TGV

The TGV (French: Train à Grande Vitesse, "high-speed train"; previously TurboTrain à Grande Vitesse) is France's intercity high-speed rail service, operated by SNCF. SNCF worked on a high-speed rail network from 1966 to 1974 and presented the project to President Georges Pompidou who approved it. Originally designed as turbotrains to be powered by gas turbines, TGV prototypes evolved into electric trains with the 1973 oil crisis. In 1976 the SNCF ordered 87 high-speed trains from Alstom. Following the inaugural service between Paris and Lyon in 1981 on the LGV Sud-Est (LGV for Ligne à Grande Vitesse; "high-speed line"), the network, centered on Paris, has expanded to connect major cities across France (including Marseille, Lille, Bordeaux, Strasbourg, Rennes and Montpellier) and in neighbouring countries on a combination of high-speed and conventional lines. The TGV network in France carries about 110 million passengers a year.

TGV
TGV Sud-Est (left), the first equipment used on the service and TGV 2N2 (right), the newest equipment used on the service, at Gare de Lyon station, 2019.
Overview
LocaleFrance, with services extending to Belgium, Luxembourg, Germany, Switzerland, Italy, Spain and the Netherlands
Dates of operation1981present
Technical
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
Other
WebsiteTGV on sncf.com
LGV network
High-speed lines in France

The high-speed tracks, maintained by SNCF Réseau, are subject to heavy regulation. Confronted with the fact that train drivers would not be able to see signals along the track-side when trains reach full speed, engineers developed the TVM cab-signalling technology, which would later be exported worldwide. It allows for a train engaging in an emergency braking to request within seconds all following trains to reduce their speed; if a driver does not react within 1.5 km (0.93 mi), the system overrides the controls and reduces the train's speed automatically. The TVM safety mechanism enables TGVs using the same line to depart every three minutes.[1][2]

A TGV test train set the world record for the fastest wheeled train, reaching 574.8 km/h (357.2 mph) on 3 April 2007.[3] Conventional TGV services operate up to 320 km/h (200 mph) on the LGV Est, LGV Rhin-Rhône and LGV Méditerranée.[4] In 2007, the world's fastest scheduled rail journey was a start-to-stop average speed of 279.4 km/h (173.6 mph) between the Gare de Champagne-Ardenne and Gare de Lorraine on the LGV Est,[5][6] not surpassed until the 2013 reported average of 283.7 km/h (176.3 mph) express service on the Shijiazhuang to Zhengzhou segment of China's Shijiazhuang–Wuhan high-speed railway.[7]

The TGV was conceived at the same period as other technological projects sponsored by the Government of France, including the Ariane 1 rocket and Concorde supersonic airliner; those funding programmes were known as champion national policies (literal translation: national champion). The commercial success of the first high-speed line led to a rapid development of services to the south (LGV Rhône-Alpes, LGV Méditerranée, LGV Nîmes–Montpellier), west (LGV Atlantique, LGV Bretagne-Pays de la Loire, LGV Sud Europe Atlantique), north (LGV Nord, LGV Interconnexion Est) and east (LGV Rhin-Rhône, LGV Est). Neighbouring countries Italy, Spain and Germany developed their own high-speed rail services.

The TGV system itself extends to neighbouring countries, either directly (Italy, Spain, Belgium, Luxembourg and Germany) or through TGV-derivative networks linking France to Switzerland (Lyria), to Belgium, Germany and the Netherlands (Thalys), as well as to the United Kingdom (Eurostar). Several future lines are planned, including extensions within France and to surrounding countries. Cities such as Tours and Le Mans have become part of a "TGV commuter belt" around Paris; the TGV also serves Charles de Gaulle Airport and Lyon–Saint-Exupéry Airport. A visitor attraction in itself, it stops at Disneyland Paris and in tourist cities such as Avignon and Aix-en-Provence as well. Brest, Chambéry, Nice, Toulouse and Biarritz are reachable by TGVs running on a mix of LGVs and modernised lines. In 2007, SNCF generated profits of €1.1 billion (approximately US$1.75 billion, £875 million) driven largely by higher margins on the TGV network.[8][9]

History

Europe's high-speed rail system, including TGV Lines in France

The idea of the TGV was first proposed in the 1960s, after Japan had begun construction of the Shinkansen (also known as the "bullet train") in 1959. At the time the Government of France favoured new technology, exploring the production of hovercraft and the Aérotrain air-cushion vehicle. Simultaneously, the SNCF began researching high-speed trains on conventional tracks. In 1976, the administration agreed to fund the first line. By the mid-1990s, the trains were so popular that SNCF President Louis Gallois declared that the TGV was "the train that saved French railways".[10]

Development

It was originally planned that the TGV, then standing for très grande vitesse ("very high speed") or turbine grande vitesse ("high-speed turbine"), would be propelled by gas turbines, selected for their small size, good power-to-weight ratio and ability to deliver high power over an extended period. The first prototype, TGV 001, was the only gas-turbine TGV: following the increase in the price of oil during the 1973 energy crisis, gas turbines were deemed uneconomic and the project turned to electricity from overhead lines, generated by new nuclear power stations.

TGV 001 was not a wasted prototype:[11] its gas turbine was only one of its many new technologies for high-speed rail travel. It also tested high-speed brakes, needed to dissipate the large amount of kinetic energy of a train at high speed, high-speed aerodynamics, and signalling. It was articulated, comprising two adjacent carriages sharing a bogie, allowing free yet controlled motion with respect to one another. It reached 318 km/h (198 mph), which remains the world speed record for a non-electric train. Its interior and exterior were styled by French designer Jacques Cooper, whose work formed the basis of early TGV designs, including the distinctive nose shape of the first power cars.

