Motijheel metro station

Motijheel metro station (Bengali: মতিঝিল মেট্রো স্টেশন, romanised: Môtijhil mēṭrō sṭēśôn) is a metro station of the Dhaka Metro's MRT Line 6. This station is located in the area of Dilkusha towards Motijheel. It is scheduled to commence operations by November 2023.[2]

Motijheel

মতিঝিল
Dhaka Metro Rail station
General information
Other namesStation 16
LocationMotijheel Road, Dilkusha, Dhaka
Bangladesh
Coordinates23.7280611°N 90.4190611°E / 23.7280611; 90.4190611
Owned byDhaka Mass Transit Company Limited
Line(s) MRT Line 2 
 MRT Line 6 
PlatformsSide platform
Tracks2
Bus operatorsBRTC
ConnectionsBus interchange Bus stand
Construction
Structure typeElevated
Platform levels3
ParkingNo
Bicycle facilitiesNo
AccessibleYes Disabled access
History
OpeningNovember 2023 (2023-11)
Electrified1,500 V DC overhead catenary
Services
Preceding station Dhaka Metro Following station
Dilkusha Road
towards Gabtoli
MRT Line 2 Arambagh
towards Narayanganj
Bangladesh Secretariat
towards Uttara North
MRT Line 6 Kamalapur
Terminus
Location

History

The station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. The Italian-Thai Development Public Company Limited received the work contract for "Package CP-03". The agreement was signed in a ceremony on 3 May 2017, and construction work started on 2 August 2017.[3][4]

In 2019, the extension of MRT Line 6 from Motijheel to Kamalapur was planned by the government.[5] As of December 2022, the construction of the station was in progress and the installation of the roof sheet of the station was in progress.[6] The extension work started in January 2023.[7]

Station

Station layout

G Path level Exit / Entry
L1 Between Rent control, station agent, metro card vending machine, crossover
L2 Side platform no. 1, the left door will openDisabled access
Southbound towards → Kamalapur
Northbound towards ←Bangladesh Secretariat
Side platform no. 2, the left door will openDisabled access
L2

References

  1. "Line 6 route map" (PDF). Dhaka Mass Transit Company Limited. Retrieved 23 December 2022.
  2. "মেট্রোরেল: আগারগাঁও-মতিঝিল পর্যন্ত চালু নভেম্বরের মধ্যে". The Daily Star (in Bengali). 13 April 2023. Archived from the original on 21 April 2023. Retrieved 8 May 2023.
  3. "CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon)". 17 March 2020. Archived from the original on 15 January 2022. Retrieved 15 January 2022.
  4. "Construction of Metro rail and station starts today". The Asian Age. 2 August 2017. Archived from the original on 15 January 2022. Retrieved 15 January 2022.
  5. Adhikari, Tuhin Subhra (6 December 2019). "Metro Line-6 to link Kamalapur". The Daily Star. Archived from the original on 29 November 2022. Retrieved 27 December 2022.
  6. "প্রেসক্লাব-মতিঝিলে মেট্রোরেলের 'দুর্ভোগ' সহ্য করতে হবে আরও ১ বছর". Sarabangla.net (in Bengali). 23 December 2022. Retrieved 20 May 2023.
  7. "মেট্রোরেলের কমলাপুর অংশের নির্মাণকাজ শুরু". Daily Inqilab (in Bengali). 13 January 2023. Archived from the original on 23 January 2023. Retrieved 23 January 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.