Ranjiaba station
Ranjiaba is a station on Line 5, Line 6, and the Loop Line of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.
Ranjiaba 冉家坝 | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||
Location | Chongqing China | |||||||||||||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | |||||||||||||||||||||||||
Line(s) | Line 5 Line 6 Loop line | |||||||||||||||||||||||||
Platforms | 6 (2 island platforms and 2 side platforms) | |||||||||||||||||||||||||
Connections | Bus | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Station code | 环/11, 5/08, 6/15 | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | 20 January 2013 (Line 6) 28 December 2017 (Line 5) 28 December 2018 (Loop Line) | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
|
It opened on January 20, 2013, with Line 6. Line 5 services were later added on December 28, 2017. The station expanded exactly one year later with the opening of the Loop Line section of the station on December 28, 2018.
Station structure
A total of 2 island platforms are used for Line 5 and Line 6 trains travelling in both directions. These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.
There are 2 side platforms for Loop Line trains.
B3 Concourse |
Exits, Customer service, Vending machines |
B4 Platforms |
Line 6 to Beibei (Guangdianyuan) |
Island platform | |
Line 5 to Yuegangbeilu (Xingfu Square) | |
B5 Platforms |
Line 6 to Chayuan (Dalongshan) |
Island platform | |
Line 5 to Dashiba (Dalongshan) | |
B6 Platforms |
Side platform |
Loop line counterclockwise loop (Sports Park) | |
Loop line clockwise loop (Dongbu Park) | |
Side platform |