Dhaka Metro Rail

The Dhaka Metro Rail (Bengali: ঢাকা মেট্রোরেল), or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited (DMTCL).[1] Together with the proposed Dhaka subway, it is expected to reduce traffic congestion in the city. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority (DTCA).[6]

Multiple-use MRT Pass contactless smart card of Dhaka Metro Rail which is also Rapid Pass compatible.

Dhaka Metro Rail
Top: Outside view of Uttara North metro stationBottom: Train entering at the platform of Agargaon metro station
Top: Outside view of Uttara North metro station
Bottom: Train entering at the platform of Agargaon metro station
Overview
Native nameঢাকা মেট্রোরেল
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Transit typeMass Rapid Transit
Number of lines
  • 1 partly operational and partly under construction
  • 1 under construction
  • 3 more planned
Line number
Number of stationsTotal 103 stations (planned):[1]
  • MRT Line 6: 17 (9 operational)
Some stations will be conjuncted with multiple lines
Key people
  • Md. Nazrul Islam (Chairman)
  • M. A. N. Siddique (Managing Director)[2]
HeadquartersProbashi Kallyan Bhaban, Old Elephant Road, Dhaka[3]
Websitewww.dmtcl.gov.bd
Operation
Began operation29 December 2022 (2022-12-29)
Operator(s)Dhaka Mass Transit Company Limited
Number of vehiclesMTR 6: 12 pairs of trains (total 24 trains)[4]
Train length6 coaches
Technical
System length11.73 km (7.29 mi)
Track gaugeStandard gauge
Electrification1500V DC via Overhead
Average speed30 km/h (19 mph)[5]
Top speed100 km/h (62 mph)[5]

The network is planned to contain six lines, with the first section of MRT Line 6 commencing commercial operations on 29 December 2022, and the other lines being either in planning or under construction.[7][8] The construction of MRT Line 6's second section is scheduled to be completed during 2023.[9] The third phase, which will have an interchange with Line 1, Line 2 and Line 4, is set to be completed by 2026.[10][11][12] Further expansion of MRT Line 6 is planned, with the hope of extending it towards Tongi in Gazipur metropolitan and Savar Upazila.

History

In an effort to implement Dhaka's 20-year-long Strategic Transport Plan, the Government of Bangladesh invited the Japan International Cooperation Agency to conduct a primary survey and feasibility study on the transport system of Dhaka in 2009–2010. In 2012, the Executive Committee of the National Economic Council approved the project. A loan agreement between the Bangladeshi government and the Japanese International Cooperation Agency was signed in January 2013.

Dhaka Mass Transit Company Limited, the agency responsible for the implementation of the first metro line, was formed in January 2013. The General Consultant, namely the NKDM Association, commenced work beginning in February 2014. In June 2013, Dhaka Mass Transit Company Limited was established by the Government to implement the Metro Rail Lines across the city.[13]

Construction

Line-6 under construction in 2020

The deal for construction of the MRT Line-6, costing US$2.8 billion, was signed by the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.[14] Construction began on 26 June 2016 with an inauguration ceremony presided over by the prime minister Sheikh Hasina.[15] Civil engineering work was done by the Italian-Thai Development Public Company Ltd. and China's Sinohydro Corporation Ltd. JV, and a Tokyo-based construction company developed the depot's land.[16][17]

Construction work was divided into eight packages, covering aspects like depots, stations and rolling stock.[18]

Planning

When construction commenced in 2016, the Metro Rail was expected to open by the end of 2019.[15] By 2018, this expectation was still held to, but by 2019, completion of phase one was delayed to December 2021.[19] In 2018, the second phase was expected to be complete by December 2020.[19][20] Eventually, these dates were pushed back, with phase one opening in 2022 and phase two expected in 2023.[21] The main reason for the delays from 2020 to 2022 was the COVID-19 pandemic.[22]

