Tōkyū Shin-yokohama Line
The Tōkyū Shin-yokohama Line (東急新横浜線) is a commuter line operated by Tokyu Corporation connecting Hiyoshi Station on the Tōkyū Tōyoko and Meguro lines to Shin-yokohama Station on the Sōtetsu Shin-yokohama Line.[1] Tōkyū has put its company name as a formal part of the line name, which is a second for Tōkyū, following the Tōkyū Tamagawa Line.
Tōkyū Shin-yokohama Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SH | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | 東急新横浜線 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Japan Railway Construction, Transport and Technology Agency | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Yokohama, Kanagawa, Japan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 3 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Color on map | Violet (#890d84) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Tokyu Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 18 March 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 5.8 km (3.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,067 mm (3 ft 6 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead catenary 1,500 V DC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
It is a part of the Eastern Kanagawa Rail Link strategic plan for improving the rail network connectivity of Kanagawa Prefecture. The railway line's infrastructure is maintained by the Japan Railway Construction, Transport and Technology Agency (JRTT). Tōkyū collects the operation revenue and pays JRTT for using the rail infrastructures, then JRTT use this payment to maintain the infrastructures and reimburse the loan for the construction of this line.[2]
Summary
The entire line runs between Shin-yokohama and Hiyoshi. A new intermediate station, Shin-tsunashima, is situated near Tsunashima Station on the Tōkyū Tōyoko Line.
Sōtetsu Shin-yokohama Line trains run through service with Tōkyū, Tokyo Metro, and Toei Subway Lines via Shin-yokohama.
Shin-yokohama Station is jointly operated by Tōkyū and Sōtetsu. This is the first case for both operators to have a station with direct connections to the Shinkansen.
Routes and services
Beyond Hiyoshi, trains head towards Shibuya via the Tōkyū Tōyoko Line or Meguro via the Tōkyū Meguro Line.
In mid-2022 it was announced that through service trains to the Tōkyū Tōyoko Line could continue along the Tokyo Metro Fukutoshin Line to Wakōshi and further on the Tōbu Tōjō Line. However, trains would not be allowed to run through on the Seibu Yūrakuchō & Ikebukuro Lines and must transfer at Kotake-Mukaihara Station. Beyond Shin-yokohama and Nishiya, Tōyoko Line express trains will run via the Izumino Line to Shōnandai station.
It has been proposed that the Tōkyū Shin-yokohama Line operate 14 trains per hour during rush hours, with 4 heading to the Tōyoko Line, and 10 heading to the Meguro Line. Meguro-bound Shin-yokohama Line trains will operate through services not only to the Meguro Line, but also the Toei Mita Subway Line and Tokyo Metro Namboku Line, with further service onto the Saitama Rapid Railway Line. Once connected to the Sōtetsu network at Shin-yokohama, Meguro line trains will run express along the Main Line to Ebina station.
In 2016, Toei announced that thirteen of its 6300 series trainsets (1st and 2nd batch) would be replaced, and in 2019 nine new trainsets compatible with the Sōtetsu Line would begin service, with more trainsets to be produced until 2021.[5] In 2018, they ramped up their plans and announced that 13 new trainsets with the same designation numbers as the 13 that are replaced would be introduced to service.[6] These new models are formed as 8-car sets[7] made by Kinki Sharyo and classified as 6500 series.[8] The first of these sets entered service on 14 May 2022.[9] Meanwhile, the 3rd batch of 6300 series trainsets will continue their service on the Mita Line, but they will still be upgraded to enable compatibility with the Sōtetsu Line, by introducing digitized communications equipment and the ATS-P system.[10] With Mita Line trainsets extending to 8 cars, Sōtetsu is undergoing preparations to enable compatibility with 8-car trains.[11] Additionally, Sōtetsu has also introduced its 20000 series developed for use on Tōkyū through services;[12] the type first entered service in February 2018.[13]
Station numbers for the Tōkyū Shin-yokohama Line between Shin-yokohama and Hiyoshi were revealed on 16 September 2022.[14]
Through the end of 2022, various trainsets from Tōkyū, Sōtetsu, Tokyo Metro, Toei, and Tōbu conducted tests along the now completed segment of this line and the Sōtetsu Shin-yokohama Line between Hiyoshi and Hazawa Yokohama-Kokudai.
