Line 3 (Hangzhou Metro)

Line 3 of the Hangzhou Metro (simplified Chinese: 杭州地铁三号线; traditional Chinese: 杭州地鐵三號線; pinyin: Hángzhōu Dìtiě Sānhào Xiàn) is a metro line in Hangzhou.[3][4] The line is 57.5 km long.[2] It will run in a southwest-northeast direction between Wushanqiancun station in Yuhang District and Xingqiao station[1] in Linping District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line uses 6-car Type AH rolling stock, which is designed for exclusive use in Hangzhou.[5]

Line 3
 3 
Overview
StatusIn operation
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations39[2]
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Xingqiao Depot
Xiaoheshan Stabling Yard
Cangqian Depot
Rolling stock6 cars, type AH
History
OpenedFebruary 21, 2022 (2022-02-21)
Technical
Line length57.5 km (35.73 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

Cangqian Stabling Yard
1
Wushanqiancun
2
Tangjiacun
Tiaoxi Up arrow
3
West Railway Station
 19  Hangzhou West Railway Station
4
North Longzhou Road
5
West Wenyi Road
Left arrow East Nanhu
6
Lvting Road
 5   16 
7
Chuangming Road
8
Quanfeng
9
Gaojiao Road
10
Liansheng Road
11
Hongyuan
district
Yuhang
Xihu
b1
Shima
b2
Xiaoheshan
Xiaoheshan Stabling Yard
b3
Pingfeng
b4
Liuxia
12
South Xixi Wetland
13
Huawu
14
Dongyue
15
Gudun Road
16
Gudang Xincun
17
Gudang
Left arrow Zhejiang University  Yisheng Road Right arrow
18
Huanglong Sports Center
 10 
19
Huanglong Cave
20
Wulinmen
 2 
Left arrow Chaoyang  Liangzhu Right arrow
district
Xihu
Gongshu
21
Wulin Square
 1 
Line 1 interconnection
22
West Lake Cultural Square
 1   19 
Left arrow Yongsheng Road  Tiaoxi Right arrow
23
Chaowang Road
24
Xiangji Temple
25
Daguan
26
Shanxian
 5 
Left arrow Guniangqiao  East Nanhu Right arrow
Line 5 interconnection
27
Xintiandi Street
 4 
28
Qilun Square
29
Huafeng Road
district
Gongshu
Shangcheng
30
Tongxie Road
31
Taohuahu Park
32
Dingqiao
Xingqiao Depot
33
Huahe Street
district
Shangcheng
Linping
34
Huangheshan
35
Xingqiao

Opening timeline

The initial section of the line, from Xingqiao to Chaowang Road was opened to public on 21 February 2022,[6][7] and the remaining section from Chaowang Road to West Wenyi Road and the branch from South Xixi Wetland to Shima was opened on 10 June 2022.[8] The Northern extension from West Wenyi Road to Wushanqiancun was opened on 22 September 2022.[9]

SegmentCommencementLengthStation(s)Name
Chaowang RoadXingqiao 21 February 2022 21 km (13.05 mi) 13 Phase 1 initial section[6]
West Wenyi Road — Chaowang Road 10 June 2022 22.41 km (13.92 mi) 16 Phase 1 remaining section[8]
ShimaSouth Xixi Wetland 7.8 km (4.85 mi) 4
Wulinmen 20 July 2022 infill station 1 Phase 1 remaining section[8]
Wushanqiancun — West Wenyi Road 22 September 2022 4.7 km (2.92 mi)[10] 3 Phase 1 adjustment section[11]

