Metropolitan line

The Metropolitan line, colloquially known as the Met, is a London Underground line between Aldgate in the City of London and Amersham and Chesham in Buckinghamshire, with branches to Watford in Hertfordshire and Uxbridge in Hillingdon. Printed in magenta on the tube map, the line is 41.4 miles (66.7 km) in length and serves 34 stations (9 of which are step free). Between Aldgate and Finchley Road, the track is mostly in shallow "cut and cover" tunnels, apart from short sections at Barbican and Farringdon stations. The rest of the line is above ground, with a loading gauge of a similar size to those on main lines. Just under 67 million passenger journeys were made on the line in 2011/12.

Metropolitan line
A northbound S8 Stock Metropolitan line train at Croxley heading to Watford
Overview
Stations34 (9 step free)
Colour on mapMagenta
Websitehttp://tfl.gov.uk
Service
TypeRapid transit
SystemLondon Underground
Depot(s)Neasden
Rolling stockS8 Stock
Ridership66.8 million (2011/12)[1] passenger journeys
History
Opened10 January 1863 (1863-01-10)
Last extension1925
Technical
Line length67 km (42 mi)
Number of tracks2, except
  • 4 Wembley Park–Moor Park
  • 1 Chalfont & Latimer–Chesham
CharacterSub-surface
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification630 V DC fourth rail
Operating speed62 mph (100 km/h) maximum
London Underground
Bakerloo
Central
Circle
District
Hammersmith & City
Jubilee
Metropolitan
Northern
Piccadilly
Victoria
Waterloo & City
Other TfL Modes
DLR
Elizabeth line
London Overground
Tramlink

The line is one of just two Underground lines to cross the Greater London boundary (the other being the Central line). It is the only Underground line with an express service at peak times; the resulting longer distance between stations means trains can achieve the system's highest speeds of over 60 miles per hour (100 km/h) on some sections.

In 1863, the Metropolitan Railway began the world's first underground railway between Paddington and Farringdon with wooden carriages and steam locomotives, but its most important route became the line north-west into the Middlesex countryside, where it stimulated the development of new suburbs. Harrow was reached in 1880, and ultimately the line continued as far as Verney Junction in Buckinghamshire, more than 50 miles (80 km) from Baker Street. From the end of the 19th century, the railway shared tracks with the Great Central Railway out of Marylebone. The central London lines were electrified by 1907 but electric locomotives were exchanged for steam locomotives on trains heading north of Harrow. After the railway was absorbed by the London Passenger Transport Board in 1933, the line was cut back to Aylesbury. Steam trains ran until 1961, when the line was electrified to and services were curtailed at Amersham. The Hammersmith & City line was shown on the tube map as a part of the Metropolitan line until 1990, when it appeared as a separate line. The current S8 Stock trains entered service between 2010 and 2012, replacing the A Stock trains, that served the line since 1961.

The section between Aldgate and Baker Street is shared with the Circle line; between Liverpool Street and Baker Street with the Hammersmith & City line; between Rayners Lane and Uxbridge with the Piccadilly line; and between Harrow-on-the-Hill and Amersham with the London–Aylesbury line operated by Chiltern Railways. Baker Street is the southbound terminus for some trains not continuing to Aldgate. Most of the route has two tracks, except for the single-track Chesham branch and a four-track section between Wembley Park and Moor Park that allows fast and semi-fast services to overtake "all stations" trains. There are four tracks between Wembley Park and Finchley Road, but only the outer ones are used by the Metropolitan line's non-stop trains: the inner pair was transferred to the Bakerloo line in 1939 (becoming the Jubilee line in 1979) with services calling at all stations. The disused Metropolitan line platforms at Willesden Green and Neasden are still in place despite Metropolitan line services having been withdrawn in 1940.

