List of offshore wind farms in the United Kingdom
This is a list of offshore wind farms within the national maritime boundaries of the United Kingdom. The name of the wind farm is the name used by the energy company when referring to the farm; it is usually related to the name of the nearest town on shore.[1][2][3]
![](../I/Thames_Estuary_and_Wind_Farms_from_Space_NASA_with_annotations.jpg.webp)
In October 2023 the nameplate capacity of offshore wind farms in operation was approximately 14GW, with a further 4GW under construction. Contracts to subsidize a further 9GW (one wind farm is only partially contracted) have been awarded by the UK Government.
If all the proposed wind farms are developed, then in the 2030s the United Kingdom would have a nameplate capacity of 73GW.
Operational offshore wind farms
In October 2023, there were offshore wind farms consisting of 2,695 turbines with a combined capacity of 14,703 Megawatts. Strike price based on £/MWh at 2012 prices.
Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning |
Strike Price | Build cost |
Cap. fac. |
Depth range (m) |
km to shore |
Owner | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Barrow | England | 53°59′00″N 3°17′00″W | 90 | 30 | Vestas V90-3.0MW | July 2006 | £123m | 35.9%[4] | 15–20 | 7 | Ørsted | [w 1][5] | |
Beatrice | Scotland | 58°06′20″N 03°05′35″W | 10 | 2 | REpower 5M | July 2007 | £35m | 20% | 45 | 23 | SSE, Talisman Energy | [w 2][6] | |
Beatrice extension | Scotland | 58°06′20″N 03°05′35″W | 588 | 84 | Siemens Gamesa 7MW | July 2019 | 140 | £2,600m | 45 | 23 | SSE Talisman Energy | [7][8][9] | |
Blyth Offshore Demonstrator | England | 41.5 | 5 | Vestas V164-8MW | 2017 | 50-60 | 6.5 | EDF Renewables | [10][11] | ||||
Burbo Bank | England | 53°29′00″N 3°11′00″W | 90 | 25 | Siemens SWP 3.6–107 | September 2007 | £90m | 32–35% | 0–6 | 7 | Ørsted | [w 3][12] | |
Burbo Bank Extension | England | 53°29′00″N 3°11′00″W | 258 | 32 | Vestas V164 8.0 MW | April 2017 | 6–13 | Ørsted | |||||
Dudgeon | England | 53°15′00″N 1°23′00″E | 402 | 67 | Siemens SWT-6.0–154 | October 2017 | £1,500m | 48% | Equinor, Statkraft | [13][14] | |||
East Anglia One | England | 52°14′04″N 02°29′18″E | 714 | 102 | Siemens SWT-7.0-154 | 2020 | 119.89 | 43 | [15][16] | ||||
European Offshore Wind Deployment Centre | Scotland | 57°13′0″N 1°59′0″W | 93 | 11 | Vestas V164-8MW | September 2018 | 32 | 3 | European Offshore Wind Deployment Centre | [w 4][17] | |||
Galloper | England | 353 | 56 | March 2018 | 27-36 | 27 | RWE | [18] | |||||
Greater Gabbard | England | 51°56′0″N 1°53′0″E | 504 | 140 | Siemens SWT-3.6–107 | September 2012 | £1,500m | 42.2%[4] | 20–32 | 23 | SSE Renewables | [w 5] | |
Gunfleet Sands 1 & 2 | England | 51°43′0″N 01°12′50″E | 172 | 48 | Siemens SWP-3.6–107 | April 2010 | £300m | 36.6% | 2–15 | 7 | Ørsted | [w 6][19] | |
Gunfleet Sands 3 – Demonstration Project | England | 51°43′0″N 01°12′50″E | 12 | 2 | Siemens SWT-6.0 120 | April 2013 | £51m | 31.1% | 5–12 | 8 | Ørsted | [w 7] | |
Gwynt y Môr | Wales | 53°27′00″N 03°35′00″W | 576 | 160 | Siemens SWT-3.6 107 | June 2015 | >£2,000m | 31.7% | 20 | 17 | RWE Npower, Stadtwerke München, GIB, Siemens | [w 8] | |
Hornsea One | England | 53°53′06″N 01°47′28″E | 1218 | 174 | Siemens SWT-7.0-154 | 2020 | 140 | £ | Ørsted, Global Infrastructure Partners | [20][21] | |||
Hornsea Two | England | 53°53′06″N 01°47′28″E | 1386 | 165 | Siemens 8MW SG 8.0-167 DD | August 2022 [22] | 57.50 | 25-30 | 120 | Ørsted, Global Infrastructure Partners | [23][24][25] | ||
Humber Gateway | England | 53°38′38″N 0°17′35″E | 219 | 73 | Vestas V112 3.0MW | June 2015 | £736m | 41.1% | 15 | 10 | E.ON | [w 9] | |
