WeGo Star

The WeGo Star (reporting mark NRTX) (formerly the Music City Star) is a commuter rail service which runs between Nashville and Lebanon, Tennessee. The service uses the existing track of the Nashville and Eastern Railroad. The line stops at seven stations: Riverfront, Donelson, Hermitage, Mt. Juliet, Martha, Hamilton Springs and Lebanon. The operation covers 32 miles (51 km) of rail line. Service began on September 18, 2006.[2] In 2022, the system had a ridership of 92,100.

WeGo Star
Three EMD F40PH locomotives in use by the WeGo Star lined up within the Lebanon, Tennessee yards. The third F40PH on the far right is a former Amtrak locomotive painted in its original Pacific Surfliner scheme which has since been repainted as of 2020.
Three EMD F40PH locomotives in use by the WeGo Star lined up within the Lebanon, Tennessee yards. The third F40PH on the far right is a former Amtrak locomotive painted in its original Pacific Surfliner scheme which has since been repainted as of 2020.
Overview
OwnerTennessee Department of Transportation (TDOT)
LocaleNashville Metropolitan Area
Transit typeCommuter rail
Number of lines1
Number of stations7
Annual ridership92,100 (2022)[1]
WebsiteOfficial website
Operation
Began operationSeptember 18, 2006 (2006-09-18)
Operator(s)Tennessee Regional Transportation Authority (RTA)
Reporting marksNRTX
Number of vehicles4 Locomotives
11 Coaches
Train length2-3 Gallery cars
Technical
System length32 mi (51.5 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Average speed37 mph (60 km/h)
Top speed79 mph (127 km/h)
System map
Distance
Station
0 mi
Riverfront
Connection to CSX
10 mi
16 km
Donelson
15 mi
24 km
Hermitage
19 mi
31 km
Mt. Juliet
25 mi
40 km
Martha
28 mi
45 km
Hamilton Springs
32 mi
51 km
Lebanon
Connection to NERR

Description

The Star is considered a "starter" project to demonstrate the effectiveness of commuter rail service to the metro Nashville area. Expansion plans include as many as six more lines, terminating in Gallatin, Columbia, Murfreesboro, Dickson, Springfield, and Clarksville via Ashland City. All are planned to use existing CSX Transportation railroad lines. The planned seven lines meet in central Nashville in a star formation, hence the name of the system, which also alludes to the city's many country music stars.

The Star is the first passenger train service of any kind for Nashville since the discontinuation of Amtrak's Floridian in 1979. The Nashville and Eastern line, part of the former Tennessee Central Railway, had not seen passenger service for many decades prior to the Star, with the exception of excursion trains operated by the Tennessee Central Railway Museum and the Broadway Dinner Train.

Rolling stock

Current Locomotives

ModelsBuiltNumberRoad Numbers
F40PH-21980-19853120–122
F40PHR19811381

Coaches

Numbers Type Heritage Built Quantity Builder Disposition
400-402
500-504
Coach/Cab
Coach
Chicago and North Western 1968
1961
8 Pullman 401 and 504 operating as backup set, 402 used for fire department training, remainder scrapped 2020
790 and 795
701, 708, 712, 719, 723, 733
Coach/Cab


Coach
Burlington Route 1965

1950-65
8 Budd Acquired 2020 from MItrain. Painted in WeGo Transit colors.

The WeGo Star regional rail service is currently served by four rebuilt ex-Amtrak EMD F40PH locomotives and seven former Chicago Metra coaches, standard gauge. The coaches are bilevel rail cars with seating on both levels.

Since 2022, all four F40PH locomotives have been rebuilt and repainted into the new WeGo paint scheme. 381 previously wore Amtrak's Pacific Surfliner paint scheme until late 2020.[2] The coaches used also saw an overhaul; the former Metra Pullman-Standard coaches were withdrawn from service around 2020 and were replaced with corrugated stainless steel Budd bi-level gallery coaches formerly used by Chicago Burlington and Quincy, RTA, Metra, and the planned MiTrain.[3] Despite this, the older Pullman-Standard cars are still used on occasion.

Lines

Riverfront station in downtown Nashville

Currently there is only one line, with six more planned to other satellite cities around Nashville.

