路站 | ||||||||||||||
Traditional Chinese | 神舟路站 | ||||||||||||||
| |||||||||||||||
General information | |||||||||||||||
Location | West side of the junction of Kexue Avenue (科学大道) and Shenzhou Road (神舟路) Huangpu District, Guangzhou, Guangdong China | ||||||||||||||
Coordinates | 23°17′04″N 113°35′35″E | ||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||
Line(s) | |||||||||||||||
Platforms | 2 (1 island platform) | ||||||||||||||
Tracks | 2 | ||||||||||||||
Construction | |||||||||||||||
Structure type | Underground | ||||||||||||||
Accessible | Yes | ||||||||||||||
Other information | |||||||||||||||
Station code |
| ||||||||||||||
History | |||||||||||||||
Opened | 20 December 2019 | ||||||||||||||
Services | |||||||||||||||
|
The station has an underground island platform. Platform 1 is for trains heading to Zengcheng Square, whilst platform 2 is for trains heading to Yuancun.
Exits
There are 2 exits, lettered A and B. Exit B is accessible. Both exits are located on Kexue (Science) Avenue.
Gallery
- Concourse
- Exit A
- Exit B
Operational accident
At around 13:00 on July 30, 2021, short-term heavy rainfall occurred in Guangzhou. The ground retaining wall of a reserved exit under construction collapsed, causing ground water to flow into the station through the exit. The subway company immediately terminated the service between Huangcun station and Suyuan station. All passengers stranded in the station were evacuated without causing casualties. After that, the water inlet was also blocked. During the period, the subway company also arranged for shuttle buses to walk thought the two stations.[2] At 19:15, the subway company announced that the blocked section open for service, but the station still suspends operations, and the train passes through the station without stopping. At 20:00 that day, the station resumed operations.[3] The accident attracted attention due to the serious flooding of Zhengzhou Metro Line 5 that occurred before.[4] After the investigation, it was confirmed that a retaining wall that did not meet the quality requirements was built illegally for the construction site near the exit. The water retaining wall collapsed during the heavy rain, causing water into the exit. Relevant management personnel were subject to administrative punishment or disciplinary action within the Party.[5]
References
- "广州地铁线网示意图 Guangzhou Metro System Map". gzmtr.com. Archived from the original on 30 September 2021. Retrieved 30 September 2021.
- 林钢威; 李佳文; 黄嘉丰; 罗清峣 (30 July 2021). "广州地铁21号线神舟路站进水原因公布:预留出入口挡水墙倒塌令积水涌入". 新快报.
- 李佳文 (30 July 2021). "广州地铁二十一号线员村至增城广场方向恢复通车". 新快报.
- 蔡紹堅 (30 July 2021). "暴雨灌入廣州地鐵!乘客逃竄躲洪水「想到鄭州的慘案」". ETtoday新聞雲.
- "广州地铁二十一号线神舟路站"7.30"在建出入口挡水墙倒塌致地铁进水一般事故调查报告" (PDF). 广州市应急管理局. 14 September 2021. Archived from the original (PDF) on 15 September 2021. Retrieved 15 September 2021.