Hywind Scotland | Scotland | 57°29′0″N 1°21′0″W | 30 | 5 | Siemens SWT-6.0-154 6MW | October 2017 | NOK2 billion (£152m) | 54% | 95–120 | 25 | Equinor, Masdar | ||
Kentish Flats | England | 51°27′36″N 01°05′24″E | 140 | 30 | 30x Vestas V90-3.0MW 15× Vestas V112-3.3MW |
October 2005 | £121.5m | 31.3%, 42.9%[4] | 3–5 | 10 | Vattenfall | [w 10][26] | |
Lincs | England | 53°11′0″N 0°29′0″E | 270 | 75 | Siemens SWT-3.6–120 | September 2013 | £1,000m | 42% | 10–15 | 8 | Centrica, Siemens, Ørsted | [w 11][27] | |
London Array | England | 51°38′38″N 1°33′13″E | 630 | 175 | Siemens SWT-3.6 | April 2013 | £1,800m | 41.1%[4] | 0–25 | 20 | Ørsted, E.ON UK Renewables, Masdar | [w 12] | |
Lynn and Inner Dowsing | England | 53°07′39″N 0°26′10″E | 194 | 54 | Siemens SWP-3.6–107 | March 2009 | £300m | 34.9% | 6–11 | 5 | Centrica 50% TCW 50% |
[w 13][28] | |
Methil | Scotland | 56°09′46″N 03°00′32″W | 7 | 1 | Samsung 7 MW | October 2013 | 5 | 0.05 | Samsung, 2-B Energy | [w 14] | |||
Moray East | Scotland | 58.1°N 2.8°W | 950 | 100 | Vestas v164-9.5 MW | April 2022 [29] | 57.50 | 25-30 | 120 | Ørsted, Global Infrastructure Partners | [15][30][31][25] | ||
North Hoyle | Wales | 53°26′00″N 3°24′00″W | 60 | 30 | Vestas V80-2MW | December 2003 | £80m | 31.5% | 5–12 | 7 | Greencoat UKW | [w 15][32] | |
Ormonde | England | 54°06′00″N 3°24′00″W | 150 | 30 | REpower 5MW | August 2012 | £552m | 39.5%[4] | 17–22 | 9.5 | Vattenfall | [w 16][33] | |
Race Bank | England | 53°16′30″N 0°50′30″E | 580 | 91 | Siemens SWT-6.0–154 | February 2018 | Ørsted | [34] | |||||
Rampion | England | 50°40′00″N 0°16′00″W | 400 | 116 | Vestas V112-3.45MW | April 2018 | £1,300m | 13 | E.ON | [35][36] | |||
Rhyl Flats | Wales | 53°22′00″N 3°39′00″W | 90 | 25 | Siemens SWP 3.6–107 | December 2009 | £198m | 32.9%[4] | 4–15 | 8 | Npower (UK) (RWE) | [w 17][37] | |
Robin Rigg | Scotland | 54°45′00″N 3°43′00″W | 180 | 60 | Vestas V90-3.0MW | April 2010 | £396m | 35.1%[4] | 0–12 | 11 | E.ON | [w 18][38] | |
Scroby Sands | England | 52°38′0″N 1°47′0″E | 60 | 30 | Vestas V80-2MW | March 2004 | £75.5m | 30.7%[4] | 0–8 | 2.5 | E.ON | [w 19][39] | |
Seagreen Phase 1 | Scotland | 56°35.094′N 01°45.537′W | 1400 | 100 | Vestas V164-10.0 MW | October 2023 | 41.61 | £3 billion | Up to 59 | SSE Renewables, TotalEnergies | [40][41][42][43][44] | ||
Sheringham Shoal | England | 53°07′0″N 1°08′0″E | 317 | 88 | Siemens SWT-3.6–107 | September 2012 | £1,100m | 40.7%[4] | 12–24 | 17 | Equinor 50% Statkraft 50% |
[w 20] | |
Teesside | England | 54°38′50″N 1°05′40″W | 62 | 27 | Siemens SWT-2.3 | August 2013 | £200m | 34.8% | 7–15 | 1.5 | EDF-EN | [45] | |
Thanet | England | 51°26′0″N 1°38′0″E | 300 | 100 | Vestas V90-3.0MW | September 2010 | £900m | 32.8% | 20–25 | 11 | Vattenfall | [w 21][46] | |
Triton Knoll | England | 53°30′00″N 0°48′0″E | 857 | 90 | Vestas v164-9.5 MW | March 2022[47] | 74.75 | 33 | RWE | [15][48][25] | |||
Walney | England | 54°03′00″N 3°31′00″W | 367 | 102 | Siemens SWP 3.6–107 | February 2010 | £630m | 40.5%, 43.8%[4] | 19–30 | 14 | Ørsted, SSE, OPW | [w 22][49] | |
Walney Extension | England | 54°5′17″N 3°44′17″W | 659 | 87 | 47x Siemens SWT-7.0-154, 40× MHI Vestas V164-8.25 MW | September 2018 | 150.00 | Ørsted | [50][51][52] | ||||
Westermost Rough | England | 53°48′18″N 0°8′56″E | 210 | 35 | Siemens SWT-6.0–154 | May 2015 | £370m | 42.9%[4] | 15 | 10 | Ørsted, Marubeni, GIB | [w 23][53] | |
West of Duddon Sands | England | 53°59′00″N 3°28′00″W | 389 | 108 | Siemens SWP 3.6–120 | October 2014 | £1,600m | 44.2%[4] | 17–24 | 15 | Ørsted, Scottish Power | [w 24][54] | |
|
Map of the UK offshore wind farms
Wind farms under construction
Offshore wind farms currently under construction (offshore), with a combined capacity in October 2023 of 3,967 MW. Strike price based on £/MWh at 2012 prices.
