Ontario Highway 2A

King's Highway 2A, commonly referred to as Highway 2A, was the designation of five separate provincially maintained highways in the Canadian province of Ontario. Highway 2A was an alternate route to Highway 2 in Chatham, London and Cornwall; these routes were all eventually redesignated. Highway 2A was also a highway that extended from Windsor to Tilbury, which was redesignated as Highway 98 in 1938.

Highway 2A marker

Highway 2A

(Toronto section)
Route information
Maintained by City of Toronto
(Toronto Transportation)
Length3.4 km[1] (2.1 mi)
Major junctions
West endHighland Creek overpass
(continues as Kingston Road)
Major intersectionsLawson Road
Kingston Road
Port Union Road
East end Highway 401Kingston
Location
CountryCanada
ProvinceOntario
Highway system
Highway 2 Highway 3
Former provincial highways
Highway 2S  

The final and most familiar section of highway to be designated Highway 2A was the bypass of Highway 2 between Toronto and Newcastle, most of which became part of Highway 401 in July 1952. The short stub of dual carriageway feeding into a new alignment of Kingston Road with Highway 401 was renumbered 2A in 1956 with the completion of the Toronto Bypass. Despite losing its provincial highway status in 1998, Highway 2A was never renamed and is now part of Toronto's municipal expressway system. The speed limit is 80 kilometres per hour (50 mph), and it is patrolled by the Toronto Police Service.

Windsor–Tilbury

Highway 2A marker

Highway 2A

LocationTecumseh Road – Mill Street
Length54.7 km[2] (34.0 mi)
Existed1927–1938
Renumbered as Highway 98

The Windsor to Tilbury section of Highway 2A originally was designated in 1929 along the route of what would become Highway 114, near Maidstone. When Highway 18 was redesignated between Windsor and Leamington in 1931, Highway 2 was rerouted onto its former routing. The old routing of Highway 2 prior to that became Highway 2A, and the existing Highway 2A was renumbered as Highway 3B.

Between 1931 and 1938, the route followed the Provincial Highway between Tecumseh Road in downtown Windsor, and Mill Street in Tilbury, both at junctions with Highway 2. In 1938, the entire route was renumbered as Highway 98

Chatham

Highway 2A marker

Highway 2A

LocationRichmond Street/Keil Drive South – Grand Avenue East/Thames Street
Length3.5 km[3] (2.2 mi)
Existed1957–1961
(renumbered as Highway 2B 1961-1970)

Highway 2A in Chatham was established in 1957 along the original route of Highway 2 when it was rerouted along the West Chatham Bypass (Keil Street) and Grand Avenue. The route began at Highway 2 at the intersection of Richmond Street and Keil Street, following the former into downtown Chatham, where it turned north onto Queen Street then east onto School Street. From there, the route turned north onto Centre Street, which becomes 5th Street shortly thereafter. The route crossed the Thames River, north of which it became Thames Street and continued to Highway 2 (Grand Avenue East). The route was renumbered as Highway 2B in 1961 and decommissioned by 1970.

Cornwall

Highway 2A marker

Highway 2A

LocationVincent Massey Drive/Power Dam Drive – Brookdale Avenue/Second Street
Length5.2 km[4] (3.2 mi)
Existed1965–1967

Highway 2A (Alt.) in Cornwall was a short-lived designation applied along Nine Mile Road (now Power Dam Drive) and Second Street on the west side of the city. It provided an alternate bypass to the Seaway International Bridge. The route was established in 1965 and remained in place for only two years before being decommissioned in 1967.

London

Highway 2A marker

Highway 2A

Location Highway 4 (Wharncliffe Road South)/Stanley Street – Dundas Street/Highbury Avenue
Length5.5 km[5] (3.4 mi)
Existed1956–1968

Highway 2A in London provided an alternative parallel route to Highway 2 through the downtown core, travelling from a concurrent Highway 2 and Highway 4 eastward along Stanley Street, York Street, Florence Street and finally Highbury Avenue. At its eastern end, it met Highway 2 (Dundas Street). The route was established in 1956 and decommissioned in 1968.

Toronto–Newcastle

The Toronto section of Highway 2A is the only one of the five iterations that is still evident and in use today. Although it is no longer provincially maintained, it is still referenced by its highway designation on signage.