Changing the TGV to electric traction required a significant design overhaul. The first electric prototype, nicknamed Zébulon, was completed in 1974, testing features such as innovative body mounting of motors, pantographs, suspension and braking. Body mounting of motors allowed over 3 tonnes to be eliminated from the power cars and greatly reduced the unsprung weight. The prototype travelled almost 1,000,000 km (620,000 mi) during testing.

In 1976 the French administration funded the TGV project, and construction of the LGV Sud-Est, the first high-speed line (French: ligne à grande vitesse), began shortly afterwards. The line was given the designation LN1, Ligne Nouvelle 1 ("New Line 1"). After two pre-production trainsets (nicknamed Patrick and Sophie) had been tested and substantially modified, the first production version was delivered on 25 April 1980.

Service

A TGV Duplex in Héricourt, Haute-Saône on the LGV Rhin-Rhône
TGV service (partly on classic lines) to Bourg-Saint-Maurice in the French Alps is popular in the winter season.

The TGV opened to the public between Paris and Lyon on 27 September 1981. Contrary to its earlier fast services, SNCF intended TGV service for all types of passengers, with the same initial ticket price as trains on the parallel conventional line. To counteract the popular misconception that the TGV would be a premium service for business travellers, SNCF started a major publicity campaign focusing on the speed, frequency, reservation policy, normal price, and broad accessibility of the service.[12] This commitment to a democratised TGV service was enhanced in the Mitterrand era with the promotional slogan "Progress means nothing unless it is shared by all".[13] The TGV was considerably faster (in terms of door to door travel time) than normal trains, cars, or aeroplanes. The trains became widely popular, the public welcoming fast and practical travel.

The Eurostar service began operation in 1994, connecting continental Europe to London via the Channel Tunnel and the LGV Nord-Europe with a version of the TGV designed for use in the tunnel and the United Kingdom. The first phase of the British High Speed 1 line was completed in 2003, the second phase in November 2007. The fastest trains take 2 hours 15 minutes London–Paris and 1 hour 51 minutes London–Brussels. The first twice-daily London-Amsterdam service ran 3 April 2018, and took 3 hours 47 minutes.[14]

Milestones

Record runs of the TGV

The TGV was the world's third commercial and standard gauge high-speed train service,[15] after Japan's Shinkansen, which connected Tokyo and Osaka from 1 October 1964, and Britain's InterCity 125 on main lines such as the East Coast Main Line, which entered service in 1976.

A modified TGV test train holds the world speed record for conventional trains. On 3 April 2007 a modified TGV POS train reached 574.8 km/h (357.2 mph) under test conditions on the LGV Est between Paris and Strasbourg. The line voltage was boosted to 31 kV, and extra ballast was tamped onto the permanent way. The train beat the 1990 world speed record of 515.3 km/h (320.2 mph), set by a similarly shortened train (two power cars and three passenger cars), along with unofficial records set during weeks preceding the official record run. The test was part of an extensive research programme by Alstom.[16][17]

In 2007 the TGV was the world's fastest conventional scheduled train: one journey's average start-to-stop speed from Champagne-Ardenne Station to Lorraine Station is 279.3 km/h (173.5 mph).[5][6] This record was surpassed on 26 December 2009 by the new Wuhan-Guangzhou High-Speed Railway[18] in China where the fastest scheduled train covered 922 km (573 mi) at an average speed of 312.54 km/h (194.20 mph). However, on 1 July 2011 in order to save energy and reduce operating costs the maximum speed of Chinese high-speed trains was reduced to 300 km/h, but services between Shijiazhuang and Zhengzhou East on the line still achieve 283.4 km/h (176.1 mph) in each direction in 2015.[19] The revival of 350 km/h operation in 2017 on the Beijing–Shanghai high-speed railway allows for several services to complete the 1,318 km (819 mi) journey between Shanghai and Beijing in 4 hours and 24 min with an average speed of 299.5 km/h (186.1 mph).[20]

A Eurostar (TGV) train broke the record for the longest non-stop high-speed international journey on 17 May 2006 carrying the cast and filmmakers of The Da Vinci Code from London to Cannes for the Cannes Film Festival. The 1,421-kilometre (883 mi) journey took 7 hours 25 minutes on an average speed of 191.6 km/h (119.1 mph).[21]

The fastest single long-distance run on the TGV was done by a TGV Réseau train from Calais-Frethun to Marseille (1067.2 km, 663 mi) in 3 hours 29 minutes at a speed of 306 km/h (190 mph) for the inauguration of the LGV Méditerranée on 26 May 2001.[22]

Passenger usage

On 28 November 2003 the TGV network carried its one billionth passenger, a distant second only to the Shinkansen's five billionth passenger in 2000.

Excluding international traffic, the TGV system carried 98 million passengers during 2008, an increase of 8 million (9.1%) on the previous year.[23]

TGV passengers in millions from 1981 to 2010[24]
1980s
1980198119821983198419851986198719881989
1.266.089.2013.7715.3815.5716.9718.1019.16
1990199119921993199419951996199719981999
29.9337.0039.3040.1243.9146.5955.7362.6071.0074.00
2000s
2000200120022003200420052006200720082009
79.7083.5087.9086.7090.8094.0097.00106.00114.00122.00
2010s
2010
114.45
  1. from 1994 including Eurostar
  2. from 1997 including Thalys