Name | Country | Location | Cap. (MW) |
No. | Model | Project commissioning | Strike Price | Depth range (m) |
km to shore |
Owner | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|
Neart Na Gaoithe | Scotland | 56°16′4″N 2°19′15″W | 450 | 54 | Siemens 8MW SG 8.0-167 DD | 2024 | 114.39 | 20 | EDF R / ESB | [55][16] | |
Sofia Offshore Wind Farm | England | 55.0°N 1.93°E | 1400 | 100 | Siemens 14MW SG 14-222 DD | 2026 | 39.65 | 195 | RWE | [56][57][58][59][60] | |
Doggerbank A | England | 54.77°N 1.917°E | 1235 | 95 | GE-Haliade X 13MW | 2023 | 39.65 | SSE Renewables, Equinor | [56][61][62][63][64] | ||
Moray West | Scotland | 58.1°N 3.1°W | 882 | 60 | 2025 | 37.35
(294MW contracted under CFD) |
Ocean Wind | [65][66][67][68][69][70][71][72] | |||
Pre-construction wind farms
Wind farms that have started onshore construction and have been awarded contracts under the UK Government's Contracts for Difference Round 3 (2019)/Round 4 (2022). Total capacity of 6,677 MW. Strike price based on £/MWh at 2012 prices.
Name | Country | Location | Cap. (MW) |
No | Model | Project commissioning |
Strike price | Depth range (m) |
km to shore |
Owner | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|
Doggerbank B | England | 1235 | 95 | GE-Haliade X 13MW | 2Q2024 | 41.61 | SSE Renewables, Equinor | [56][62][63][64] | |||
Doggerbank C | England | 1218 | 87 | GE-Haliade X 14MW | 2Q2025 | 41.61 | SSE Renewables, Equinor | [56][73][63][64] | |||
East Anglia Three | England | 1372 | 95 | Siemens Gamesa SG 14-236 DD | 2026 | 37.35 | Iberdrola | [74][75][76][77] | |||
Hornsea Three | Hornsea Three | 2852 | 2027 | 37.35 | 121 | Ørsted | [78][79][80] |
Proposed wind farms - Contracts for Difference Round 3
This wind farm was proposed under the UK Government's Contracts for Difference Round 3 (2019),[56] with a capacity of 12 MW. Strike price based on £/MWh at 2012 prices.
Name | Country | Location | Cap. (MW) |
No | Model | Project commissioning |
Strike price | Depth range (m) |
km to shore |
Owner | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|
Forthwind | Scotland | 12 | 2023/24 | 39.650 | Forthwind Limited | [56] |
Proposed wind farms - Contracts for Difference Round 4
Wind farms proposed under the Round 4 (2022) CFD auction,[81] with a combined capacity of 2,508 MW . Strike price based on £/MWh at 2012 prices.
Name | Country | Location | Cap. (MW) |
No | Model | Project commissioning |
Strike price | Depth range (m) |
km to shore |
Owner | Notes | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|---|
TwinHub Floating Offshore Wind Project | England | 32 | 87.30 | Wave Hub Limited | ||||||||
Inch Cape Phase 1 | Scotland | 15 kilometres off the Angus coast, East Scotland | 1080 | 72 | Vestas V236-15.0 MW | 37.35 | Inch Cape Offshore Limited | [82] | ||||
Norfolk Boreas, Phase 1 | England | 53°00′00″N 2°56′00″E | 1396 | 2027 | 37.35 | 72 | Vattenfall | Development of the project has been halted by the owner. | [83][84][85] |
Proposed wind farms - early planning
Wind farms that are in an exploratory phase and have not yet secured a Contract for Difference at auction.
Total capacities: England: 15,823 MW - Wales: 700 MW - Scotland: 30,326 MW
Name | Country | Location | Cap. (MW) |
No | Model/
capacity |
Technology | Project commissioning |
Option Price | Depth range (m) |
km to shore |
Owner | Notes | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
East Anglia One North | England | 800 | Fixed | 2026 | 69 | Iberdrola | [74] | ||||||
East Anglia Two | England | 900 | Fixed | 2026 | Iberdrola | [74] | |||||||
Rampion 2 Extension | England | 50°40′00″N 0°16′00″W | 1200 | 90 | Fixed | 2030 | E.ON | Pre-examination stage with planning inspectorate - Oct 2023[86] | [87] | ||||
Norfolk Vanguard | England | 52°52′00″N 2°45′00″E | 1800 | Fixed | 47 | Vattenfall | [88] | ||||||
Dogger Bank D | England | 1320 | Fixed | SSE Renewables, Equinor | Signed lease with Crown Estate - Jan 2023 | [89][90] | |||||||
Dogger Bank South | England | 3000 | Fixed | £248m | RWE | Signed lease with Crown Estate - Jan 2023 | [91][90][92] | ||||||
Berwick Bank | Scotland | Outer Firth of Forth | 4100 | Fixed | 2030 | SSE Renewables | [93] | ||||||
Seagreen Phase 1A | England | 500 | Fixed | SSE Renewables, TotalEnergies | [94] | ||||||||
Outer Dowsing | England | Off the Lincolnshire Coast, East of the Humber Estuary | 1500 | Fixed | 2030 | £125m | 54 | Corio Generation, TotalEnergies | Aug 2022 - scoping report sent to the Planning Inspectorate.