As automobile use in southern Ontario grew in the early twentieth century, road design and construction advanced significantly. Following frequent erosion of the former macadamized Lake Shore Road,[6] a cement road known as the Toronto–Hamilton Highway was proposed in January 1914.[7] By November 1914, the proposal was approved,[8] and work began quickly to construct the road from Toronto to Hamilton known today as Lake Shore Boulevard and Lakeshore Road. The road was formally opened on November 24, 1917,[6] 18 feet (5.5 m) wide and nearly 40 mi (64 km) long. It was the first concrete road in Ontario, as well as one of the longest stretches of concrete road between two cities in the world.[9]

Over the next decade, vehicle usage increased substantially, and by 1920 Lakeshore Road was again highly congested on weekends.[10] In response, the Department of Highways examined improving another road between Toronto and Hamilton. Middle Road, a continuation of Queen Street west of the Humber River, was chosen to avoid delays on Dundas or Lakeshore. The road was to be more than twice the width of Lakeshore Road at 40 ft (12 m), and would carry two lanes of traffic in either direction.[11] Construction on what was then known as the Queen Street Extension (not to be confused with The Queensway) between Highway 10 and Highway 27 began in early 1931,[12] and between Highway 27 and the Humber River on November 1, 1931.[13]

A highway passes beneath the camera and continues straight into the horizon. It is surrounded by forests on either side and contains no guardrail to separate opposite flows of traffic.
Aside from a resurfaced pavement and guardrails, Highway 2A has not been altered since it opened in 1947.

Before the highway could be completed, Thomas McQuesten was appointed the new minister of the Department of Highways, with Robert Melville Smith as deputy minister, following the 1934 provincial elections.[14] Smith, inspired by the German Autobahn's—new "dual-lane divided highways"—modified the design for Ontario roads,[15] and McQuesten ordered that the Middle Road be converted into this new form of highway.[16][17][18] A 132 ft (40 m) right-of-way was purchased along the Middle Road and construction began to convert the existing sections to a divided highway, as well as on Canada's first interchange at Highway 10.[11]

Beginning in 1935, McQuesten applied the concept of a dual-highway to several projects along Highway 2, including a section between Birchmount Road (then the eastern limit of urban development along Kingston Road) and east of Morningside Avenue in what was then known as Scarborough Township.[19] When widening in Scarborough reached the Highland Creek ravine in 1936, east of Morningside, the Department of Highways began construction on a new bridge over the large valley, bypassing the former alignment around the village of West Hill.[20] From there to Oshawa, the highway was constructed along a new alignment, avoiding construction on the congested Highway 2.[21] As grading and bridge construction neared completion between Highland Creek and Ritson Road in September 1939, World War II broke out and gradually money was siphoned from highway construction to the war effort.[14]

They are designed for sustained speed, with the best alignments, fewest curves and least grades possible and by-passing centres of population. We need this new version of highway, as a major arterial road for a major congested metropolitan area.

Thomas McQueston[22]

Following the war, construction resumed on roadways throughout Ontario. The expressway between Highland Creek and Oshawa was completed in December 1947.[21] The Toronto–Barrie Highway was the primary focus of the Department of Highways at the time, and the onset of the Korean War in 1949 continued to stall construction. Despite the delays, highway minister George Doucette officially announced the plans for construction of the new trans-provincial expressway in 1950, with the Toronto to Oshawa expressway serving as a model for the design.[14]

Along with an extension of the Highway between Oshawa and Highway 35 and Highway 115, most of Highway 2A was redesignated Highway 401 in July 1952.[21] A short stub between West Hill and the planned Toronto Bypass retained the Highway 2A designation until April 1, 1997, when it was transferred to the City of Toronto as part of a provincial downloading of highways to municipalities.[23] Despite this, the highway has retained its name.[24] The off ramp from westbound 401 lists Kingston Road with a number 2 regional road marker, despite the fact the road does not have any numerical designation within Toronto.[25]

Exit list

The following table lists the major junctions along Highway 2A.[1] The entire route is located in Toronto. 

km[1]miDestinationsNotes
0.00.0Highland Creek OverpassParclo A2 connecting to Kingston Road and Lawson Road
Additional RIRO lane on westbound side between the Parclo to the east and Highland Creek to the west, separated from main highway by a concrete median strip. The lane has an entrance from Kingston Road westbound, and both entrances from and exits to Military Trail and Morrish Road
Kingston RoadWestbound entrance; access from eastbound 401 via Exit 390
Port Union RoadModified Parclo A4
3.42.1 Highway 401Eastbound exit and westbound entrance; westbound exit via Port Union Road; eastbound entrance via Kingston Road (Exit 390)
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