Lines in operation

LineConnected cities/stationsYear of inaugurationOperational top speedType of trains
North corridor
LGV Nord Paris-Nord · Péronne · Arras · Lille · Calais 1993 300 km/h
HSL 1 1997 300 km/h Eurostar e300, Eurostar e320, Thalys PBA, Thalys PBKA
South-west corridor
LGV Atlantique 24 September 1989 300 km/h
Vendôme 25 September 1990
LGV Sud Europe Atlantique 2 July 2017 320 km/h
LGV Bretagne-Pays de la Loire 2 July 2017 320 km/h
South-east corridor
LGV Sud-Est Paris · Le Creusot · Mâcon · Lyon 22 September 1981 300 km/h
LGV Rhône-Alpes Lyon-Saint-Exupéry · Valence 13 December 1992 300 km/h
LGV Méditerranée Aix-en-Provence · Avignon · Valence 7 June 2001 320 km/h
LGV Rhin-Rhône Besançon · Belfort 11 December 2011 320 km/h TGV Duplex, TGV Réseau, TGV POS, Velaro D
LGV Perpignan–Figueres 19 December 2010 320 km/h
East corridor
LGV Est Paris-Est · Bezannes · Les Trois-Domaines · Louvigny 10 June 2007 320 km/h
Louvigny · Vendenheim · Strasbourg 3 July 2016 320 km/h

In June 2021 there were approximately 2,800 km of Lignes à Grande Vitesse (LGV), with four additional line sections under construction. The current lines and those under construction can be grouped into four routes radiating from Paris and one that currently only connects to Paris through a section of classical track: LGV Interconnexion Est connects LGV Sud-Est to LGV Nord around Paris.

Existing lines

  1. LGV Rhône-Alpes (Lyon to Valence) (opened 1992)
  2. LGV Interconnexion Est (LGV Sud-Est to LGV Nord Europe, east of Paris) (opened 1994)
  3. LGV Méditerranée (An extension of LGV Rhône-Alpes: Valence to Marseille-Saint-Charles) with a branch to Nîmes (opened 2001)
  4. LGV Perpignan–Figueres (Spain to France) (construction finished 17 February 2009, TGV service from 19 December 2010)[25]
  5. LGV Rhin-Rhône[26] (LyonDijon–Mulhouse), first phase opened 11 December 2011.
  6. LGV Sud Europe Atlantique (ToursBordeaux), extending the southern branch of the LGV Atlantique (also called LGV Sud-Ouest);[27] opened on 2 July 2017.
  7. LGV Bretagne-Pays de la Loire (Le Mans–Rennes), extending the western branch of the LGV Atlantique;[28][29] opened on 2 July 2017.
  8. Nîmes-Montpellier bypass extending the south-western stub of the LGV Méditerranée by 60 km towards the Spanish border; opened on 12 December 2017 for freight (July 2018 for passengers). It is however currently limited to a maximum speed of 220 km/h, since the installation of ETCS Level 2 allowing speeds up to 300 km/h is yet to be planned.

Under construction

  1. Lyon–Turin (Lyon–Chambéry–Turin), connecting to the Italian TAV network.[30]

Planned lines

In 2017 French President Emmanuel Macron announced a plan to "reassess" planned LGV construction, implying that many of the projects listed here will be delayed or not constructed at all. Contrary to this, the French government confirmed 5 new lines in late summer 2018.[31]

  1. LGV Bordeaux–Toulouse
  2. LGV Montpellier–Perpignan, the last gap in Europe's longest high-speed route between Paris and Málaga/Seville.
  3. LGV Poitiers–Limoges[32]
  4. LGV Provence-Alpes-Côte d'Azur (MarseilleNice), would reduce Paris–Nice travel times from 5h25 to 3h50.[33]
  5. LGV Sud Europe Atlantique Phase 3 (Bordeaux to Spanish Border)[34]
  6. LGV Rhin-Rhône[26] (LyonDijon–Mulhouse), second phase of the eastern branch construction initially planned to start in 2014, but funding is unclear for the western and southern branches.
  7. Extension to Narbonne of the LGV Bordeaux–Toulouse
  8. LGV Picardie (Paris–AmiensCalais), cutting off the corner of the LGV Nord-Europe via Lille.[30]
  9. LGV Normandie would run from Paris to Rouen, Le Havre, Caen and Cherbourg. The line would have a stop in La Défense where it would meet with a proposed link to LGV Nord and a proposed Eurostar service to terminate in La Défense.[35]
  10. LGV Paris–Orléans–Clermont-Ferrand–Lyon (POCL) On 30 July 2010, the government of then President Sarkozy announced that it expected to start work on a second LGV between Paris and Lyon between 2020 and 2030. The train line would run via Orléans and Clermont-Ferrand, at a length of 410 km, and is expected to cost €12bn.[36] The route will be known as LGV POCL (Paris, Orléans, Clermont-Ferrand and Lyon). Four potential routes are being studied as of 2011, with consultations continuing into 2012. Work would not start before 2025.[37]

Rolling stock

TGVs have semi-permanently coupled articulated un-powered coaches, with Jacobs bogies between the coaches supporting both of them. Power cars at each end of the trains have their own bogies. Trains can be lengthened by coupling two TGVs, using couplers hidden in the noses of the power cars. The articulated design is advantageous during a derailment, as the passenger carriages are more likely to stay upright and in line with the track. Normal trains could split at couplings and jackknife, as seen in the Eschede train disaster. A disadvantage is that it is difficult to split sets of carriages. While power cars can be removed from trains by standard uncoupling procedures, specialised depot equipment is needed to split carriages, by lifting the entire train at once. Once uncoupled, one of the carriage ends is left without a bogie at the split, so a bogie frame is required to support it. Using Power Cars instead of Electric Multiple Units easily allows for a high ride quality and less electrical equipment.[38]

There are five types of TGV equipment in use, all built by Alstom:

  • TGV Atlantique (10 carriages)
  • TGV Réseau (similar to Atlantique, but 8 carriages)
  • TGV Duplex (two floors for greater passenger capacity)
  • TGV POS (originally for routes to Germany, now used to Switzerland)
  • TGV 2N2 (Avelia Euroduplex) (upgrade of the TGV Duplex)

Retired sets:

  • TGV Sud-Est (retired in December 2019)
    • TGV La Poste (retired in June 2015)

Future sets:

  • Avelia Horizon (Entry into service in 2023)

Several TGV types have broken records, including the V150 and TGV 001. V150 was a specially modified five-car double-deck trainset that reached 574.8 km/h (357.2 mph) under controlled conditions on a test run. It narrowly missed beating the world train speed record of 581 km/h (361 mph).[39] The record-breaking speed is impractical for commercial trains due to motor overcharging, empty train weight, rail and engine wear issues, elimination of all but three coaches, excessive vibration, noise and lack of emergency stopping methods.

