Newton Navarro Bridge

The Newton Navarro Bridge, is one of the biggest cable-stayed bridges in Brazil. It is located in the city of Natal, the capital of the Brazilian state of Rio Grande do Norte. It connects North Zone and the cities of the north coast to the South Zone and the other regions of the city that cross the Potengi River.

Newton Navarro Bridge
Coordinates5°45′23″S 35°12′9″W
CarriesVehicle, 4 lanes
CrossesPotengi River
LocaleNatal, Brazil
Official nameBridge of All Newton Navarro
Characteristics
DesignCable-stayed bridge
Total length1781.6 m
Width22 m
Height103.45 m
Longest span212 m
Clearance below55.1 m
History
Construction startOctober 24, 2004
Construction endNovember 17, 2007
Construction costUS$80 million[1]
OpenedNovember 21, 2007
Statistics
Daily traffic25,000
Location

The main purpose is to ease the usual heavy traffic on Igapó Bridge and to improve access to the future Greater Natal International Airport and its adjacent areas. It also increases the flow of tourism on the north coast and improves access to the inhabitants of the North Zone to the downtown and the main zones.

It is named upon Newton Navarro, an important local artist.

Also referred to as the Forte-Redinha Bridge, The main cable-stayed bridge is a prestressed concrete structure with a double plane of stay cables and conceived as an integral framed structure between the expansion joints. Piers, towers, deck main girders and stay cables lay in two parallel planes. Piers and towers are box concrete sections; main girders of deck are solid section. All construction is concreted in situ.

The approach viaducts have double columns piers while the deck is made of parallel simply supported precast girders with 40-meter spans.[2]

Region Daily Traffic

The assistant secretary for Transport in Natal, Walter Pedro, explains that the construction of a new bridge over the Potengi is under study, connecting Baldo in the East zone to Av. Itapetinga in the North zone. Currently, on weekdays, the flow on the Igapó Bridge exceeds 70,000 vehicles, while the Newton Navarro Bridge receives an average of 39,000/day. Walter Pedro assesses the situation in Igapó as saturated, and adds that in another decade Newton Navarro will reach the limit of 60 thousand vehicles per day.[3]

References

  1. Vanessa Barchfield (20 July 2006), Rio Grande do Norte's US$80mn Newton Navarro bridge 70% complete, BN Americas, retrieved 11 August 2014
  2. "Newton Navarro Bridge (Natal, 2007)". Structurae. Retrieved 2021-12-16.
  3. "Soluções passam por transporte público - 06/01/2018 - Notícia - Tribuna do Norte". www.tribunadonorte.com.br (in Brazilian Portuguese). Retrieved 2021-12-16.

https://structurae.net/en/structures/newton-navarro-bridge


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.