Cost and length changes

Originally, the project cost was Tk 219,850 million but it was later increased by Tk 114,870 million to Tk 334,720 million, although the full Project is not yet completed. The first route, originally projected to start from Uttara, a northern area of Dhaka, to Sayedabad, in the south of the capital,[23] was eventually extended north to Uttara and truncated south to Motijheel.[24] The original length which was 20.10 km (12.49 mi) has been increased by 1.16 km to 21.26 km (13.21 mi). It was planned to have 16 stations originally but it has been increased to 17 stations.[25]

Misconceptions

The project was originally reported to be a 27 km (17 mi) underground metro rail line. It was later confirmed to be an elevated and underground metro rail project.[26] In 2014, it was reported that 56 trains would run on the metro system.[27] It was confirmed that 24 vehicles would run on the MRT Line-6.[19] It was planned to have six lines.

Trial runs

MRT Line-6's train made its first run on 29 August 2021. It traveled from Diabari Depot to Mirpur 12. It successfully made its second run on 29 November 2021. It traveled from Uttara to Mirpur 10. The line's train made its longest trial run on 12 December 2021. It traveled from Uttara to Agargaon. The train ran for 11.3 km (7.0 mi). It ran at 100 km/h for 9 km (5.6 mi) and ran at 15–20 km (9.3–12.4 mi) for the rest.[28]

Overview

Line 6 consists of 16 elevated stations of 180m length each, and 20.1 km (12.5 mi) of electricity-powered light rail tracks. All of line 6, save for the depot and some of its accompanying LRT, will be elevated above current roads. Mostly, this will be above road medians to allow traffic flow underneath, with stations also elevated. The Dhaka Metro is projected to serve more than 60,000 passengers per hour by 2022, with headways of approximately 4 minutes.[29] The entire route can be travelled in less than 40 minutes at a speed of 100 km/h (62 mph), and is expected to drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long standstills.[30][31] The system plans to use magnetic contactless Integrated Circuit Ticketing, commonly known as smart cards.[6] Platform screen door (PSD) barriers used at the platform level will increase safety and increase efficiency.[6] Trains of six spacious air-conditioned cars will arrive every four minutes going each way at each of the 16 stations.[31]

The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a consortium of foreign and Bangladeshi firms known as the NKDM Association is acting as the project's general consultant. The NKDM Association consists of Nippon Koei Japan and Development Design Consultants (local consultant - Bangladesh).

Network

Operational

Line First run Stations Length (km) Terminals Depot
MRT 6
First Phase
29 December 2022 Uttara North, Uttara Center, Uttara South, Pallabi, Mirpur-11, Mirpur-10, Kazipara, Shewrapara, Agargaon[32] 9[32] 11.73[32] Uttara Terminal Agargaon Uttara Terminal