TGVs travel at up to 320 km/h (200 mph) in commercial use. All are at least bi-current, which means that they can operate at 25 kV, 50 Hz AC (including LGVs) and at 1.5 kV DC (such as the 1.5 kV lignes classiques south of Paris). Trains to Germany, Switzerland, Belgium and the Netherlands must accommodate other voltages, requiring tri-current and quadri-current TGVs. TGVs have two pairs of pantographs, two for AC use and two for DC. When passing between areas of different supply voltage, marker boards remind the driver to turn off power, lower the pantograph(s), adjust a switch to select the appropriate system, and raise the pantograph(s). Pantographs and pantograph height control are selected automatically based on the voltage system chosen by the driver. Once the train detects the correct supply, a dashboard indicator illuminates and the driver can switch on the traction motors. The train coasts across the boundary between sections.

Equipment type Top speed Seating
capacity
Overall length Width Weight,
empty (t)
Weight,
full (t)
Power,
at 25 kV (kW)
Power-to-weight ratio,
empty (kW/t)
First
built
km/hmph mft mft
TGV Atlantique* 300 190 485, 459 (rebuilt) 238 781 2.90 9.5 444 484 8,800 19.82 1988
TGV Réseau 320 200 377, 361 (rebuilt) 200 660 2.90 9.5 383 415 8,800 22.98 1992
TGV Duplex 320 200 508 200 660 2.90 9.5 380 424 8,800 23.16 1994
TGV POS 320 200 361 200 660 2.90 9.5 383 415 9,280 24.23 2005
Euroduplex 320 200 509(SNCF), 533(ONCF) 200 660 2.90 9.5 380 424 9,400 24.74 2011

TGV Sud-Est

A TGV Sud-Est set in the original orange livery, since superseded by silver and blue

The Sud-Est fleet was built between 1978 and 1988 and operated the first TGV service, from Paris to Lyon in 1981. There were 107 passenger sets, of which nine are tri-current (including 15 kV, 16+23 Hz AC for use in Switzerland) and the rest bi-current. There were seven bi-current half-sets without seats that carried mail for La Poste between Paris, Lyon and Provence, in a distinctive yellow livery until they were phased out in 2015.

Each set were made up of two power cars and eight carriages (capacity 345 seats), including a powered bogie in the carriages adjacent to the power cars. They are 200 m (660 ft) long and 2.81 m (9.2 ft) wide. They weigh 385 tonnes with a power output of 6,450 kW under 25 kV.

The sets were built to run at 270 km/h (170 mph) but most were upgraded to 300 km/h (190 mph) during mid-life refurbishment in preparation for the opening of the LGV Méditerranée. The few sets that still have a maximum speed of 270 km/h operate on routes that include a comparatively short distance on LGV, such as to Switzerland via Dijon; SNCF did not consider it financially worthwhile to upgrade their speed for a marginal reduction in journey time.

In December 2019, the trains were phased out from service. In late 2019 and early 2020, TGV 01 (Nicknamed Patrick), which was the very first TGV train, did a farewell service that included all three liveries that were worn during their service.[40]

TGV Atlantique

TGV Atlantique at La Rochelle station.

The 105-strong bi-current Atlantique fleet was built between 1988 and 1992 for the opening of the LGV Atlantique and entry into service began in 1989. They are 237.5 m (779 ft) long and 2.9 m (9.5 ft) wide. They weigh 444 tonnes, and are made up of two power cars and ten carriages with a capacity of 485 seats. They were built with a maximum speed of 300 km/h (190 mph) and 8,800 kW of power under 25 kV. The efficiency of the Atlantique with all seats filled has been calculated at 767 PMPG, though with a typical occupancy of 60% it is about 460 PMPG (a Toyota Prius with three passengers is 144 PMPG).[41]

Modified unit 325 set the world speed record in 1990 on the LGV before its opening. Modifications such as improved aerodynamics, larger wheels and improved braking were made to enable speeds of over 500 km/h (310 mph). The set was reduced to two power cars and three carriages to improve the power-to-weight ratio, weighing 250 tonnes. Three carriages, including the bar carriage in the centre, is the minimum possible configuration because of the articulation.

TGV Réseau

A TGV-Reseau Lacroix with number 549 at the Luxembourg station.

The first Réseau (Network) sets entered service in 1993. Fifty bi-current sets were ordered in 1990, supplemented by 40 tri-current sets in 1992/1993. Ten tri-current sets carry the Thalys livery and are known as Thalys PBA (Paris-Brussels-Amsterdam) sets. As well as using standard French voltages, the tri-current sets can operate under the Netherlands' 1.5 kV and Italian and Belgian 3 kV DC supplies.