History

Metropolitan Railway

Construction of the Metropolitan line near King's Cross station (1861)

The Metropolitan Railway, also known as the Met, was a passenger and goods railway that served London from 1863 to 1933, its main line heading north-west from the City to what were to become the Middlesex suburbs. Its first line connected the mainline railway termini at Paddington, Euston and King's Cross to the City, built beneath the New Road using the cut-and-cover method between Paddington and King's Cross, and in tunnel and cuttings beside Farringdon Road from King's Cross to near Smithfield. The world's first underground railway, it opened on 10 January 1863 with gas-lit wooden carriages hauled by steam locomotives. The line operated at a frequency of three trains per hour, rising to four trains per hour during the peak periods.[2][3][4] In the 1871 plans for an underground railway in Paris, it was called the Métropolitain.[5]

The railway was soon extended from both ends and northwards via a branch from Baker Street. It reached Hammersmith in 1864 and Richmond in 1877; it completed the Inner Circle in 1884,[6] but the most important route became the line west and north-west into the Middlesex countryside, where it stimulated the development of new suburbs. Harrow was reached in 1880, and ultimately, as far as Verney Junction in Buckinghamshire, more than 50 miles (80 kilometres) from Baker Street. From the end of the 19th century, the railway shared tracks with the Great Central Railway route out of Marylebone.[7]

Electric traction was introduced in 1905 with electric multiple units operating between Uxbridge, Harrow-on-the-Hill and Baker Street. To remove steam and smoke from the tunnels in central London, the railway purchased electric locomotives, exchanged for steam locomotives at Harrow from 1908.[8] In 1910, a seventeen-minute silent film was made showing large portions of the journey from Baker Street to Aylesbury and Uxbridge, seen from the cab of a train.[9]

Unlike other railways in the London area, the Met developed land for housing, thus benefitting from the increase in the value of its land caused by the building of the railway. After World War I it promoted its housing estates near the railway with the "Metro-land" brand.

To improve services, more powerful electric and steam locomotives were purchased in the 1920s. A short branch opened from Rickmansworth to Watford in 1925. After World War I, the 4-mile (6.4 km) Stanmore branch was built from Wembley Park.[10]

London Transport

Electric Locomotive No.12 "Sarah Siddons" seen at a heritage event at Amersham in 2008
An up train passing Neasden Depot in 1959
A stock at Amersham

On 1 July 1933, the Metropolitan was amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board, and a period of rationalisation followed.

While the Metropolitan was run as an outer suburban route with steam-hauled trains and goods services, the LPTB wished to focus on electrified trains and suburban traffic. Goods services were passed to the London and North Eastern Railway, which also took over the role of providing steam locomotives for trains beyond the end of electrification at Rickmansworth. All services north-west of Aylesbury were withdrawn by 1936[11] though services returned to Quainton Road between 1943 and 1948.[12]

The 1930s was a period of rapid growth for the north-western suburbs of London, and LPTB developed ambitious plans to simplify the Metropolitan line and expand capacity. Several stations on the Uxbridge branch were rebuilt, replacing temporary wooden buildings with modernist designs and giving Uxbridge station a new site in the town centre. A major bottleneck in the line, the double-track tunnel from Baker Street to Finchley Road, was bypassed by boring two tube tunnels underneath the Metropolitan tunnels, transferring slow services and the Stanmore branch to the Bakerloo line.[13] (This route was transferred to the Jubilee line in 1979.)[14] In 1936, the line was extended east from Whitechapel to Barking along the tracks of the District line.[15] London Transport inherited incompatible electric multiple units from the railway, including the 1927–33 multiple-unit compartment stock used on routes to Watford and Rickmansworth, and these were refurbished to form a uniform fleet and designated London Underground T Stock.[16] In the 1950s, F Stock trains, with sliding doors under the control of the guard, were transferred from the District line; these mainly worked the semi-fast Harrow and Uxbridge services.[17]

A major rebuilding of the main line from Wembley Park to Amersham was planned in the 1930s but delayed by the war. The line from Wembley to Harrow was rebuilt immediately after the war and the project was completed from 1956–1962, on a more modest scale than originally planned. Until 1961, passenger trains continued to be attached to a steam locomotive at Rickmansworth to run to Aylesbury. The rebuilding electrified the line from Rickmansworth to Amersham, transferring all Aylesbury services to British Railways. A pair of fast lines was added from Harrow to north of Moor Park by 1962, allowing outer-suburban trains to run fast to Moor Park.[18] Aluminium A stock, originally unpainted, replaced the T stock and locomotive-hauled trains. More A Stock trains were built in 1962–63 to replace the trains on the Uxbridge service, giving the main line a single train type for all services. A Stock was four-car units that could operate as four- or eight-car trains;[19] normally operated as eight cars, a four-car unit operated the Chesham shuttle.[20] One person operation of the trains was proposed in 1972, but due to conflict with the trade unions was not introduced on the line until 1986.[21]