The current line is 32 miles (51 km) long with seven stations. The line is mostly single-track, so this limits arrivals and departures to how long each train has to wait for the other to pass. The first "starter line" cost $41 million, or just under $1.3 million per mile, which made it the most cost-efficient commuter rail start-up in the nation.[4]

East Corridor line

Ridership

WeGo Star ridership steadily increased from 104,785 passenger trips in 2007 to 277,148 trips in 2012.[5] In 2013, ridership decreased to 253,421 trips,[5] but then steadily increased to 298,800 passenger trips in 2018.[6][7] in 2019 ridership has slightly decreased to 292,500 passenger trips. During the 2020 pandemic, ridership plummeted to 77,200 with a majority of the rides being in the first quarter of the year, it fell further in 2021 to 57,500 although the 4th quarter saw immense improvement compared to the 4th quarter of 2020. 2022 saw a large rebound in ridership, although not even half of pre-pandemic levels.[8]

History

The train began operations on September 18, 2006, becoming the 18th commuter rail system in the United States,[2] with a projected daily ridership of 1,500 passengers. The service launched with an estimated annual cost of $3.3 million, of which $1.3 million was covered by revenues.[9]

In the first month after service began, ridership failed to reach the projected goals,[9] a situation which continued for several years, culminating with a financial shortfall of $1.7 million by the summer of 2008, of which the state of Tennessee covered $1 million in a bailout of the service.[10] Financial difficulties continued into the next year; in June 2009, the service was nearly shut down for lack of funds until state and local authorities granted the service $4.4 million to continue service until 2011.[11]

During 2010, a third passenger car was added to all WeGo Star trains to accommodate increasing ridership.[12]

On May 2, 2010, the East Corridor line was closed because of damage related to the floods that hit Middle Tennessee. Flood waters pushed tracks off a concrete trestle over Sinking Creek in downtown Lebanon. This trapped Star trains at their Lebanon storage yard, causing RTA to suspend service until the trestle was repaired. MTA substituted chartered buses instead, picking up passengers at all stations except Martha.[13] The line was repaired in one week.

The COVID-19 pandemic in Tennessee in 2020 briefly resulted in the shutdown of Star rail service, but service resumed on June 15, 2020 with eight trains each weekday — two each way in the morning and two more in the afternoon.[14]

A proposed expansion of the system to Clarksville and Ashland City is projected to cost $525 million.[15]

See also

References

  1. "Transit Ridership Report Fourth Quarter 2022" (PDF). American Public Transportation Association. March 1, 2023. Retrieved March 29, 2023.
  2. "A Star is born: Nashville commuter trains to begin Sept. 18". Trains. August 31, 2006. Retrieved August 6, 2010.
  3. Humbles, Andy. "Music City Star upgrades closer for Wilson and East Davidson county train service". The Tennessean.
  4. Latham, Garl B. (2008). Rail Transit: An Oklahoma Economic Opportunity (PDF). OnTrac. Archived from the original (PDF) on June 28, 2010.
  5. Harrison, Scott (May 2, 2014). "The little engine that hasn't: Thinking it can hasn't been enough for Music City Star". Nashville Business Journal. Retrieved August 21, 2015.
  6. "Public Transportation Ridership Report" (PDF). American Public Transportation Association. April 12, 2018. Retrieved August 25, 2019.
  7. "Ridership Report".
  8. "Ridership Report".
  9. "Music City Star fails to meet ridership goals". Trains. October 27, 2006.
  10. "Tennessee offers to bail out Music City Star". Trains. July 17, 2008.
  11. "Music City Star gets two more years of funding". Trains. June 22, 2009.
  12. "Music City Star ridership continues to climb" (PDF). Regional Transportation Authority. October 12, 2010. Retrieved October 19, 2010.
  13. "Bus, Train Service Suspended". NewsChannel5.com. May 2, 2010. Archived from the original on May 6, 2010.
  14. "COVID-19 Modified Service Plan" (PDF). RTA. June 14, 2020.
  15. Gonzalez, Tony (May 10, 2016). "Middle Tennessee's Best Hope For New Commuter Rail Is Taking Shape; Here's What It Looks Like". Nashville Public Radio. Retrieved April 14, 2018.
Template:Attached KML/WeGo Star
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.