MRT Line 5 (Southern Route)

The Southern Route (Bengali: সাউদার্ন রুট) is one of the branches of the approved MRT Line 5 line of Dhaka Metro Rail; the other one being the Northern Route. This route is currently in its planning stages. The construction of the southern route is will start in June 2024 and is scheduled to commence operation by 2030 or 2031.

Mass Rapid Transit Line 5
Southern Route
Overview
StatusApproved
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Termini
  • Gabtoli (West)
  • Dasherkandi (East)
Stations15
Colour on map     Orange (#EE830B)
Service
TypeRapid transit
SystemDhaka Metro Rail
Operator(s)Dhaka Mass Transit Company Limited
Depot(s)Dasherkandi, Badda Thana
Technical
Line length17.3 kilometres (10.7 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

History

In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[1] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[2] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[3] On 11 December 2019, Dhaka Mass Transit Company Limited (DMTCL) signed a loan agreement with the Asian Development Bank (ADB) for pre-construction work of US$33.26 million, which was 74.60% of the required amount.[4] On 29 March 2021, EGIS Rail SA, Egis India Consulting Engineers Pvt Ltd, Oriental Consultants Global Company Ltd and SMEC International Pvt. Ltd signed a memorandum of understanding with DMTCL for the consultancy of the route. As per the agreement, the companies jointly undertook feasibility study, detailed design and procurement for the route.[5] The route of the Southern Route was initially fixed from Gabtoli to Trimohani Bridge area. The location of two underground stations on this route was decided at College Gate and Asad Gate which are located near Ganabhaban. DMTCL planned to conduct a survey to determine the location of the two stations. It was necessary to obtain permission from the Prime Minister's Office to carry out a survey near the important building. As of 2022, A coordination meeting was to be held to resolve the complications in determining the alignment of the route.[6] The total budget of the Southern Route construction project is estimated at US$4.7 billion, of which ADB is expected to contribute 53.19%. But in a stakeholder meeting on 26 February 2023, the government requested ADB to pay 6.38% more.[7] Under the project, there are plans to build two transit oriented hubs at Gabtoli and Dasherkandi. Construction of the route is scheduled to begin in June 2024.[8]

Stations

The MRT Line 5's Southern Route has 15 proposed stations. 4 stations will be underground and 11 stations will be elevated.

Code Name Connections Location Opened
English Bengali
1 Gabtoli গাবতলী  MRT Line 2 
 MRT Line 5N 
Mirpur Model Thana Planned
2 Technical টেকনিক্যাল Darus Salam Thana
3 Kallyanpur কল্যাণপুর Kallyanpur
4 Shyamoli শ্যামলী Adabar Thana
5 College Gate কলেজ গেট Tejgaon Thana
6 Asad Gate আসাদ গেট Mohammadpur Thana
7 Russel Square রাসেল স্কয়ার Dhanmondi Thana
8 Kawran Bazar কাওরান বাজার  MRT Line 6  Tejgaon Thana
9 Hatirjheel হাতিরঝিল Hatirjheel Thana
10 Tejgaon তেজগাঁও Tejgaon Thana
11 Aftabnagar আফতাবনগর  MRT Line 1  Gulshan Thana
12 Aftabnagar Center আফতাবনগর সেন্টার
13 Aftabnagar East আফতাবনগর পশ্চিম
11 Nasirabad নাসিরাবাদ Badda Thana
15 Dasherkandi দাশেরকান্দি

References

  1. Rahman, Shamim (23 December 2022). "পুরোটাই উড়ালপথে নির্মাণ ভারতের 'মেট্রো ম্যান' শ্রীধরনের পরামর্শে". Bonikbarta.net (in Bengali). Archived from the original on 26 December 2022. Retrieved 26 December 2022.
  2. Zaman, Sheikh Shahriar (25 December 2022). "মেট্রোরেল ছিল বিরাট এক চ্যালেঞ্জ". Bangla Tribune (in Bengali). Archived from the original on 25 December 2022. Retrieved 26 December 2022.
  3. "এয়ারপোর্ট থেকে কমলাপুর আন্ডারগ্রাউন্ড লাইন হচ্ছে". Kaler Kantho (in Bengali). 14 October 2019. Archived from the original on 9 December 2019. Retrieved 10 March 2023.
  4. Karim Byron, Rejaul (12 December 2019). "Another MRT line in the offing". The Daily Star. Retrieved 25 June 2023.
  5. Sultana, Munima (31 March 2021). "General consultant appointed for studying another metro rail". Thefinancialexpress.com.bd. Retrieved 25 June 2023.
  6. Islam, Tawhidul (11 February 2022). "গণভবনের সামনে মেট্রোরেলের স্থান নির্ধারণে জটিলতা". Amader Shomoy (in Bengali). Retrieved 25 June 2023.
  7. "এমআরটি লাইন-৫ : এডিবির কাছে আরও ৩০০ মিলিয়ন ডলার চায় সরকার". Dhaka Post (in Bengali). 26 February 2023. Retrieved 25 June 2023.
  8. "এমআরটি-৫-এর কাজ শুরু হতে পারে আগামী বছরের জুনে". Kaler Kantho (in Bengali). 27 February 2023. Retrieved 25 June 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.