Service routes

  • Wushanqiancun — Xingqiao
  • Shima — Xingqiao

Stations

Line 3 drawn to scale.
Legend

  - Operational
  - Under construction

Service
routes
Station name Connections Distance
km
Location Opening Date
English[12] Chinese[1]
Shima 石马 10.71 Xihu 10 June 2022
Xiaoheshan 小和山 1.25 11.96
Pingfeng 屏峰 2.00 13.96
Liuxia 留下 2.75 16.71
Wushanqiancun 吴山前村 0.00 0.00 Yuhang 22 September 2022
Tangjiacun 汤家村 Unopened
West Railway Station 火车西站  19  22 September 2022
North Longzhou Road[13] 龙舟北路
West Wenyi Road 文一西路 7.20 10 June 2022
Lvting Road 绿汀路  5   16  2.24 9.44
Chuangming Road 创明路 1.27 10.71 Unopened
Quanfeng 全丰 2.04 12.75 10 June 2022
Gaojiao Road 高教路 1.41 14.16
Liansheng Road 联胜路 1.50 15.66
Hongyuan 洪园 1.62 17.28
South Xixi Wetland 西溪湿地南 1.23 18.51 Xihu
Huawu 花坞 1.66 20.17
Dongyue 东岳 1.68 21.85
Gudun Road 古墩路 0.83 22.68
Gudang Xincun 古荡新村 1.20 23.88
Gudang 古荡 0.94 24.82
Huanglong Sports Center 黄龙体育中心  10  0.93 25.75
Huanglong Cave 黄龙洞 1.23 26.98
Wulinmen 武林门  2  1.42 28.40 20 July 2022
Wulin Square 武林广场  1  1.14 29.54 Gongshu 10 June 2022
West Lake Cultural Square 西湖文化广场  1   19  0.84 30.38
Chaowang Road 潮王路 1.26 31.64 Gongshu 21 February 2022
Xiangji Temple 香积寺 1.61 33.25
Daguan 大关 1.04 34.29
Shanxian 善贤  5  1.50 35.79
Xintiandi Street 新天地街  4  2.02 37.81
Qilun Square 汽轮广场 2.04 39.85
Huafeng Road 华丰路 1.70 41.55
Tongxie Road 同协路 1.22 42.77 Shangcheng
Taohuahu Park 桃花湖公园 1.37 44.14
Dingqiao 丁桥 1.28 45.42
Huahe Street 华鹤街 2.11 47.53
Huangheshan 黄鹤山 1.32 48.85 Linping
Xingqiao 星桥 1.84 50.69

See also

References

  1. "杭州市人民政府关于杭州地铁3号线一期工程车站站名及地铁5号线"香积寺路站"更名的批复".
  2. "杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成". 2019-10-30.
  3. "杭州地铁3号线一期年底开工". ZJNews. 14 July 2017.
  4. "工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成". Hangzhou Daily. 2 March 2017.
  5. "省发展改革委关于杭州地铁3号线一期工程初步设计的批复". www.zjdpc.gov.cn. Archived from the original on 2018-02-10. Retrieved 2019-02-08.
  6. "开通400+ 今天上午11点,杭州地铁3、4、10号线,三线齐开". Archived from the original on 2022-06-08.
  7. "杭州亚运会倒计时200天:杭州地铁"三线齐开"-中新网". www.chinanews.com.cn. Retrieved 2022-09-21.
  8. "6月10日上午10点,3号线后通段上线!". Archived from the original on 2022-06-08.
  9. "明日14时,杭州地铁19号线开通运营!3号线北延段、10号线黄龙体育中心站同步开通-杭州新闻中心-杭州网". hznews.hangzhou.com.cn. Retrieved 2022-09-21.
  10. "多条轨道交通快速推进!杭州地铁10号线计划年底通车!". 3号线北延段长约4.7公里,设站4座
  11. "杭州地铁3号线一期工程调整环境影响评价信息公示". 杭州地铁. Archived from the original on 2020-01-19. Retrieved 2019-11-01.
  12. "Photo of official map".
  13. "杭州市人民政府关于杭州机场轨道快线工程、地铁3号线一期工程及5号线二期工程车站站名的批复". 2022-06-16. Archived from the original on 2022-06-16.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.