Signed lease with Crown Estate - Jan 2023 |
[95][96][97][90][92] | |||
Mona | England | Off the Northern Welsh Coast, North East of Anglesey | 1500 | Fixed | £231m | 35 | 30 | EnBW, BP | Signed lease with Crown Estate - Jan 2023 | [95][98][90][92] | |||
Morecambe | England | Off the Lancashire Coast, West of Blackpool and South West of Morecambe Bay | 480 | 20 - 40 | Fixed | 2028 | £45m | 30 | Offshore Wind Limited | Signed lease with Crown Estate - Jan 2023 | [95][99][100][90][92] | ||
Morgan | England | Off the coast of Barrow-In-Furness, West of Morecambe Bay | 1500 | Fixed | £231m | 35 | 30 | EnBW, BP | Signed lease with Crown Estate - Jan 2023 | [95][98][90][92] | |||
Morven | Scotland | "Map Reference 1" | 2907 | Fixed | £85,900,000 | 65-75 | 60 | BP Alternative Energy Investments | Nov 2022 - two floating LiDARs to be deployed | [101][98][102] | |||
Ossian | Scotland | "Map Reference 2" | 2610 | Up to 270 | Floating | £85,900,000 | SSE Renewables | Potential to grow to 3.6GW. Nov 2022 - completed a geophysical and benthic survey | [101][103][104] | ||||
Bellrock | Scotland | "Map Reference 3" | 1200 | Floating | £28,000,000 | Falck Renewables | Feb 2023 - FLS200 floating LiDAR buoy to be deployed. | [101][105][106] | |||||
CampionWind | Scotland | "Map Reference 4" Off the East coast of Scotland | 2000 | Floating | £86,000,000 | Averaging 77 | 100 | ScottishPower,Shell | [101][107] | ||||
Muir Mhòr | Scotland | "Map Reference 5" | 798 | Floating | £20,000,000 | 67 | Vattenfall | Jun '23 Geophysical and environmental surveys started | [101][108][109] | ||||
Bowdun | Scotland | "Map Reference 6" - E3 leasing zone off Bowdun Head | 1008 | 50 to 60 | 18-25MW each | Fixed | Construction to commence 2029 and commissioned in 2033 | £18,700,000 | 44 | DEME | Mar '23 renamed, formerly Cluaran Deas Ear | [101][110][111] | |
Ayre | Scotland | "Map Reference 7" NE2 leasing zone, off East Mainland of Orkney | 1008 | Floating | Construction to commence 2029 and commissioned in 2033 | £20,000,000 | 33 | DEME | Mar '23 renamed, formerly Cluaran Ear-Thuath | [101][102][111] | |||
Broadshore | Scotland | "Map Reference 8" | 900 | Floating | £25,600,000 | Falck Renewables | Feb 2023 - FLS200 floating LiDAR buoy to be deployed. | [101][112][106] | |||||
Caledonia | Scotland | "Map Reference 9" - adjacent to Moray East and Moray West OWFs. | 2000 | Fixed | 2030 | £42,900,000 | Ocean Winds (joint venture between ENGIE & EDP Renewables) | May 2023 - LiDAR devices to be deployed. Geophysical surveys partially complete. | [101][113] | ||||
Stromar | Scotland | "Map Reference 10" | 1000 | Floating | £13,400,000 | Falck Renewables | [101][114] | ||||||
MarramWind | Scotland | "Map Reference 11" - North East coast of Scotland | 3000 | Floating | £68,400,000 | Averaging 100 | 75 | ScottishPower, Shell | [101][115] | ||||
Buchan | Scotland | "Map Reference 12" | 960 | Floating | £33,000,000 | BayWa | A floating LiDAR Buoy has been deployed - Nov 2022 | [101][116][117][118] | |||||
West of Orkney | Scotland | "Map Reference 13" | 2000 | Fixed | £65,700,000 | Offshore Wind Power | Oct 2022 - completed offshore and nearshore surveys | [101][119] | |||||
Havbredey | Scotland | Northwest of Lewis | 1500 | Floating | 2036 | £3,900,000 | 35 | Northland Power | [101][120][121] | ||||
"N3 Project" | Scotland | "Map Reference 15" | 495 | 15 | Mixed | 2030 | £10,300,000 | 106-125 | Magnora | [101][122] | |||
Spiorad na Mara | Scotland | "Map Reference 16" - West coast of Lewis | 840 | Fixed | 2031 | £16,100,000 | 5 | Northland Power | This project will be prioritized over the Havbredey project. | [101][120][121] | |||
MachairWind | Scotland | "Map Reference 17" | 2000 | Fixed | £75,400,000 | Scottish Power | [101][123] | ||||||