On 16 December 2022, Tōkyū, Sōtetsu, and the Japan Railway Construction, Transport and Technology Agency announced that the Tōkyū Shin-yokohama Line would open on 18 March 2023. The Sōtetsu Shin-yokohama Line section between Shin-yokohama and Hazawa Yokohama-Kokudai also began serving at the same time.[4] The Shin-yokohama Line opened as scheduled on 18 March 2023, providing through service between Shin-yokohama and Hiyoshi.[15]
Service pattern
Upon opening of the line, the typical weekday off-peak services are as follows:
- Northbound (Inbound): 6 departures/hour (Down from a peak of 15 departures/hour during rush) [16]
- 2 Express trips to Nishi-takashimadaira via the Tōkyū Meguro Line and Toei Mita Line
- 2 Express trips to Akabane-Iwabuchi via the Tōkyū Meguro Line and Tokyo Metro Namboku Line, with one continuing to Urawa-Misono via the Saitama Rapid Railway Line
- 2 Express trips to Wakoshi via the Tōkyū Tōyoko Line and Tokyo Metro Fukutoshin Line, with one continuing to Kawagoeshi via the Tobu Tojo Line
- Southbound (Outbound): 6 tph (Down from a peak of 11 tph during rush) [17]
- 2 departures/hour to Ebina via the Sōtetsu Shin-yokohama Line and Sōtetsu Main Line
- 2 departures/hour to Shōnandai via the Sōtetsu Shin-yokohama Line, Main Line, and Izumino Line
- 2 departures/hour terminating at Shin-yokohama
Station list
- All stations are located in Yokohama, Kanagawa Prefecture
Station no. | Station name | Distance | Interchange | Location | ||
---|---|---|---|---|---|---|
English | Japanese | Between stations | Total | |||
↑ Through-running to/from ↑ | ||||||
SH01 | Shin-yokohama | 新横浜 | - | - | Tōkaidō Shinkansen JH Yokohama Line (JH16) Yokohama Municipal Subway Blue Line (B25) |
Kōhoku-ku |
SH02 | Shin-tsunashima | 新綱島 | - | 3.6 | (Despite the close proximity with Tsunashima Station, the two stations are not treated as a pair of interchange stations in the ticketing system.[18]) | |
SH03 | Hiyoshi | 日吉 | 2.2 | 5.8 | MG Tōkyū Meguro Line (MG13) TY Tōkyū Tōyoko Line (for Kikuna, Yokohama and Minatomirai Line) (TY13) Yokohama Municipal Subway Green Line (G10) | |
↓ Through-running to/from ↓
TY Tōkyū Tōyoko Line, FTokyo Metro Fukutoshin Line, TJ Tobu Tojo Line to Shinrinkōen MG Tōkyū Meguro Line for Meguro, I Toei Mita Line towards Nishi-Takashimadaira / NTokyo Metro Namboku Line, SRSaitama Rapid Railway Line towards Urawa-Misono |
Rolling stock
- Tokyu 5050-4000 series 10-car trains
- Tokyu 5080 series 8-car trains
- Tokyu 3000 series 8-car trains
- Tokyu 3020 series 8-car trains
- Sotetsu 20000 series 10-car trains
- Sotetsu 21000 series 8-car trains
- Tokyo Metro 9000 series 6-car trains
- Toei 6300 series 6-car trains
- Toei 6500 series 8-car trains
- Saitama Rapid Railway 2000 series 6-car trains
- Tokyu 5050-4000 series
- Tokyu 5080 series
- Tokyu 3000 series
- Tokyu 3020 series
- Sotetsu 20000/21000 series
- Tokyo Metro 9000 series
- Toei 6300 series
- Toei 6500 series
- Saitama Rapid Railway 2000 series
References
- "相鉄新横浜線・東急新横浜線、神奈川東部方面線の路線名称が決定" [Line names for Sōtetsu Shin-yokohama Line, Tōkyū Shin-yokohama Line, and Eastern Kanagawa Rail Link decided] (in Japanese). MyNavi Corporation. 13 December 2018. Archived from the original on 8 April 2022. Retrieved 6 August 2022.
