Line 19 (Shenzhen Metro)
Line 19 of the Shenzhen Metro is a line under planning, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations.[1] Construction is planned to begin in 2023. The first phase of Line 19 has entered Phase V planning, and will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track.[2][3] The line is proposed to use 6 car type B trains.[4]
Line 19 | |
---|---|
19 | |
Overview | |
Status | Under planning |
Locale | Shenzhen, Guangdong |
Termini | |
Stations | 12 (Phase 1) |
Service | |
Type | Rapid transit |
System | Shenzhen Metro |
Services | 1 |
Operator(s) | SZMC (Shenzhen Metro Group) |
Technical | |
Line length | 12.5km (Phase 1) |
Character | Underground |
Operating speed | 80km/h |
Stations (Phase 1)
Station name | Connections | Location | ||||
---|---|---|---|---|---|---|
English | Chinese | |||||
Nantangwei | 南塘围 | Pingshan | ||||
People's Hospital | 人民医院 | |||||
Tang-keng | 汤坑 | |||||
Jinlong | 锦龙 | 14 | ||||
Xinwei | 新围 | |||||
Baoshan | 宝山 | |||||
Xinhe | 新和 | 16 | ||||
Culture Center | 文化中心 | Pingshan SkyShuttle Line 1 | ||||
Pingshan Center | 坪山中心 | 14 Pingshan SkyShuttle Line 1 | ||||
Lanzhu Road | 兰竹路 | |||||
Lijing | 荔景 | |||||
Julong | 聚龙 | |||||
References
- 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
- 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
- 深圳地铁五期规划建设13条线路 年底运营里程将破500公里. new.qq.com. 2022-09-07.
- 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.