North Falls | England | Adjacent to Greater Gabbard wind farm | 504 | up to 72 | Fixed | SSE Renewables, RWE | [124] | ||||||
Sheringham Shoal and Dudgeon Extensions | England | Adjacent to existing Sheringham, Shoal and Dudgeon Wind Farms | 719 | up to 56 | Fixed | Equinor | [125] | ||||||
Awel y Môr | Wales | Adjacent to Gwynt y Môr wind farm | estimated 500 | up to 50 | Fixed | RWE | [126] | ||||||
Five Estuaries | England | Adjacent to Galloper Wind Farm | TBD | TBD | Fixed | RWE | [127] | ||||||
Pentland | Scotland | Off the coast of Dounreay, Caithness | 7 | Floating | 2026 | Highland Wind Limited | Offshore consent approved by Highland Council - Oct 2022 | [128][129][130] | |||||
Llŷr 1 | Wales | Off the coast of Pembrokeshire | 100 | Floating | 2027 | 60-70 | 40 | Floventis Energy | Benthic and geophysical surveys completed | [131] | |||
Llŷr 2 | Wales | Off the coast of Pembrokeshire | 100 | Floating | 2027 | 60-70 | 40 | Floventis Energy | Benthic and geophysical surveys completed | [131] | |||
Whitecross | England | Off the Devon/Cornwall coast | 100 | up to 8 | Floating | 2027 | 50 | Offshore Wind Ltd | [132][133] |
Decommissioned offshore wind farms
In October 2022, there was one offshore wind farm that had been decommissioned, consisting of 2 turbines with a combined capacity of 4MW.
Name | Country | Location | Cap. (MW) |
No. | Model | Project decommissioning |
Strike Price | Build cost |
Cap. fac. |
Depth range (m) |
km to shore |
Owner | Refs. |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Blyth Offshore | England | 55°08′09″N 01°29′25″W | 4 | 2 | Vestas V66-2MW | 2019 March | £4m | 6–11 | 1.6 | E.ON | [134] |
See also
Notes
- The Windpower database
- Interactive Map of Renewable and Alternative Energy Projects in the UK
- OffshoreDevelopment Rounds Archived 2014-02-01 at the Wayback Machine, RenewableUK
- "UK offshore wind capacity factors". 27 January 2017. Archived from the original on 19 February 2017. Retrieved 19 February 2017.
- Barrow Offshore Wind Farm (UK) 4C . Retrieved: 9 February 2015.
- Beatrice offshore wind farm (United Kingdom) 4C . Retrieved: 27 October 2010.
- Beatrice extension Retrieved: 27 October 2010.
- Royal Opening for Scotland's Largest Offshore Wind Farm Retrieved: 17 August 2019.
- CFD Register. "CFD Register".
- "EDF Renewables Announces Blyth Floating Offshore Wind Scheme". Port of Blyth | Leading UK Offshore Energy Support Base. 2021-01-28. Retrieved 2021-04-06.
- "Blyth Offshore wind farm project hits new milestone". EDF. Retrieved 2021-04-06.
- Burbo Bank Offshore Wind Farm (United Kingdom) 4C . Retrieved: 7 November 2010.
- Dudgeon Wind Farm project page
- Dudgeon 4C .
- Crown Estate - Offshore Wind Operational Report Retrieved: 17 August 2019.
- "Contracts for Difference (CFD) Allocation Round One Outcome". GOV.UK. Retrieved 2022-10-31.
- "Aberdeen offshore wind project opposed by Trump officially opening". BBC News. NE Scotland, Orkney & Shetland. 7 September 2018. Retrieved 9 September 2018.
- "About Galloper | Galloper Wind Farm". Retrieved 2022-11-07.
- Gunfleet Sands offshore wind farm (United Kingdom) 4C . Retrieved: 27 October 2010.
- "Hornsea Offshore Wind Farm Phase 1 | Low Carbon Contracts Company". www.lowcarboncontracts.uk. Retrieved 2022-10-31.
- "Hornsea Project One, North Sea". Power Technology. Retrieved 2023-05-16.
- "Hornsea Project Two Offshore Wind Farm - Fully Commissioned - United Kingdom | 4C Offshore". www.4coffshore.com. Retrieved 2022-10-13.
- Hornsea Two Offshore Wind Farm Retrieved: 17 Aug 2019.
- "About the project". hornseaprojects.co.uk. Retrieved 2022-02-01.
- "Contracts for Difference (CFD) Second Allocation Round Results". GOV.UK. Retrieved 2022-10-31.
