Line 25 (Shenzhen Metro)

Line 25 of the Shenzhen Metro is a line under planning, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations.[1] Construction is planned to begin in 2023. The first phase of Line 25 has entered Phase V planning, and will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track.[2] The line is proposed to use 6 car type B trains.[3]

Line 25
25
Overview
StatusUnder planning
LocaleShenzhen, Guangdong
Termini
  • Jihua Hospital (Phase 1)
    Future: Wenjindu
  • Shilong (Phase 1)
    Future: Shiyan
Stations14 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length16.2km (Phase 1)
CharacterUnderground
Operating speed80km/h

Stations (Phase 1)

Station name Connections Location
English Chinese
Jihua Hospital 吉华医院 Longgang
Bei'er Road 贝尔路 10
Huangjun Hill 黄君山
Shangyousong 上油松 Longhua
Yousong 油松  22 
Youfu 油福  27 
Jinglong 景龙
Longhua 龙华 4
Longhua Park 龙华公园
Huafu 华富
Huachang 华昌
Shi'ao 石凹
Creative City 创意城
Shilong 石龙 Bao'an

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.