Tower M, formerly known as the KLCC East Gate Tower, is a proposed megatall skyscraper project in Kuala Lumpur, Malaysia situated within the Kuala Lumpur City Centre (KLCC). KLCC Property Holdings Berhad, which was also responsible for the development of the Petronas Twin Towers, is currently developing the building as part of the revised KLCC Development Master Plan 1995. The masterplan was reviewed in 2012 to enhance the development potential of the development's remaining undeveloped parcels.[3]
Tower M | |
---|---|
Former names | KLCC East Gate Tower |
General information | |
Status | Proposed |
Type | Office |
Architectural style | Neo-futurism |
Location | Kuala Lumpur City Centre, Kuala Lumpur, Malaysia |
Estimated completion | 2045 (if constructed) |
Owner | KLCC Property Holdings Berhad (KLCCP) |
Height | 700 m (2,297 ft) |
Technical details | |
Floor count | 145 |
Design and construction | |
Architect(s) | Kohn Pedersen Fox Associates NRY Architects[1] |
Developer | KLCC Property Holdings Bhd |
Main contractor | Samsung C&T BAUER Group |
References | |
[2] |
The Tower M precinct will consist of three office towers on top of a retail podium and come upon four acres of land named Lots L, L1 and M next to Persiaran KLCC MRT station, previously KLCC East on the Putrajaya Line.[4] It is planned to be 700 m (2,297 ft) high with 145-storeys.[5][6] In July 2018, KLCCH which is the landowner stated that there are no immediate plans to construct the office towers. If the demand arises, planning is unlikely to start before the year 2035.[7]
Progress
The piling and foundation works for the tower started in early 2019.[8] Foundation works of the tower goes deep into the ground as 130 to 150m depth on the base of the tower. Works of it had to be done along with the construction of the upcoming MRT underground station due to the strict requirement of movements on the structure.
The first phase of the Tower M precinct is a 6-storey retail podium building and a gallery space for Petronas under the masterplan. The mall would be integrated with the upcoming MRT station served by the Putrajaya Line which is scheduled to be completed by early 2023.[9] The structure of the building is designed in the form of cantilever and atypical facade. The construction of its retail component commenced in July 2019 while part of Phase 1 is being developed by Samsung C&T (KL) Sdn Bhd, a subsidiary of the Samsung C&T Corp.[10]
Transportation
The tower and its retail mall will be served by the PY21 Persiaran KLCC MRT station which is located underneath Jalan Binjai. It would also serve the whole KLCC district. The station is not connected to any interchange.
References
- "Tower M - the Skyscraper Center".
- "Tower M - the Skyscraper Center".
- "A 145-storey skyscraper on the cards?". The Edge Markets. 18 July 2018. Retrieved 5 October 2021.
- "New 700m skyscraper coming up in KLCC".
- "East Gate Tower -The Skyscraper Center". www.skyscrapercenter.com. Retrieved 9 November 2017.
- http://www.freemalaysiatoday.com/category/nation/2018/07/16/new-super-tall-triplets-in-kl-to-make-up-for-twin-towers-loss-to-pnb-118/
- "KLCC Holdings says no plans for mega skyscraper Tower M".
- "Tower M - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 5 October 2021.
- C, Samsung; Manager, T. Global PR (8 July 2019). "Samsung C&T Wins Bid to Construct Kuala Lumpur City Centre's Podium Building". Samsung C&T Newsroom. Retrieved 5 October 2021.
- "LOT LL1M KLCC RETAIL PODIUM & GALLERY – BIMASIA Sdn Bhd". www.bimasia.com.my. Retrieved 5 October 2021.