- Kentish Flats offshore wind farm (United Kingdom) 4C . Retrieved: 27 October 2010.
- Lincs Offshore Wind Farm (United Kingdom) 4C . Retrieved: January 2015.
- Lynn Inner Dowsing offshore wind farm (United Kingdom) 4C . Retrieved: 25 October 2010.
- "Moray East Offshore Wind Farm - Fully Commissioned - United Kingdom | 4C Offshore". www.4coffshore.com. Retrieved 2022-10-13.
- "Moray East Windfarm announces £2.6bn project investment amid clutch of deals". Energy Voice. 17 December 2018. Retrieved 14 June 2021.
- 4C Offshore - Moray East
- North Hoyle Offshore Wind Farm (United Kingdom) 4C . Retrieved: 7 November 2010.
- Ormonde (UK) offshore wind farm 4C . Retrieved: 9 February 2015.
- Race Bank Wind Farm project page Archived 2016-01-16 at the Wayback Machine
- Rampion Wind Farm project page
- Rampion 4C .
- Rhyl Flats Offshore Wind Farm (United Kingdom) 4C . Retrieved: 7 November 2010.
- Robin Rigg Offshore Wind Farm (United Kingdom) 4C . Retrieved: 7 November 2010.
- Scroby Sands offshore wind farm (United Kingdom) 4C . Retrieved: 27 October 2010.
- "Vestas Prepping Seagreen Wind Turbines for Installation". offshoreWIND.biz. Retrieved 5 November 2021.
- "Building Scotland's largest offshore wind farm". Seagreen Wind Energy. Retrieved 5 November 2021.
- "Contracts for Difference (CfD) Allocation Round 3: results". GOV.UK. Retrieved 2022-10-31.
- "TotalEnergies Commissions Its Largest Wind Farm with Partner SSE Renewables | Hart Energy". www.hartenergy.com. 2023-11-15. Retrieved 2023-10-23.
- Lewis, Michelle (2022-08-23). "The world's deepest fixed-bottom offshore wind farm produces first power". Electrek. Retrieved 2023-10-23.
- Teesside offshore wind farm (United Kingdom) 4C . Retrieved: 11 February 2015.
- Thanet Offshore Wind Farm (United Kingdom) 4C . Retrieved: 24 September 2010.
- "Triton Knoll Offshore Wind Farm - Partial Generation/Under Construction - United Kingdom | 4C Offshore". www.4coffshore.com. Retrieved 2022-10-13.
- "Latest News". RWE Triton Knoll. Retrieved 9 Feb 2021.
- Walney 1, Walney 2 4C . Retrieved: 9 February 2015.
- CFD Register. "Walney Wind Farm Extension - CFD Register".
- Walney Extension Wind Farm project page
- Walney Extension 4C .
- "GIB, Marubeni rejig Rough cash". RENews. 11 August 2011.
- West of Duddon Sands (UK) offshore wind farm 4C . Retrieved: 9 February 2015.
- EDF Renewables. "About Neart Na Gaoithe". nngoffshorewind.com. Retrieved 9 February 2021.
- "Contracts for Difference (CfD) Allocation Round 3: results". GOV.UK. Retrieved 2019-09-23.
- "The Story So Far". Sofia Offshore Wind Farm. Retrieved 9 February 2021.
- "RWE begins construction of Sofia offshore wind farm". www.windtech-international.com. 11 June 2021. Archived from the original on 11 June 2021.
- "Components". Sofia Offshore Wind Farm. Retrieved 2022-02-01.
- Buljan, Adrijana (2023-05-09). "SMC Wins Work on Sofia Offshore Wind Farm". Offshore Wind. Retrieved 2023-05-09.
- "Building the world's largest offshore wind farm". Dogger Bank Wind Farm. Retrieved 9 February 2021.
- "Dogger Bank wind farm places record-breaking turbine order boosting local jobs - equinor.com". www.equinor.com. Retrieved 2022-10-27.
- "Dogger Bank Offshore Wind Farm". aibel.com. Retrieved 2023-02-26.
- "GE Renewable Energy finalizes contracts for third phase of Dogger Bank offshore wind farm | GE News". www.ge.com. Retrieved 2023-02-26.
- "Moray West Offshore Wind Farm Project". Morray West. Retrieved 19 Oct 2021.
- "8 Offshore UK Wind Projects". Air Swift. Retrieved 19 Oct 2021.
- "Moray West Offshore Wind Farm Project". www.moraywest.com. Retrieved 2022-10-27.
- "You searched for moray west foundation". Offshore Wind. Retrieved 2023-01-20.
- Skopljak, Nadja (2023-05-02). "Nexans Secures Loan Guarantees for Moray West Cable Contract". Offshore Wind. Retrieved 2023-05-02.
- "Moray West Offshore Wind Farm, Scotland". Power Technology. Retrieved 2023-05-16.
- "Moray West Onshore Works". www.moraywest.com. Retrieved 2023-07-05.
- renews.bix (3 October 2023). "Installation works kick off at Moray West".
- "Dogger Bank C Offshore Wind Farm, North Sea, UK". Power Technology. Retrieved 2022-10-27.