Under construction/planned

Line Expected completion Stations Length (km) Terminals Interchange Stations Depot
MRT 1
(Airport Route)
2026 Shahjalal International Airport Shahjalal International Airport Terminal 3, Khilkhet, Jamuna Future Park, Baridhara, North Badda, Central Badda, Banasree, Rampura, Malibagh, Rajarbagh, Kamalapur Railway Station 21[lower-alpha 1]
31.[lower-alpha 1][33]
Shahjalal International Airport Kamalapur Railway Station Kamalapur Railway Station (MRT Line 1, 2, 4, 6), Baridhara (MRT Line 1, 5 North) Rupganj
MRT 1
(Purbachal Route)
Baridhara, Jamuna Future Park, Bashundhara, POHS, Pink City, Purbachal West, Purbachal Central, Purbachal East, Purbachal Terminal Baridhara Purbachal Terminal
MRT 2 2030 Gabtoli, Embankment Road, Bosila, Mohammadpur, Lalmatia, Dhanmondi-27, Sat Masjid Road, Zigatola, Dhanmondi-2, Science Laboratory, Elephant Road, New Market, Nilkhet, BUET, Azimpur, Dhaka Medical College, Wari, Motijheel, Arambagh, Kamalapur Railway Station, Mugda, Manda, Demra, Chittagong Road 22 24[34] Gabtoli Chittagong Road Gabotoli (MRT Line-5 North and South), Kamalapur Railway Station (MRT Line 1, 2, 4, 6) Hemayetpur
MRT 4 2031 Kamalapur Railway Station, Narayanganj 15 16[34] Kamalapur Railway Station Narayonganj Kamalapur Railway Station (MRT Line 1, 2, 4, 6)
MRT 5
(Northern Route)
2028 Hemayetpur, Baliarpur, Bilamalia, Amin Bazar, Gabtoli, Technical, Mirpur 1, Mirpur 10, Mirpur 14, Cantonment, Banani, Gulshan-2, Baridhara, Madani Avenue, United City 14 20 Hemayetpur United City Gabtoli (MRT Line-5 North and South), Notun Bazar (MRT Line 1, 5) Hemayetpur
MRT 5
(Southern Route)
2029 Gabtoli, Technical Circle, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russell Square, West Panthapath, Karwan Bazar, Hatirjheel, Tejgaon, Niketon, Aftabnagar West, Aftabnagar Central, Aftabnagar East and Aftabnagar Terminal 16 17.4 Gabtoli Aftabnagar Terminal Gabtoli (MRT Line-5 North and South) Aftabnagar Terminal
MRT 6
Second Phase
October 2023 Bijoy Sarani, Farmgate, Kawran Bazar, Shahbagh, Dhaka University, Bangladesh Secretariat, Motijheel 8 9.53 Uttara Terminal Kamalapur Railway Station Kamalapur Railway Station (MRT Line 1, 2, 4, 6) Uttara Terminal
MRT 6

Third Phase

2025 Kamalapur 1 1.17 Uttara Terminal Kamalapur Railway Station
Total 104[lower-alpha 2] 128.7[lower-alpha 3]
Dhaka Metro
Shahjalal
International Airport Shahjalal International Airport
 1  Airport
Shahjalal International
Airport Terminal 3 Shahjalal International Airport
 6 
Uttara Terminal
Khilkhet
Uttara North
Purbachal Terminal
 1  Purbachal
Uttara Center
Purbachal East
Uttara South
Purbachal Central
Pallabi
Purbachal West
Mirpur 11
Pink City
 5  Northern
Hemayetpur
POHS
Depot (5 Northern)
Bashundhara
Baliarpur
Jamuna Future Park
Bilamalia
Bhatara
 5  Northern
Amin Bazar
Nutun Bazar
 1  Purbachal
 2   5  Southern
Gabtoli
Gulshan-2
Darus Salam
Banani
Mirpur 1
Kachukhet
Mirpur 10
Mirpur 14
Technical Circle
Kallyanpur
NorthBadda
Shyamoli
Badda
College Gate
Asad Gate
Dasherkandi
 5  Southern
Russel Square
Depot (5 Southern)
Kazipara
Aftabnagar East
Shewrapara
Aftabnagar Center
 6 
Agargaon
Aftabnagar West
Bijoy Sarani
Parliament
Niketon
Farmgate
Tejgaon
Karwan Bazar
Hatirjheel East
Shahbagh
National Museum
Rampura
Dhaka university
Malibagh
Press Club
Rajarbagh
Motijheel
Bangladesh Bank
Kamalapur
 1  Airport  4   6 
 4 
Narayanganj
Chittagong Road
 2 