A separate identity

A Stock vehicles at Rayners Lane in their original unpainted livery

Although the East London line had been an isolated shuttle since 1939,[15] it was shown on London Underground maps as part of the Metropolitan line until 1968.[22] In 1970, it was shown with a thin white line in the middle and labelled the "East London section".[23] By the 1985 map, it had become the "East London Line", remaining the same colour as the Metropolitan line with a white line in the middle,[24] changed to orange by the 1990 map.[25] In 1990, the Hammersmith & City line became a separate line from Hammersmith to Whitechapel (Barking during the peak), the Metropolitan line being from Aldgate to Baker Street and northwards to Amersham with branches to Chesham, Uxbridge and Watford.[15][25]

In 2003, the infrastructure was partly privatised in a public–private partnership managed by the Metronet consortium. Metronet entered administration in 2007 and Transport for London took over responsibilities.[26]

On 12 December 2010, the service to Amersham was reduced from four trains per hour to two, and a direct service between Chesham and central London was introduced, replacing the 4-car Chesham to Chalfont & Latimer shuttle.[27] The final passenger services operated by the A Stock ran on 26 September 2012,[28] followed by a ticketed public railtour on 29 September.[29]

Route

The route of the Metropolitan line through the Greater London Boroughs and the English Counties of Hertfordshire and Buckinghamshire. More details of the route between Baker Street and Aldgate are shown on Circle line: Map
Metropolitan line
Dates relate to Metropolitan Railway operations
Circle line via Tower Hill
Aldgate
Hammersmith & City line to Barking
Joint section with Circle and H&C lines
Liverpool Street
Moorgate
Barbican
Farringdon
King's Cross St Pancras
Euston Square
Great Portland Street
Jubilee line to Stratford
Circle and H&C lines to Hammersmith
Baker Street
Non-stop section
Regent's Canal
Lord's
1868–1939
St John's Wood ()
Marlborough Road
1868–1939
Watford DC line
Swiss Cottage ()
1868–1940
London–Aylesbury line
to Marylebone
Finchley Road
Non-stop section
West Hampstead ( )
1879–1940
North London Line
Kilburn ()
1879–1940
Willesden Green ()
Dollis Hill ()
1909–1940
Dudding Hill Line
Neasden ()
Chiltern Main Line
River Brent
Wembley Park
former Stanmore branch
 now Jubilee line
Kingsbury
1932–1939
Queensbury
1934–1939
Canons Park
1932–1939
Stanmore
1932–1939
Preston Road (original site)
1908–1932
Preston Road
West Coast
Main Line
Bakerloo and
Watford DC lines
Northwick Park
Harrow-on-the-Hill
West Harrow
Piccadilly line via Acton Town
Rayners Lane
Eastcote
Ruislip Manor
Ruislip
Ickenham
Hillingdon (original site)
1923–1992
Hillingdon
Uxbridge depot
Uxbridge (original site)
1904–1938
Uxbridge
North Harrow
Pinner
Northwood Hills
Northwood
Moor Park
River Colne
River Gade
Grand Junction Canal
Watford curve
Croxley
proposed Croxley Rail Link
Cassiobridge
Watford Vicarage Road
West Coast
Main Line
Watford
DC line
Watford High Street
Watford Junction
Watford
River Chess
Rickmansworth
Chorleywood
Chalfont & Latimer
Chesham
Amersham
to Verney Junction & Brill branch
Great Missenden
1892–1961
Wendover
1892–1961
Stoke Mandeville
1892–1961
Aylesbury (original site)
1892–1893
Aylesbury
1894–1961
River Thame
Aylesbury Vale Parkway
Waddesdon
1897–1936
Quainton Road
1896–1936
1943–1948
Quainton Road (original site)
1891–1896
former Great Central Railway route
Granborough Road
1891–1936
Winslow Road
1891–1936
former Varsity Line to Bletchley
Verney Junction
1891–1936
former Varsity Line to Oxford
Waddesdon Road
1899–1935
Westcott
1899–1935
Wotton
1899–1935
Wood Siding
1899–1935
Brill
1899–1935