- "East Anglia Hub Offshore Wind Complex". Iberdrola. Retrieved 19 Oct 2021.
- "East Anglia Three Offshore Wind Farm, UK". Power Technology. Retrieved 2023-02-07.
- Buljan, Adrijana (2023-03-29). "Siemens Gamesa's Flagship Turbine for World's Second-Largest Offshore Wind Farm". Offshore Wind. Retrieved 2023-03-29.
- Durakovic, Adnan (2023-05-18). "Iberdrola Orders East Anglia Three Transition Pieces at Windar Renovables". Offshore Wind. Retrieved 2023-05-18.
- Hornsea Three
- Buljan, Adrijana (2023-04-24). "Aibel Starts Building Hornsea Three Offshore Substations". Offshore Wind. Retrieved 2023-04-25.
- "Details revealed of when work for major Norfolk wind farms will start". Eastern Daily Press. 2023-04-26. Retrieved 2023-10-13.
- "Contracts for Difference Round 4". UK Government : Contracts for Difference Round 4.
- Memija, Adnan (2022-09-28). "Inch Cape Opts for Vestas 15 MW Offshore Wind Turbines". Offshore Wind. Retrieved 2023-03-28.
- Norfolk Boreas
- Memija, Adnan (2023-04-26). "Vattenfall Taps Hellenic Cables for 4.2 GW Norfolk Offshore Wind Zone". Offshore Wind. Retrieved 2023-04-26.
- Durakovic, Adnan (2023-07-20). "BREAKING: Vattenfall Stops Developing Major Wind Farm Offshore UK, Will Review Entire 4.2 GW Zone". Offshore Wind. Retrieved 2023-07-22.
- "Rampion 2 Offshore Wind Farm - Project Information". national-infrastructure-consenting.planninginspectorate.gov.uk. Retrieved 2023-10-18.
- West Sussex County Council Rampion Wind Farm Extension project page
- Norfolk Vanguard
- Buljan, Adrijana (2022-10-06). "BREAKING: SSE, Equinor Plan 1.3 GW Dogger Bank D Offshore Wind Project". Offshore Wind. Retrieved 2022-10-14.
- "2023 - The Crown Estate seals landmark agreements for offshore wind energy to power 7 million homes | 2023 - The Crown Estate seals landmark agreements for offshore wind energy to power 7 million homes". www.thecrownestate.co.uk. Retrieved 2023-01-20.
- RWE. "Green light for Dogger Bank South projects, as RWE prepares for lease agreements". www.rwe.com. Retrieved 2022-10-14.
- Buljan, Adrijana (2023-06-29). "Crown Estate Reports Record Profit as UK Round 4 Offshore Wind Option Fees Start Pouring In". Offshore Wind. Retrieved 2023-06-29.
- "General 1". Berwick Bank. Retrieved 2022-11-01.
- Buljan, Adrijana (2022-10-12). "Half of Seagreen Offshore Wind Turbines Installed". Offshore Wind. Retrieved 2022-10-14.
- "2022 - Government approves 8GW of offshore wind in major milestone for renewable energy | 2022 - Government approves 8GW of offshore wind in major milestone for renewable energy". www.thecrownestate.co.uk. Retrieved 2022-10-14.
- "About | Outer Dowsing". www.outerdowsing.com. Retrieved 2022-11-01.
- Memija, Adnan (2022-08-03). "Corio, Total Submit Scoping Report for 1.5 GW Outer Dowsing Offshore Wind Project". Offshore Wind. Retrieved 2022-11-01.
- "The wind farms - EnBW bp". www.enbw-bp.com. Retrieved 2022-11-01.
- "UK | Morecambe". Flotation Energy. Retrieved 2022-11-01.
- "Morecambe Offshore Wind - The future of renewable energy". Morecambe Offshore Wind. Retrieved 2022-11-01.
- "ScotWind offshore wind leasing delivers major boost to Scotland's net zero aspirations - News - Crown Estate Scotland". www.crownestatescotland.com. Retrieved 2022-10-14.
- Buljan, Adrijana (2022-09-01). "EnBW, BP to Deploy Two Floating LiDARs at Scottish Offshore Wind Farm Site". Offshore Wind. Retrieved 2022-11-01.
- "Increase in overall potential project capacity identified for Ossian Wind Farm". www.sserenewables.com. Retrieved 2022-11-05.
- Buljan, Adrijana (2023-03-17). "SSE, Marubeni & CIP's Floating Wind Farm in Scotland Could Have 270 Turbines and 6 Offshore Substations". Offshore Wind. Retrieved 2023-03-17.
- "Bellrock | BlueFloat Energy". 2022-03-30. Retrieved 2022-11-01.
- Buljan, Adrijana (2023-02-15). "Wind Measurement Campaign to Start at Falck and BlueFloat's Floating Wind Sites in Scotland". Offshore Wind. Retrieved 2023-02-15.
- "CampionWind - Working together for a cleaner energy future". CampionWind. Retrieved 2022-11-01.