They are formed of two power cars (8,800 kW under 25 kV – as TGV Atlantique) and eight carriages, giving a capacity of 377 seats. They have a top speed of 320 km/h. They are 200 m (660 ft) long and are 2.90 m (9.5 ft) wide. The bi-current sets weigh 383 tonnes: owing to axle-load restrictions in Belgium the tri-current sets have a series of modifications, such as the replacement of steel with aluminium and hollow axles, to reduce the weight to under 17 t per axle.

Owing to early complaints of uncomfortable pressure changes when entering tunnels at high speed on the LGV Atlantique, the Réseau sets are now pressure-sealed. They can be coupled to a Duplex set.

TGV Duplex

The TGV Duplex power cars use a more streamlined nose than previous TGVs

The Duplex was built to increase TGV capacity without increasing train length or the number of trains. Each carriage has two levels, with access doors at the lower level taking advantage of low French platforms. A staircase gives access to the upper level, where the gangway between carriages is located. There are 512 seats per set. On busy routes such as Paris-Marseille they are operated in pairs, providing 1,024 seats in two Duplex sets or 800 in a Duplex set plus a Reseau set. Each set has a wheelchair accessible compartment.

After a lengthy development process starting in 1988 (during which they were known as the TGV-2N) the original batch of 30 was built between 1995 and 1998. Further deliveries started in 2000 with the Duplex fleet now totalling 160 units, making it the backbone of the SNCF TGV-fleet. They weigh 380 tonnes and are 200 m (660 ft) long, made up of two power cars and eight carriages. Extensive use of aluminium means that they weigh not much more than the TGV Réseau sets they supplement. The bi-current power cars provide 8,800 kW, and they have a slightly increased speed of 320 km/h (200 mph).

Duplex TGVs are now operating on all of the French high speed lines.[42]

TGV POS

TGV POS have the newer power cars unlike a TGV Réseau

TGV POS (Paris-Ostfrankreich-Süddeutschland or Paris-Eastern France-Southern Germany) are used on the LGV Est.

They consist of two Duplex power cars with eight TGV Réseau-type carriages, with a power output of 9,600 kW and a top speed of 320 km/h (200 mph). Unlike TGV-A, TGV-R and TGV-D, they have asynchronous motors, and isolation of an individual motor is possible in case of failure.

Avelia Euroduplex (TGV 2N2)

TGV 2N2 train in Paris Gare de Lyon station.

The bi-current TGV 2N2 (Avelia Euroduplex) can be regarded as the 3rd generation of Duplex. The series was commissioned from December 2011 for links to Germany and Switzerland (tri-current trains) and to cope with the increased traffic due to the opening of the LGV Rhine-Rhone.

They are numbered from 800, and are limited to 320 km/h (200 mph). ERTMS makes them compatible to allow access to Spain similar to Dasye.

TGV technology outside France

TGV technology has been adopted in a number of other countries:[43]

  • AVE (Alta Velocidad Española), in Spain.[44]
  • Thalys in Belgium, the Netherlands and Germany.
  • Korea Train Express (KTX), in South Korea.[45]
  • British Rail Class 373 operate Eurostar services between the United Kingdom, France, Belgium.
  • Acela Express, a high-speed tilting train built by Alstom and Bombardier for the Northeast Corridor in the United States. The Acela uses several TGV technologies including the motors, electrical/drivetrain system (rectifiers, inverters, regenerative braking technology), truck structure and disc brakes, and crash energy management technology to control structural deformations in accidents.[46] However, the Acela's tilting, non-articulated carriages are derived from the Bombardier's Canadian LRC trains and are custom built for U.S. Federal Railroad Administration crash standards.[46]
  • Avelia Liberty, the replacement for the Acela Express in the United States. Expected to enter service in 2023.
  • The Moroccan government agreed to a €2 billion contract for Alstom to build Al-Boraq, an LGV between Tangier and Casablanca which opened in 2018.[47]
  • Italian open-access high-speed operator Nuovo Trasporto Viaggiatori has signed up with Alstom to purchase 25 AGV 11-car sets (TGV 4th generation, running at 350 km/h (220 mph)) for delivery starting in 2009.[48]

Future TGVs

SNCF and Alstom are investigating new technology that could be used for high-speed transport. The development of TGV trains is being pursued in the form of the Automotrice à grande vitesse (AGV) high-speed multiple unit with motors under each carriage.[49] Investigations are being carried out with the aim of producing trains at the same cost as TGVs with the same safety standards. AGVs of the same length as TGVs could have up to 450 seats. The target speed is 360 kilometres per hour (220 mph). The prototype AGV was unveiled by Alstom on 5 February 2008.[50]

Italian operator NTV is the first customer for the AGV, and became the first open-access high-speed rail operator in Europe, starting operation in 2011.[48]

The design process of the next generation of TGVs began in 2016 when SNCF and Alstom signed an agreement to jointly develop the trainsets, with goals of reducing purchase and operating costs, as well as improved interior design.[51]

TGV M

The design that emerged from the process was named TGV M, and in July 2018 SNCF ordered 100 trainsets with deliveries expected to begin in 2024.[52] They are expected to cost €25 million per 8-car set.

Accidents

In almost three decades of high-speed operation, the TGV has not recorded a single passenger fatality due to accidents while running at high speed on normal passenger service. There have been several accidents, including four derailments at or above 270 km/h (170 mph), but in only one of these—a test run on a new line—did carriages overturn. This is credited in part to the stiffness that the articulated design lends to the train. There have been fatal accidents involving TGVs on lignes classiques, where the trains are exposed to the same dangers as normal trains, such as level crossings. These include one terrorist bombing, which could as well have occurred at high speed as not.