- 整備手法(都市鉄道等利便増進法) (in Japanese), Sōtetsu–JR Link Line, Sōtetsu–Tōkyū Link Line, retrieved 15 March 2023
- "「相鉄・東急直通線」2023年3月開業へ 連絡線と駅2つを新設" ["Sotetsu/Tokyu Link line" to open in March 2023, New connecting line and two new stations] (in Japanese). Asahi Shimbun. 28 January 2022. Archived from the original on 31 January 2022. Retrieved 6 August 2022.
- "相模鉄道,3月18日にダイヤ改正を実施" [Sagami Railway implements timetable revision on March 18]. Japan Railfan Magazine Online (in Japanese). Archived from the original on 17 December 2022. Retrieved 17 December 2022.
- 東京都交通局経営計画2016 [Tokyo Metropolitan Bureau of Transportation Operational Plans 2016] (PDF). Tokyo Metropolitan Bureau of Transportation. 12 February 2016.
- 調達予定(2018年度) (PDF). Tokyo Metropolitan Bureau of Transportation. May 2018.
- 都営三田線 8両編成車両導入を検討 [Toei Mita Line, Evaluating the Introduction of 8-car Trains]. Tokyo MX TV Official YouTube News. 19 August 2018.
- "都営三田線6500形第1編成が甲種輸送される" [Toei Mita Line 6500 type 1st formation is transported]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 1 November 2020. Archived from the original on 2 November 2020. Retrieved 2 November 2020.
- 東京都交通局6500形が営業運転を開始 [Toei 6500 series begins commercial operation]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 15 May 2022. Archived from the original on 16 May 2022. Retrieved 16 July 2022.
- 都営三田線「8両化」乗り入れ各社はどう動く?新車は近畿車輛が落札、目黒線も駅改修進む [Toei Mita Line "8-car" - How will each company move?]. Toyo Keizai Shimbun Online (in Japanese). 30 July 2018. Archived from the original on 4 June 2022. Retrieved 25 December 2022.
- 都営交通お客様センター等に寄せられたお客様の声(平成30年5月分速報値) (PDF). Tokyo Metropolitan Bureau of Transportation. May 2018.
- 相模鉄道,東急直通用の新形車両20000系を導入 [Sagami Railway introduces new 20000 series train model for use on Tokyu through services]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 6 June 2017. Retrieved 22 March 2023.
- 相鉄20000系が営業運転を開始 [Sotetsu 20000 series starts commercial operation]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 12 February 2018. Retrieved 22 March 2023.
- "開業 PR ロゴ・駅ナンバーを決定しました" [Opening PR logo and station number decided] (PDF). tokyu.co.jp (in Japanese). 16 September 2022. Archived from the original (PDF) on 16 September 2022. Retrieved 26 December 2022.
- "New railway link shortens ride from Kanagawa into Tokyo - The Asahi Shimbun: Breaking News, Japan News and Analysis". The Asahi Shimbun. 18 March 2023. Retrieved 18 March 2023.
- "Train Departures of Tōkyū Shin-yokohama Line" (PDF). tokyu.co.jp. 18 March 2023.
- "Train Departures of Tōkyū Shin-yokohama Line" (PDF). tokyu.co.jp. 18 March 2023.
- 相模鉄道株式会社及び東急電鉄株式会社の鉄道事業の旅客運賃(加算運賃)上限設定認可申請に関する意見募集結果について (in Japanese). Railway Bureau of the Ministry of Land, Infrastructure, Transport and Tourism. 21 October 2022. p. 8. Archived from the original (PDF) on 1 November 2022. Retrieved 20 December 2022.
綱島駅、新綱島駅は同一駅ではなく、綱島駅で下車し、新綱島駅で再度乗車する場合には、綱島駅で一度運賃精算を行う必要があり[...] (Tsunashima and Shin-tsunashima are not a single station. In the case of alighting at Tsunashima then boarding another train at Shin-tsunashima, the fare must be first settled at Tsunashima station.)