- "Vattenfall and Fred. Olsen Seawind partnership allocated an east coast floating offshore wind site in ScotWind". Vattenfall. Retrieved 2022-11-01.
- Memija, Adnan (2023-06-12). "Survey Starts at Fred. Olsen Seawind and Vattenfall's ScotWind Site". Offshore Wind. Retrieved 2023-06-12.
- "Thistle Wind Partners (TWP), a consortium of DEME, Qair and Aspiravi, land 2 GW in highly competitive ScotWind offshore wind leasing round | DEME Group". www.deme-group.com. Retrieved 2022-11-01.
- Memija, Adnan (2023-03-20). "Thistle Wind Partners Rename 2 GW ScotWind Offshore Wind Projects". Offshore Wind. Retrieved 2023-03-20.
- "Broadshore | BlueFloat Energy". 2022-03-30. Retrieved 2022-11-01.
- Memija, Adnan (2022-10-04). "Ocean Winds Hands In Scoping Report for 2 GW Caledonia Offshore Wind Farm". Offshore Wind. Retrieved 2022-11-01.
- "Stromar | BlueFloat Energy". 2022-03-30. Retrieved 2022-11-01.
- "MarramWind - Working together for a cleaner energy future". MarramWind. Retrieved 2022-11-01.
- Buljan, Adrijana (2022-10-31). "Metocean Measurement Campaign to Start at 1 GW Scottish Floating Wind Farm Site". Offshore Wind. Retrieved 2022-11-01.
- Memija, Adnan (2022-12-06). "Floating LiDAR Deployed at 1 GW Scottish Project Site". Offshore Wind. Retrieved 2022-12-07.
- Memija, Adnan (2023-05-16). "Survey Activities Ramping Up on Caledonia Offshore Wind Farm Site". Offshore Wind. Retrieved 2023-05-16.
- Memija, Adnan (2022-10-31). "Offshore and Nearshore Survey Work Complete for 2 GW Scottish Wind Project". Offshore Wind. Retrieved 2022-11-01.
- "Scotwind - Scottish Offshore Wind". www.northlandpower.com. 2022-05-12. Retrieved 2022-11-01.
- Memija, Adnan (2023-03-23). "Northland Power Names Wind Projects Offshore Scotland". Offshore Wind. Retrieved 2023-03-23.
- "Scotwind – Magnora Offshore Wind". Retrieved 2022-11-01.
- "MachairWind". ScottishPower Renewables. Retrieved 2022-11-01.
- "Facts & Figures". North Falls Offshore Wind Farm. Retrieved 2022-10-19.
- "Sheringham Shoal Offshore Wind Farm Extension | Public Consultation Documents". sheringhamshoal.co.uk. Retrieved 2022-10-19.
- Designs, Daydream. "Awel y Môr Project Details". Awel Y Mor. Retrieved 2022-10-19.
- "About – Five Estuaries". Retrieved 2022-10-28.
- "Pentland Floating Offshore Windfarm". pentlandfloatingwind.com. Retrieved 2022-11-03.
- "Pentland Floating Offshore Windfarm". pentlandfloatingwind.com. Retrieved 2022-11-03.
- Memija, Adnan (2022-12-07). "Scots Approve Pentland Offshore Planning Application". Offshore Wind. Retrieved 2022-12-07.
- Memija, Adnan (2023-03-01). "Surveys Completed for Celtic Sea Floating Offshore Wind Projects". Offshore Wind. Retrieved 2023-03-02.
- Buljan, Adrijana (2021-07-27). "Three Projects Selected in UK Floating Wind Leasing Round". Offshore Wind. Retrieved 2023-03-02.
- "White Cross Offshore Wind - The future of renewable energy". White Cross Offshore Wind. Retrieved 2023-03-02.
- "Blyth Offshore Wind Farm Decommissioning". Natural Power. Retrieved 2022-11-07.
External links
- 4C Offshore's Global Offshore Wind Farm Map and Database
- List of United Kingdom Wind Farms, thewindpower.net
Wind farms
- Barrow Offshore Wind Farm
- "Beatrice". Archived from the original on 2016-06-29. Retrieved 2015-02-12.
- Burbo Bank
- "EOWDC website". Archived from the original on 2018-06-12. Retrieved 2018-09-09.
- "SSE wind farm Project Website". Archived from the original on 2015-01-12. Retrieved 2015-02-12.
- Gunfleet Sands
- Gunfleet Sands demonstration project Archived 2015-02-03 at the Wayback Machine
- Gwynt y Môr
- Humber Gateway
- Kentish Flats
- Lincs Archived 2015-02-13 at the Wayback Machine
- London Array
- Lynn and Inner Dowsing Archived 2015-02-12 at the Wayback Machine
- Energy Park Fife (Methil)
- North Hoyle
- Ormonde, Irish Sea
- Rhyl Flats
- Robin Rigg
- Scroby Sands
- Statkraft – Sheringham Shoal
- Thanet
- Walney Offshore Windfarm
- Westermost Rough Archived 2015-02-27 at the Wayback Machine