On LGVs

  • 14 December 1992: TGV 920 from Annecy to Paris, operated by set 56, derailed at 270 km/h (170 mph) at Mâcon-Loché TGV station (Saône-et-Loire). A previous emergency stop had caused a wheel flat; the bogie concerned derailed while crossing the points at the entrance to the station. No one on the train was injured, but 25 passengers waiting on the platform for another TGV were slightly injured by ballast that was thrown up from the trackbed.
  • 21 December 1993: TGV 7150 from Valenciennes to Paris, operated by set 511, derailed at 300 km/h (190 mph) at the site of Haute Picardie TGV station, before it was built. Rain had caused a hole to open up under the track; the hole dated from the First World War but had not been detected during construction. The front power car and four carriages derailed but remained aligned with the track. Of the 200 passengers, one was slightly injured.
  • 5 June 2000: Eurostar 9073 from Paris to London, operated by sets 3101/2 owned by the National Railway Company of Belgium, derailed at 250 km/h (155 mph) in the Nord-Pas de Calais region near Croisilles.[53] The transmission assembly on the rear bogie of the front power car failed, with parts falling onto the track. Four bogies out of 24 derailed. Out of 501 passengers, seven were bruised[54] and others treated for shock.[55]
  • 14 November 2015: TGV 2369 was involved in the Eckwersheim derailment, near Strasbourg, while being tested on the then-unopened second phase of the LGV Est. The derailment resulted in 11 deaths among those aboard, while 11 others aboard the train were seriously injured.[56] Excessive speed has been cited as the cause.[57]

On classic lines

  • 31 December 1983: A bomb allegedly planted by the terrorist organisation of Carlos the Jackal exploded on board a TGV from Marseille to Paris; two people were killed.
  • 28 September 1988: TGV 736, operated by set 70 "Melun", collided with a lorry carrying an electric transformer weighing 100 tonnes that had become stuck on a level crossing in Voiron, Isère. The vehicle had not obtained the required crossing permit from the French Direction départementale de l'équipement. The weight of the lorry caused a very violent collision; the train driver and a passenger died, and 25 passengers were slightly injured.
  • 4 January 1991: after a brake failure, TGV 360 ran away from Châtillon depot. The train was directed onto an unoccupied track and collided with the car loading ramp at Paris-Vaugirard station at 60 km/h (37 mph). No one was injured. The leading power car and the first two carriages were severely damaged, and were rebuilt.
  • 25 September 1997: TGV 7119 from Paris to Dunkerque, operated by set 502, collided at 130 km/h (81 mph) with a 70 tonne asphalt paving machine on a level crossing at Bierne, near Dunkerque. The power car spun round and fell down an embankment. The front two carriages left the track and came to a stop in woods beside the track. Seven people were injured.
  • 31 October 2001: TGV 8515 from Paris to Irun derailed at 130 km/h (81 mph) near Dax in southwest France. All ten carriages derailed and the rear power unit fell over. The cause was a broken rail.
  • 30 January 2003: a TGV from Dunkerque to Paris collided at 106 km/h (66 mph) with a heavy goods vehicle stuck on the level crossing at Esquelbecq in northern France. The front power car was severely damaged, but only one bogie derailed. Only the driver was slightly injured.
  • 19 December 2007: a TGV from Paris to Geneva collided at about 100 km/h (62 mph) with a truck on a level crossing near Tossiat in eastern France, near the Swiss border. The driver of the truck died; on the train, one person was seriously injured and 24 were slightly injured.[58]
  • 17 July 2014: a TER train ran into the rear of a TGV at Denguin, Pyrénées-Atlantiques. Forty people were injured.

Following the number of accidents at level crossings, an effort has been made to remove all level crossings on lignes classiques used by TGVs. The ligne classique from Tours to Bordeaux at the end of the LGV Atlantique has no level crossings as a result.

Protests against the TGV

The first environmental protests against the building of an LGV occurred in May 1990 during the planning stages of the LGV Méditerranée. Protesters blocked a railway viaduct to protest against the planned route, arguing that it was unnecessary, and that trains could keep using existing lines to reach Marseille from Lyon.[59]

The Turin–Lyon high-speed railway (Lyon-Chambéry-Turin), which would connect the TGV network to the Italian TAV network, has been the subject of demonstrations in Italy. While most Italian political parties agree on the construction of this line, some inhabitants of the towns where construction would take place oppose it vehemently. The concerns put forward by the protesters centre on storage of dangerous materials mined during tunnel boring, like asbestos and perhaps uranium, in the open air. This health danger could be avoided by using more expensive techniques for handling radioactive materials. A six-month delay in the start of construction has been decided in order to study solutions. In addition to the concerns of the residents, RFB – a ten-year-old national movement – opposes the development of Italy's TAV high-speed rail network as a whole.[60]

General complaints about the noise of TGVs passing near towns and villages have led the SNCF to build acoustic fencing along large sections of LGV to reduce the disturbance to residents, but protests still take place where SNCF has not addressed the issue.[61]

Mail services

In addition to its standard services, mail delivery services were also operated by TGVs.

For many years, a service termed SNCF TGV La Poste transported mail for the French mail service, La Poste. It used windowless but otherwise standard TGV rolling stock, painted in the yellow and blue livery of La Poste. However, the service ceased in June 2015.

Mobile hospital service

During the COVID-19 pandemic, several TGV trains were transformed into mobile hospitals, in order to transport critically ill patients from overwhelmed hospitals in the East of France to hospitals in the west.[62]

Every coach allows for up to 6 patients, allowing for the transport of several dozen patients, attended by a staff of 50 medical workers. Although the train moves at high speed, it accelerates and decelerates smoothly, allowing for medical procedures to be performed during transport.[63]

Rebranding

Since July 2017, TGV services are gradually being rebranded as TGV inOui and Ouigo in preparation for the opening of the French HSR market to competition.[64][65][66]

TGV inOui

TGV inOui is SNCF's premium high-speed rail service. The name inOui was chosen because it sounds like the French word inouï meaning "extraordinary" (or more literally, "unheard of").[67]

Ouigo

Ouigo is SNCF's low-cost high-speed rail service. Trains have a high-density one-class configuration and reduced on-board services. The services traditionally operate from less busy secondary stations, sometimes outside of the city centre.[68] The literal translation of the brand name is "yes go", but the name is also a play on the English homonym, "we go".