Lines 2, 4 and 5 (Southern) may change in the future

Lines

MRT Line-1

Airport Route

The construction of the 19.872 km (12.348 mi) long underground line, MRT Line-1 (Airport Route), is set to begin in December 2022, costing US$6.1 billion after many delays. Its deadline is set for 2026.[37] It will start from Shahjalal International Airport and stop at Kamalapur Railway Station. The line will have 12 underground stations. Stations will be constructed at Shahjalal International Airport, Shahjalal International Airport Terminal 3, Khilkhet, Jamuna Future Park, Notun Bazar, Uttar Badda, Badda, Hatirjheel East, Rampura, Malibagh, Rajarbagh and Kamalapur Railway Station. MRT Line-1 will have an interchange of MRT Line-6, MRT Line-2 and MRT Line-4 at Kamalapur Railway Station. There will be interchange for the MRT Line-5 Northern Route and the MRT Line-1's Purbachal route at the Notun Bazar. Hatirjheel East of MRT Line-1 and Aftab Nagar West Station of MRT Line-5: Southern Route will have Interchange. Above all, the airport will have an interchange of MRT Line-1 with BRT Line-3.[33] The government will provide US$1.5 billion while the Japan International Cooperation Agency (JICA) will fund US$4.6 billion.[38] The use of soundless TBMs will make it possible to build MRT-1's underground infrastructure without disrupting the daily lives of residents and businesses.

Purbachal Route

MRT Line-1 (Purbachal Route) will be 11.369 km (7.064 mi) long and it will have stations at Notun Bazar, Jamuna Future Park, Bashundhara, Police Officers’ Housing Society, Mastul, Purbachal West, Purbachal Centre, Purbachal Sector-7 and Purbachal depot. Of these stations, Notun Bazar and Jamuna Future Park would be underground as a part of the airport route.[39]

MRT Line-2

MRT Line-2 will connect Gabtali with Chittagong Road. The stations on this route are - Gabtali, Embankment Road, Basila, Mohammadpur, Lalmatia, Dhanmondi-27, Sat Masjid Road, Jigatola, Dhanmondi-2, Science Laboratory, Elephant Road, New Market, Nilkhet, BUET, Azimpur, Dhaka Medical College. Wari, Motijheel, Arambagh, Kamalapur Railway Station, Mugda, Manda, Demra and finally Chittagong Road. The length of this line will be 24 km (15 mi). It will cost about 3 billion dollars.

MRT Line-4

MRT Line-4 will connect Kamalapur Railway Station with Narayanganj with elevated and underground lines (planned).[39] Length of this line will be 16 km (9.9 mi). According to a survey conducted by Japan International Cooperation Agency (JICA), MRT Line-4 will run parallel to an existing line which will be converted to a dual gauge railway line by the order of the Bangladesh Railway Authority. MRT Line-4 may not be financially viable.[40]

MRT Line-5

Northern Route

Construction of MRT Line-5 (Northern Route) will begin in September 2023.[41] MRT Line-5 (Northern Route) will start from Hemayetpur of Savar Upazila and end at Vatara (at Bashundhara), costing US$4.85 billion.[39] It expected to be 20 km (12 mi) long in total.[39] Northern route will be 13.5 km (8.4 mi) underground and 6.5 km (4.0 mi) elevated. It will have 14 stations, of which 9 stations will be underground. Those underground stations will be constructed at Gabtoli, Darus Salam, Mirpur 1, Mirpur 10, Mirpur 14, Kachukhet, Banani, Gulshan-2 and Notun Bazar. 5 stations will be elevated. 5 elevated stations will be constructed at Hemayetpur, Baliarpur, Bilamalia, Amin Bazar and Vatara (at Bashundhara R/A). MRT Line-5 (Northern Route) will have depot at Hemayetpur of Savar Upazila.[42]

Southern Route

The MRT Line-5 (Southern Route), which is about 17.4 km (10.8 mi) long, is expected to be operational between 2027-2030. It will connect Gabtoli with Dasherkandi. The stations on this route are Gabtoli, Technical Circle, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russell Square, West Panthapath, Karwan Bazar, Hatirjheel, Tejgaon, Niketon, Aftabnagar West, Aftabnagar Center, Aftabnagar East and lastly Dasherkandi. It is possible to interchange with MRT 5 (Northern Route).