The Metropolitan line is 42 miles (67 km) long and serves 34 stations.[30] It is electrified with a four-rail DC system: a central conductor rail is energised at –250 V and a rail outside the running rail at +500 V, giving a potential difference of 750 V, except for the section from Uxbridge to Finchley Road (via Harrow-on-the-Hill) which is energised at –210 V and +420 V respectively (630 V potential difference) to maintain compatibility with 1973 Stock and 1996 Stock that runs in those areas.[31][32] The first 6 miles (9.7 km) from Aldgate are below ground,[33] shared with the Circle and Hammersmith & City lines to Baker Street, where the line diverges, remaining in tunnel until Finchley Road.[34] Metropolitan line trains essentially skips two stops between Baker Street and Finchley Road, with the Jubilee line serving the intermediate stations on an adjacent parallel line. The Jubilee line then joins the Metropolitan line in the same right-of-way at Finchley Road. Metropolitan line trains then run express from Finchley Road to Wembley Park, with the Jubilee line serving the intermediate stations. At Wembley Park the Jubilee line diverges to the Stanmore branch at a grade-separated junction. From just after Finchley Road, these four tracks run parallel with the Network Rail Chiltern Main Line from Marylebone.[34]

Between Wembley Park and Harrow-on-the-Hill, the Metropolitan is four-track, with fast and slow lines paired by direction, paralleling the two-track un-electrified Chiltern Main Line. The slow lines are between the fast lines, and the two intermediate stations have island platforms.[34] Harrow-on-the-Hill has platforms on all six lines.[34] The central slow lines diverge here at a grade-separated junction to become the 7.5 miles (12.1 km) Uxbridge branch. After West Harrow, at Rayners Lane the line is joined by the Piccadilly line, which shares the tracks to Uxbridge; a turnback siding allows some Piccadilly line services to terminate at Rayners Lane.[34][35]

On the main line between Harrow-on-the-Hill and Moor Park, the line is four-track, paired by use. The western fast tracks are shared with Chiltern line services from Marylebone; the eastern slow tracks have platforms at the intermediate stations.

North of Moor Park, the Watford branch diverges from the slow lines.[34] This double-track branch has stations at Croxley and Watford.[34][36] The Watford branch has a triangle junction with the main line, with a north-facing curve between Croxley and Rickmansworth. This route, Watford North Curve, is used daily for a few services and empty stock movements.[37]

From the Watford triangle to Amersham, the line has two tracks. At Chalfont & Latimer, the 3.89 miles (6.26 km) single-track Chesham branch diverges, running parallel to the main line for a distance.[30][34] The Metropolitan line ends at Amersham, where there are turnback sidings just beyond the platforms. The route continues to Aylesbury with Chiltern Railways trains only.[38]

The fast (non-stopping) lines between Wembley Park and Harrow on the Hill are signalled with LUL signalling, but using four-aspect Network Rail signal heads.[39] The upper two lights are a two-aspect stop signal displaying either a green or red aspect, the lower two lights a repeater signal for the next stop signal ahead showing a green or yellow aspect, or no aspect when the stop signal shows a red aspect. Thus they are effectively four-light three-aspect signals with green/red/green/yellow lights from the top, danger being a single red light, caution the top green light over a yellow light, and clear two green lights.[39]

The Metropolitan line's suburban rail character opposed to other London Underground lines is also shown by the long distances between stops. Eight of the top 10 furthest apart stations on the Underground are on the Metropolitan line. The section between Chalfont & Latimer and Chesham is the longest at 3.9 miles (6.3 km),[40] whilst the Finchley Road to Wembley Park section is the second longest, and Rickmansworth to Chorleywood the fourth longest overall.

