Wendover railway station

Wendover railway station serves the village of Wendover in Buckinghamshire, England, and villages including Ellesborough and Wendover Dean. The station is on the London Marylebone – Aylesbury line and is served by Chiltern Railways trains. It is between Great Missenden and Stoke Mandeville stations.

Wendover
National Rail
General information
LocationWendover, Buckinghamshire
England
Grid referenceSP865077
Managed byChiltern Railways
Platforms2
Other information
Station codeWND
ClassificationDfT category E
History
Opened1892
Passengers
2017/18Decrease 0.492 million
2018/19Increase 0.511 million
2019/20Decrease 0.485 million
2020/21Decrease 97,592
2021/22Increase 0.268 million
Location
Notes
Passenger statistics from the Office of Rail and Road

History

The station was opened on 1 September 1892 by the Metropolitan Railway (Met), when the railway was extended from Chalfont Road to Aylesbury Town. The Great Central Railway served the station from 1899, linking the station with Leicester, Nottingham, and Sheffield.

When London Underground's Metropolitan line (the successor of the Met) was fully electrified in the late 1950s and early 1960s, a decision was made to run only as far as Amersham. This meant that Wendover was henceforth now only served by main line services; following the end of steam-hauled Metropolitan line trains in 1961 the service was provided by British Rail Class 115 diesel multiple units until 1992 (which were then replaced by the line's current rolling stock). Responsibility for the station (and the railway north of Amersham to Aylesbury) was transferred from London Transport to British Railways on 11 September 1961;[1] British Railways signage gradually replaced that of the London Underground.

In 1966 as a result of The Reshaping of British Railways report, British Rail closed the line north of Aylesbury and the station is now only served by local commuter services. British Rail ran services until privatisation in 1996, when Chiltern Railways took over the franchise.

During the modernisation of the Met in the 1950s, the down (Aylesbury) platform buildings were demolished. In 1989-90 BR's Network SouthEast refurbished the station and the "up" (London) platform canopy was shortened slightly.

During 2013 a new footbridge (with lifts) was constructed (just beyond the London end of the canopy on the Up platform). The old footbridge steps to the platforms were removed, this footbridge still provides a link from outside the station on the Up side to the outside of the station on the Down side.

Services

At peak times there are up to four trains per hour towards London in the morning, and returning from London (towards Aylesbury) in the evening. Some of these are express services, which skip the stops shared with the Metropolitan line nearer to London.

Journeys to Marylebone take about 50 minutes (40 minutes for express trains). Journeys to Aylesbury take about 10 minutes.

The normal off-peak service pattern is as follows:

  • 2 trains per hour to Aylesbury
    • 1 train per hour continues on to Aylesbury Vale Parkway
  • 2 trains per hour to London Marylebone
Preceding station National Rail National Rail Following station
Stoke Mandeville   Chiltern Railways
London to Aylesbury Line
  Great Missenden
Disused railways
Preceding station London Underground Following station
Stoke Mandeville
towards Aylesbury
Metropolitan line Great Missenden

Onward connections

Very few buses are available from Wendover (the main one being the 50 between Aylesbury and RAF Halton with a minor service 55 operating between Aylesbury and Chesham). The nearest taxi firms are in Aylesbury, except Alexander's Taxis, whose office is about five metres from the entrance to Wendover railway station.

References

  1. The Railway Magazine, August 2013 edition (page 47), ISSN 0033-8923

51.762°N 0.747°W / 51.762; -0.747

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.