Pacific Harbor Line

The Pacific Harbor Line (reporting mark PHL) was formed in 1998 to take over the Harbor Belt Line (HBL). In 1998, the Alameda Corridor was nearing completion, allowing for a massive amount of railroad traffic from the largest harbors in the Western hemisphere: Port of Los Angeles and Port of Long Beach.

Pacific Harbor Line
An SD20-2 engine owned by Pacific Harbor Lines works at Long Beach, California.
Overview
Parent companyAnacostia Rail Holdings Company
HeadquartersWilmington, California
Reporting markPHL
LocalePort of Los Angeles/Port of Long Beach, California
Dates of operation1998present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Length18 mi (29 km)
Track length59 mi (95 km)
Other
Websiteanacostia.com/railroads/phl

The railroad has 18 route miles (29 km) with a web of 59 miles (95 km) of track.

Overview

The PHL was formed to create a level playing field for shippers. Up to that time, the HBL was owned and operated by the major railroads in Los Angeles; the Southern Pacific, the Santa Fe Railway and the Union Pacific. One of the problems with the HBL arrangement was that a shipper could have problems getting their goods to or from the port depending on where an individual railroad's track ended.

The PHL, privately owned by the Anacostia & Pacific Company, operates on tracks and facilities owned by the ports. The PHL is a neutral switching railroad that serves shippers at this large port complex. PHL handles 40,000 carloads of freight a year excluding intermodal traffic. The Alameda Corridor provides rail service to port complex through BNSF and UP railroads.

PHL was the first railroad to have its locomotive fleet composed only of Tier II and Tier III "clean diesel" locomotives. An EMD Joule Battery Electric Locomotive arrived in 2023 for testing and demonstration purposes for 2 years.[1]

Pacific Harbor Line was named the 2009 Short Line Railroad of the Year by Railway Age magazine.

In July 2013, Pacific Harbor Line signed a new five-year collective agreement with the Brotherhood of Locomotive Engineers and Trainmen (BLET).[2] BLET has represented workers at the company since PHL was formed in 1998.[2]

On March 31, 2020, Eduardo Moreno attempted to crash a Pacific Harbor Line train into the hospital ship USNS Mercy, which was in the Port of Los Angeles to provide Los Angeles with additional hospital capacity during the COVID-19 pandemic in California, but the train stopped approximately 250 yards (230 m) from the ship.[3]

References

  1. Lustig, David (April 21, 2023). "EMD Joule Battery Electric Locomotive arrives in Southern California". Trains. Retrieved April 24, 2023.
  2. Bowen, Douglas John (July 15, 2013). "Pacific Harbor Line, BLET sign pact". Railway Age. Retrieved July 17, 2013.
  3. "Prosecutors: Engineer deliberately ran train off tracks in attempt to smash the USNS Mercy". KABC-TV. April 2, 2020. Retrieved April 3, 2020.

Further reading

  • Fickewirth, Alvin A. (1992). California railroads: an encyclopedia of cable car, common carrier, horsecar, industrial, interurban, logging, monorail, motor road, shortlines, streetcar, switching and terminal railroads in California (1851–1992). San Marino, CA: Golden West Books. ISBN 0-87095-106-8.
  • Robertson, Donald B. (1998). Encyclopedia of Western Railroad History – Volume IV – California. Caldwell, ID: The Caxton Printers, Ltd. ISBN 0-87004-385-4.
  • Stindt, Fred A. (1996). American Shortline Railway Guide (5th ed.). Waukesha, WI: Kalmbach Publishing Co. ISBN 0-89024-290-9.
  • Walker, Mike (1997). Steam Powered Video's Comprehensive Railroad Atlas of North America – California and Nevada – Post Merger Ed. Faversham, Kent, United Kingdom: Steam Powered Publishing. ISBN 1-874745-08-0.

33°46′42″N 118°14′40″W

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.