See also

  • iDTGV
  • High-speed rail in France
  • TER-GV – TGVs operating on relatively short distances along the LGV Nord
  • TGV track construction
  • TGV world speed record – overview and chronology of speed record attempts
  • V150 (train)
  • AVE
  • YHT
  • Intercity-Express

Notes and references

  1. "Sympozjum CS Transport w CNTK" (in Polish). Archived from the original on 26 June 2018. Retrieved 18 May 2009.
  2. Gruere, Y (1989). "TVM 400-a modular and flexible ATC system". {{cite journal}}: Cite journal requires |journal= (help)
  3. "French Train Hits 357 mph Breaking World Speed Record". foxnews.com. 4 April 2007. Archived from the original on 4 May 2011. Retrieved 11 February 2010.
  4. Le TGV ruler bientôt à 360 km/h, Le Figaro (in French), 17 December 2007.
  5. ,"World Speed Survey: New lines boost rail's high speed performance". Railway Gazette International. 4 September 2007. Retrieved 1 May 2009.
  6. Railway Gazette International 2007 World Speed Survey Tables Archived 31 July 2009 at the Wayback Machine Railway Gazette International (September 2007)
  7. "World Speed Survey 2013: China sprints out in front". Railway Gazette International. Retrieved 2 July 2013.
  8. Gow, David (9 July 2008). "Europe's rail renaissance on track". guardian.co.uk. London. Retrieved 9 February 2010.
  9. Fried, Ben (15 July 2008). "French Trains Turn $1.75B Profit, Leave American Rail in the Dust". Streetsblog New York City. streetsblog.org. Archived from the original on 22 March 2010. Retrieved 9 February 2010.
  10. Fender, Keith (August 2010). "TGV: High Speed Hero". Trains. Kalmbach. 70 (8).
  11. "Early TGV history". TGVWeb. Retrieved 18 April 2008.
  12. Meunier, Jacob. On The Fast Track: French Railway Modernisation and the Origins of the TGV, 1944–1983. pp. 209–210.
  13. Meunier, Jacob. On The Fast Track: French Railway Modernisation and the Origins of the TGV, 1944–1983. p. 7.
  14. "Eurostar's first ever train from London to Amsterdam arrives in style". standard.co.uk. 5 April 2018.
  15. "General definitions of highspeed". UIC. 28 November 2006. Archived from the original on 10 December 2006. Retrieved 3 January 2007.
  16. "Alstom commits itself to the French very high speed rail programme". Alstom. 18 December 2006. Retrieved 4 February 2007.
  17. "French high-speed TGV breaks world conventional rail-speed record". Deutsche Presse-Agentur (reprinted by Monsters and Critics). 14 February 2007. Archived from the original on 18 February 2007. Retrieved 14 February 2007.
  18. Wuhan-Guangzhou line opens at 380 km/h, "Railway Gazette: Single-View". Archived from the original on 12 February 2010. Retrieved 17 May 2010.
  19. Ltd, DVV Media International. "World Speed Survey 2015: China remains the pacesetter". Railway Gazette International. Retrieved 3 December 2018.
  20. "京沪高铁明提速 "复兴号"将在中途超车"和谐号"". Retrieved 3 December 2018.
  21. "Eurostar sets new Guinness World Record with cast and filmmakers of Columbia Pictures' The Da Vinci Code". Eurostar. 17 May 2006. Archived from the original on 14 May 2007. Retrieved 15 February 2007.
  22. "French train breaks speed record". BBC News. 27 May 2001. Retrieved 26 August 2007.
  23. "Bilan de l'année 2008 : Perspectives 2009" (PDF) (in French). SNCF. 12 February 2009. Archived from the original (PDF) on 19 March 2009. Retrieved 7 March 2009.
  24. Pepy, G.: 25 Years of the TGV. Modern Railways 10/2006, pp. 67–74
  25. "TGV tickets to Figueres on sale". Railway Gazette International. 24 November 2010.
  26. "(untitled)". LGV Rhin-Rhone. Archived from the original on 6 March 2012. Retrieved 28 December 2014.
  27. "Extra funds will speed up French investment". Railway Gazette International. 4 February 2009. Retrieved 27 August 2009.
  28. "Funding agreed for LGV Bretagne". Railway Gazette International. 31 July 2008. Retrieved 27 August 2009.
  29. "Three shortlisted for LGV Bretagne". Railway Gazette International. 29 June 2009. Archived from the original on 10 May 2010. Retrieved 27 August 2009.
  30. "Long-term TGV plans". Railway Gazette International. 2 June 2008. Retrieved 27 August 2009.
  31. "Macron Considers Cuts to $34 Billion Infrastructure Plan". Bloomberg.com. 28 June 2017.
  32. "CPDP Projet LGV Poitiers – Limoges". debatpublic.org. Archived from the original on 21 February 2009. Retrieved 1 May 2009.
  33. "France Approves Route for Marseille-Nice TGV". The Transport Politic. July 2009. Retrieved 1 July 2009.
  34. "Bordeaux – Espagne". Railway Gazette International. Retrieved 21 April 2012.
  35. "Normandie upgrading moves ahead". Railway Gazette International. 16 October 2009.
  36. "SNIT makes rail a priority". Railway Gazette International. 30 July 2010.
  37. "Paris to Clermont-Ferrand high speed line plans outlined". Railway Gazette International. 1 June 2011.
  38. http://www.ejrcf.or.jp/jrtr/jrtr17/pdf/f40_technology.pdf
  39. "French Train Sets New World Speed Record". London. Archived from the original on 7 May 2008.
  40. "[SNCF] Farewell tour for Patrick, the first TGV train". Eng News 24h. 7 February 2020. Archived from the original on 15 February 2020. Retrieved 18 May 2020.
  41. Energy Efficiency of different modes of transportation, accessed March 21, 2009 Archived 1 March 2009 at the Wayback Machine
  42. The Electric Railway Society (March 2015). "The History of the French High Speed Rail Network and TGV". Retrieved 19 October 2016.
  43. "French Railway Industry: The paths of excellence" (PDF). DGE/UBIFRANCE. Archived from the original (PDF) on 21 November 2008. Retrieved 1 May 2009.
  44. Takagi, Ryo. "High-speed Railways:The last ten years" (PDF). Japan Railway & Transport Review. Archived from the original (PDF) on 20 June 2009. Retrieved 1 May 2009.
  45. "Korea develops high-speed ambitions: a thorough programme of research and development will soon deliver results for Korea's rail industry in the form of the indigenous KTX II high-speed train. Dr Kihwan Kim of the Korea Railroad Research Institute explains the development of the new train". BNET (International Railway Journal). May 2008. Archived from the original on 16 December 2008. Retrieved 31 December 2008.
  46. "TGVweb Acela Express page". TGVweb. May 2009. Retrieved 10 May 2009.
  47. "Engineers begin work on Moroccan high-speed rail link". BNET (International Railway Journal). May 2008. Retrieved 9 April 2009.
  48. "Alstom awarded Italian AGV contract". Railway Gazette International. 17 January 2008. Archived from the original on 15 April 2012.
  49. "Alstom unveils AGV prototype train". Railway Gazette International. 5 February 2008.
  50. "France unveils super-fast train". BBC News. 5 February 2008. Retrieved 5 February 2008.
  51. Barrow, Keith (7 September 2016). "Next-generation TGV to enter service in 2022".
  52. "SNCF confirms TGV of the Future order". Railway Gazette International. 26 July 2018. Retrieved 2 August 2018.
  53. "TGV Accidents". trainweb.org. 1 May 2009.
  54. Eurostar derails; seven passengers bruised Associated Press (5 June 2000), Retrieved 24 November 2005
  55. "Eurostar train derails in France". BBC News. 5 June 2000. Retrieved 10 May 2009.
  56. "At least 11 killed in rail crash in France". BBC News. Retrieved 20 December 2017.
  57. Bach, Christian; Poivret, Aurélien (14 November 2015). "Une rame d'essai d'un TGV se renverse et prend feu à Eckwersheim, près de Strasbourg : cinq morts". Dernieres Nouvelles D'Alsace (in French).
  58. French TGV train hits lorry and kills one Reuters UK (December 2007)
  59. "High-Speed Protest". New Scientist. 2 June 1990. Archived from the original on 17 December 2007. Retrieved 15 November 2005.
  60. "Environmental Protesters Block French-Italian Railway". planetark.com. 1 November 2005. Archived from the original on 7 October 2007. Retrieved 1 November 2005.
  61. Davey, Tom. "Train à grande vitesse causes distress". www.esemag.com. Archived from the original on 16 January 2010. Retrieved 24 November 2005.
  62. High-speed 'hospital': Train transports France's coronavirus patients France24 26 March 2020
  63. Photos: Hospitalized coronavirus patients are being moved out of Paris by train Quartz 3 April 2020
  64. SNCF to rebrand TGV services as inOui Railway Gazette International 27 May 2017
  65. "SNCF rebrands TGV as "inOui"". International Railway Journal. 30 May 2017. Retrieved 4 August 2021.
  66. "SNCF confirms new InOui name for TGV". businesstraveller.com. 30 May 2017. Retrieved 4 August 2021.{{cite web}}: CS1 maint: url-status (link)
  67. "Why we renamed TGV service 'inOui'". The Connexion. Retrieved 28 May 2020.
  68. "SNCF: les TGV low-cost Ouigo désormais au départ de Paris". BFM BUSINESS (in French). Retrieved 15 February 2020.{{cite web}}: CS1 maint: url-status (link)