Sources
  1. "Provincial Highways Distance Table". Provincial Highways Distance Table: King's Secondary Highways and Tertiary Roads. Ministry of Transportation of Ontario: 8. 1989. ISSN 0825-5350.
  2. Google (February 11, 2014). "Highway 2A in Chatham - length and route" (Map). Google Maps. Google. Retrieved February 11, 2014.
  3. Google (February 11, 2014). "Highway 2A in Chatham - length and route" (Map). Google Maps. Google. Retrieved February 11, 2014.
  4. Google (February 11, 2014). "Highway 2A in Cornwall - length and route" (Map). Google Maps. Google. Retrieved February 11, 2014.
  5. Google (February 11, 2014). "Highway 2A in London - length and route" (Map). Google Maps. Google. Retrieved February 11, 2014.
  6. Emery pp. 179–182
  7. "Toronto–Hamilton Highway Proposed". The Toronto World. Vol. 34, no. 12125. January 22, 1914. p. 14. Retrieved February 9, 2010.
  8. "Council Meets Today To Pass Agreement". The Toronto World. Vol. 34, no. 12402. October 26, 1914. p. 3. Retrieved February 9, 2010.
  9. Shragge p. 55 "...the Toronto-to-Hamilton highway which, when completed in 1917, was both Ontario's first concrete highway and one of the longest such inter-city stretches in the world."
  10. "Increased Volume of Traffic". County And Suburbs. Toronto World. Vol. 40, no. 14472. June 26, 1920. p. 7. Retrieved February 12, 2010.
  11. Shragge pp. 79–81
  12. Filey pp. 61–62
  13. "Tenders Called For". The Gazette. Vol. 160, no. 255. Montreal. October 16, 1931. p. 15. Retrieved February 9, 2010.
  14. Shragge, John G. (2007). "Highway 401 – The story". Archived from the original on March 28, 2008. Retrieved February 12, 2010.
  15. Stamp pp. 19–20
  16. "Hopes to Improve Roads". The Gazette. Vol. 165, no. 42. Montreal. February 18, 1936. p. 14. Retrieved February 9, 2010.
  17. English, Bob (March 16, 2006). "Remember that 'little four-lane freeway?'". Globe And Mail. Toronto. Archived from the original on September 30, 2007. Retrieved February 9, 2010. ...the freeway concept was promoted by Hamiltonian Thomas B. McQuesten, then the highway minister. The Queen Elizabeth Way was already under construction, but McQuesten changed it into a dual-lane divided highway, based on Germany's new autobahns.
  18. Stamp pp. 11–12
  19. "Highway Conditions In Eastern Ontario". The Ottawa Citizen. Vol. 94, no. 127. November 13, 1936. p. 29. Retrieved February 16, 2010.
  20. Brown p. 105
  21. Shragge pp. 93–94
  22. "Ontario To Bar All Gas Stands On Speedways". The Gazette. Vol. 167, no. 214. Montreal. September 7, 1938. pp. 1, 19. Retrieved February 12, 2010.
  23. City Clerk (July 2, 1998). Interim Third Party Advertising Sign Minor Variance Process for Areas Abutting the F.G. Gardiner Expressway (Formerly the Queen Elizabeth Way), Eglinton Avenue West, Highway 2, Highway 2A and Highway 27 (Report). City of Toronto. Retrieved September 21, 2016.
  24. MapArt 2010
  25. Google (September 2015). "View of overhead signage on westbound Highway 401 east of Port Union Road". Google Street View. Google. Retrieved September 21, 2016. {{cite web}}: |author= has generic name (help)
Bibliography
  • Brown, Ron (1997). Toronto's Lost Villages. Polar Bear Press. ISBN 1-896757-02-2.
  • Emery, Claire; Ford, Barbara (1967). From Pathway to Skyway. Confederation Centennial Committee of Burlington. pp. 179–182. Archived from the original on June 14, 2011. Retrieved May 3, 2010.
  • Filey, Mike (1994). Toronto sketches 3: the way we were. Dundurn Press. pp. 61–62. ISBN 1-55002-227-X. Retrieved February 10, 2010.
  • Shragge, John; Bagnato, Sharon (1984). From Footpaths to Freeways. Ontario Ministry of Transportation and Communications, Historical Committee. ISBN 0-7743-9388-2.
  • Stamp, Robert M. (1987). QEW – Canada's First Superhighway. The Boston Mills Press. ISBN 0-919783-84-8.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.