MRT Line-6

MRT Line-6 has 17 elevated stations each 180 meters long and 21.26 km (13.21 mi) of electric light rail track (LRT). All Line-6 and some attending LRTs, except the depot, have been elevated above the existing roads to allow traffic flow below.

This line consists of three phases, of which only the first is currently operational.

  • Opened on 29 December 2022, from Uttara North to Agargaon. 11.73 kilometers (7.29 mi)
  • Slated for completion by October 2023, from Agargaon to Motijheel. 8.37 kilometers (5.20 mi)
  • Slated for completion in December 2025, from Motijheel to Kamalapur. 1.16 kilometers (0.72 mi)

Operations

Fare and ticketing

The fares range from minimum ৳20 to maximum ৳100 (for MRT line 6). Passengers can get 10% discount for paying fares on either MRT pass or Rapid Pass. Each of the multiple-use contactless smart card has almost the same facilities.[43] On the other hand single-use contactless smart card ticket can be bought from ticket vending machines at the station. The passenger will have to leave the single-use card after completing the journey.

See also

Notes

  1. The airport route will have 12 underground stations and the Purbachal route will have 9 elevated stations. The airport route will be 19.9 km (12.4 mi) and the Purbachal route will be 11.7 km (7.3 mi).[33]
  2. if interchanges are counted multiple times.[35]
  3. The network is planned to contain six lines (Counting MRT Line-1 as one line) with a total mileage of 128.741 kilometres (79.996 mi). MRT Line-6 is already under construction. Other lines are being planned.[36]