Further reading

  • Allen, Geoffrey Freeman (December 1981 – January 1982). "It's a knockout". Rail Enthusiast. EMAP National Publications. pp. 34–37. ISSN 0262-561X. OCLC 49957965.
  • Cooper, Basil (January 1983). "What's in a TGV?". Rail Enthusiast. EMAP National Publications. pp. 18–20. ISSN 0262-561X. OCLC 49957965.
  • Perren, Brian (October 1983). "TGV: the completion of a dream". Rail Enthusiast. EMAP National Publications. pp. 32–40. ISSN 0262-561X. OCLC 49957965.
  • Cinotti, Eric and Tréboul, Jean-Baptiste (2000) Les TGV européens : Eurostar, Thalys, Paris : Presses universitaires de France, ISBN 2-13-050565-1 (in French)
  • Perren, Brian (2000) TGV handbook, 2nd ed., Harrow Weald : Capital Transport, ISBN 1-85414-195-3
  • Malaspina, Jean-Pierre (2005). Des TEE aux TGV [TEE to TGV]. Trains d'Europe (in French). Vol. 1. Paris: La Vie du Rail. ISBN 2915034486.
  • Soulié, Claude and Tricoire, Jean (2002). Le grand livre du TGV, Paris: La Vie du Rail, ISBN 2-915034-01-X (in French)

Media related to TGV at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.