Trafford Park Line
The Trafford Park Line is a light rail line on the Manchester Metrolink network in Greater Manchester, England, running from Pomona to The Trafford Centre. Its name derives from Trafford Park, an area of the Metropolitan Borough of Trafford, and the first planned industrial estate in the world.[1] The line opened in March 2020.
Trafford Park Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Manchester Trafford | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 9 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Transport for Greater Manchester | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Tram/Light rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Manchester Metrolink | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Bombardier M5000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 22 March 2020 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 5.5 km (3.4 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Reserved track & limited street running | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 volts DC overhead | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 40 mph (64km/h) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
History
Between July and September 2014, Transport for Greater Manchester conducted a public consultation to build the line.[2][3] In November 2014, the agency applied for power under the Transport and Works Act 1992 to build and operate the line.[4] In October 2016, power to build the line was granted by the Secretary of State for Transport.[5][6][7][8] Construction commenced in January 2017.[9][10]
The final stretch of track was laid in November 2019, with the first test trams running soon after. The line opened on 22 March 2020, eight months earlier than originally planned,[11][12] despite suggestions that it might be delayed[13] as part of a review of all Metrolink services because of the COVID-19 pandemic.[14]
Route description
The line branches off from the Eccles Line immediately south of Pomona, where provision was made for a future junction at the south–western end when the viaduct on which it sits was built in the late 1990s. Stops have been built at Wharfside, Imperial War Museum, Village, Parkway, Barton Dock Road and the Trafford Centre. Future provision has been made to extend the line to Port Salford.[15]
Services operate as a self-contained shuttle between Cornbrook and The Trafford Centre.[16]
Rolling stock
To provide rolling stock for the line and other service expansions, 27 Bombardier M5000 trams were ordered; these incorporate modifications to the existing fleet including new touch screen Vecom units for drivers.[17][18]
References
- Nicholls, Robert (1996), Trafford Park: The First Hundred Years, Phillimore & Co, p. xiii, ISBN 978-1-86077-013-5
- "Consultation on Manchester Metrolink extension set to begin]". Rail Technology Magazine. 16 June 2014.
- "Trafford Centre Metrolink plans to be discussed". BBC News. 7 July 2014.
- "Trafford Park Line". Transport for Greater Manchester. Archived from the original on 14 March 2016.
- "Metrolink's Trafford Park £350m Tramline Approved]". BBC News. 13 October 2016.
- "Green light for new Trafford Park Metrolink line". Metrolink. 14 October 2016.
- "Metrolink line to the Trafford Centre will go ahead despite objections from Coronation Street and Manchester United]". Manchester Evening News. 14 October 2016.
- "Powers granted for Manchester Metrolink Trafford Park extension". Railway Gazette International. 14 October 2016.
- "Ground broken on Manchester's Trafford Park Line". Global Rail News. Retrieved 15 January 2017.
- Rucki, Alexandra (10 July 2018). "This is the route new tram line to the Trafford Centre will take". Manchester Evening News.
- "Metrolink's Trafford Park £350m tramline opening date revealed". BBC. Retrieved 10 March 2020.
- "People in Greater Manchester urged not to use public transport for anything other than 'essential journeys, with services to be 'stepped down' from Sunday". Manchester Evening News. 21 March 2020.
- "Metrolink's Trafford Park line to open as planned at weekend". Place North West. 20 March 2020.
- Charlotte Cox (19 March 2020). "Trafford Park tram line opening in doubt as Metrolink bosses hold crunch talks about network reductions". Manchester Evening News. Archived from the original on 20 March 2020. Retrieved 20 March 2020.
- "Metrolink future network" (PDF). TfGM. Archived from the original (PDF) on 3 December 2013.
- "Trafford Park Line opening date announced". Transport for Greater Manchester. 9 March 2020. Archived from the original on 14 March 2020. Retrieved 14 March 2020.
- "27 new trams on the way for Metrolink". Transport for Greater Manchester.
- "Manchester orders 27 LRVs to boost Metrolink capacity". International Railway Journal. 3 July 2018. Archived from the original on 22 March 2020.
External links
Media related to Manchester Metrolink Trafford Park Line at Wikimedia Commons