References

  1. "ঢাকা ম্যাস ট্রানজিট কোম্পানি লিমিটেড (ডিএমটিসিএল)" (in Bengali). Archived from the original on 29 May 2023. Retrieved 12 July 2023.
  2. "Chairman, Managing director of company". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
  3. "headquarter". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
  4. "Dhaka Metro Rail: Integrated test, trial run to begin soon". www.dhakatribune.com. 5 January 2022. Retrieved 7 February 2022.
  5. "ঢাকা পরিবহন সমন্বয় কর্তৃপক্ষ". www.dtca.gov.bd. Archived from the original on 6 October 2021. Retrieved 6 October 2021.
  6. "About MRT Line-6". DHAKA MASS TRANSIT COMPANY LTD. DHAKA MASS TRANSIT COMPANY LTD. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
  7. "PM Hasina becomes first passenger to travel on Metro Rail with ticket". 28 December 2022.
  8. Staff Correspondent. "Passengers gather at Dhaka metro stations at first light". bdnews24.com. Retrieved 29 December 2022.
  9. Datta Gupta, Titu (27 December 2022). "Metro magic is here, now". The Business Standard. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
  10. Staff Correspondent (13 December 2021). "Metro Rail: Roll-out on Victory Day next year". The Daily Star. Retrieved 2 February 2023.
  11. হোসেন, আনোয়ার. "প্রযুক্তির চমক মেট্রোরেলে". Prothomalo (in Bengali). Retrieved 2 February 2023.
  12. "Redirect Notice". www.google.com. February 2023. Retrieved 2 February 2023.
  13. "About DMTC Line 6- The Official Website for the Dhaka MRT Project". DHAKA MASS TRANSIT COMPANY LTD. DHAKA MASS TRANSIT COMPANY LTD. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
  14. "Bangladesh, Japan strike deal for $2.81-bln Dhaka metro rail". GlobalPost. 20 February 2013. Archived from the original on 21 May 2013. Retrieved 21 May 2013.
  15. "PM opens work on metro, BRT". The Daily Star. 27 June 2016. Archived from the original on 7 August 2016. Retrieved 25 July 2016.
  16. "Just 12% progress made in metro rail project in 4 years". Dhaka Tribune. 12 October 2017. Archived from the original on 27 February 2018. Retrieved 26 February 2018.
  17. "Building Bangladesh's first Mass Rapid Transit System". Archived from the original on 2 August 2021. Retrieved 3 August 2021.
  18. "Document MRT Line-6" (PDF). Retrieved 29 November 2022.
  19. Report, Star Online (30 April 2018). "Fact box: All you need to know about metro rail project". The Daily Star. Retrieved 29 November 2022.
  20. Report, Star Online (29 May 2019). "Metro rail service delayed by 1yr, to be launched Dec 2021". The Daily Star. Retrieved 29 November 2022.
  21. Express, The Financial. "Dhaka metro-rail travel turning real". The Financial Express. Retrieved 4 December 2022.
  22. Ahmed, Zafar. "Metro rail, first in Bangladesh, was delayed by COVID-19. A new date is far off". bdnews24.com. Retrieved 29 November 2022.
  23. "Muhith to sit with armed forces to resolve metro rail site dispute". The Financial Express. 25 June 2011. Archived from the original on 29 June 2011. Retrieved 25 June 2011.
  24. "In 37 minutes". 26 June 2016. Archived from the original on 16 July 2016. Retrieved 25 July 2016.
  25. Adhikary, Tuhin Shubhra; Byron, Rejaul Karim (18 July 2022). "Dhaka Metro Rail now set to cost 50% more". The Daily Star. Retrieved 29 November 2022.
  26. "Dhaka Metro likely by 2013". Dhaka Mirror. 28 May 2010. Retrieved 29 November 2022.
  27. Ahmed, Shamim. "Dhaka Metrorail to carry 60,000 people per hour". bdnews24.com. Retrieved 29 November 2022.
  28. "Metro rail completes biggest test trip so far". The Business Standard. 12 December 2021. Retrieved 4 December 2022.
  29. Ahmed, Shamim. "Dhaka Metrorail to carry 60,000 people per hour". bdnews24.com. Archived from the original on 18 February 2019. Retrieved 17 February 2019.
  30. "Traffic chaos reigns in Bangladesh". The Star. Archived from the original on 15 June 2021. Retrieved 17 February 2019.
  31. "Metro rail construction in progress". Daily Sun. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
  32. Staff Correspondent (13 December 2021). "Metro Rail: Roll-out on Victory Day next year". The Daily Star. Retrieved 14 February 2022.
  33. "DHAKA MASS TRANSIT COMPANY LIMITED (DMTCL)". dmtcl.gov.bd. Archived from the original on 27 June 2021. Retrieved 8 October 2021.
  34. "Progress of MRT Line 4 and Info of other MRT lines". www.dmtcl.gov.bd. Archived from the original on 28 June 2021. Retrieved 18 July 2021.
  35. "Stations quantity". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
  36. "At a Glance". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
  37. "Dhaka's first underground metro work begins in December". The Business Standard. 23 October 2022. Retrieved 22 November 2022.
  38. "Construction of Bangladesh's first underground metro line to begin March 2022". Dhaka Tribune. 17 June 2021. Archived from the original on 21 September 2021. Retrieved 22 September 2021.
  39. Byron, Rejaul Karim; Adhikary, Tuhin Shubhra (15 October 2019). "Dhaka Metro Rail: Two more lines to cost Tk 93,800cr". The Daily Star. Archived from the original on 24 January 2020. Retrieved 8 October 2021.
  40. "Big relief for commuters only after 2030". The Business Standard. 14 October 2021. Retrieved 6 December 2021.
  41. Adhikary, Tuhin Shubhra (10 June 2022). "Fast-Track Projects: Debt repayment a worry now". The Daily Star. Retrieved 10 June 2022.
  42. "DHAKA MASS TRANSIT COMPANY LIMITED (DMTCL)". dmtcl.gov.bd. Archived from the original on 28 June 2021. Retrieved 8 October 2021.
  43. "Metro rail commuters to get 10% discount by paying fares on smart cards". 8 September 2022. Archived from the original on 9 September 2022. Retrieved 12 July 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.