Services

The Metropolitan line is the only London Underground line to operate non-stop services through some of its stations, although since 11 December 2011 these only run on weekdays during peak times (southbound in the morning peak, northbound in the evening peak).[41] Depending on the stopping pattern, services are advertised as either all-stations, semi-fast or fast on platform information boards and on-train announcements. The stopping pattern of each type of service is as follows:

  • All-stations services call at all stations en route[41]
  • Semi-fast services run non-stop between Wembley Park and Harrow-on-the-Hill, and call at all other stations en route[41]
  • Fast services run non-stop between Wembley Park and Harrow-on-the-Hill and between Harrow-on-the-Hill and Moor Park[41]
  • In the southbound direction, fast and semi-fast trains do not call at Wembley Park, and instead run non-stop from Harrow-on-the-Hill to Finchley Road[41]

Owing to the track layout, fast services can only run to/from Amersham or Chesham. The Uxbridge branch diverges from the rest of the line before the "fast" section, while the Watford branch is not directly connected with the fast line at Moor Park.[42]

No Metropolitan line trains call at any intermediate stations between Finchley Road and Wembley Park. These stations are served by the Jubilee line which runs parallel to the Metropolitan line along this section.[41]

Frequency

During the off-peak the service pattern on the line, in trains per hour (tph), is as follows:[41]

  • 8tph Aldgate - Uxbridge (all stations);
  • 4tph Baker Street - Watford (all stations);
  • 2tph Aldgate - Amersham (all stations);
  • 2tph Aldgate - Chesham (all stations).

These services combine to give a total frequency of 16tph between Baker Street and Harrow-on-the-Hill. Of these, 12tph run between Aldgate and Baker Street which, together with the 6tph frequencies on both the Circle and Hammersmith & City lines,[43] gives a total of 24 trains every hour on the central-London section between Liverpool Street and Baker Street.

In the morning peak, the southbound service pattern is strengthened to the following:[41]

  • 4tph Uxbridge - Baker Street (all stations);
  • 6tph Uxbridge - Aldgate (4 all stations, 2 semi-fast);
  • 6tph Watford - Baker Street (3 all stations, 3 semi-fast);
  • 2tph Watford - Aldgate (1 all stations, 1 semi-fast);
  • 4tph Amersham - Aldgate (2 semi-fast, 2 fast)
  • 2tph Chesham - Aldgate (fast).

The northbound frequencies in the morning peak are similar on each route, except all trains run as all-stations services.

Similarly, in the evening peak, the northbound service pattern is strengthened to the following:[41]

  • 3tph Baker Street - Uxbridge (all stations);
  • 7tph Aldgate - Uxbridge (all stations);
  • 4tph Baker Street - Watford (2 all stations, 2 semi-fast)
  • 4tph Aldgate - Watford (semi-fast);
  • 2tph Baker Street - Amersham (semi-fast);
  • 2tph Aldgate - Amersham (fast);
  • 2tph Aldgate - Chesham (fast).

The southbound frequencies in the evening peak are similar on each route, except all trains run as all-stations services.

Rolling stock

S8 Stock trains featuring partial transverse seating, reminiscent of the older A Stock trains

Since 20 September 2012, all services have been provided by eight-car S Stock trains[44] introduced in July 2010 to replace the 1960s A Stock.[45] Part of Bombardier's Movia family, they have air-conditioning, feasible because the sub-surface tunnels, unlike tube tunnels, are able to disperse the exhausted hot air.[46][47] They have regenerative brakes, returning around 20% of their energy to the network and thus reducing energy consumption.[48] With fewer seats than the older A Stock – 306 compared with 448 – they can accommodate 697 standing passengers, compared with 597 in A Stock,[note 1] and have dedicated space for wheelchairs.[49] They have a top speed of 62 miles per hour (100 km/h),[46] being the only London Underground stock to travel at that speed, doing so on the long-distance sections north of Finchley Road.

There are 58 S8 Stock trains in operation, as well as one eight-car S7 Stock also called 'S7+1' – which retains the all-longitudinal seating of the normal seven-car S7 Stock that is operated on London Underground's other sub-surface lines.

It is planned to increase the traction voltage from the present nominal 630 V to 750 V to give better performance and allow the trains to return more energy to the network through their regenerative brakes.[50]

Depot

The line is served by a depot at Neasden.[note 2] The Metropolitan Railway opened a carriage works at Neasden in 1882 and the following year the locomotive works were moved from Edgware Road.[51] In 1904–05, the depot was refitted to take the new electric multiple units[52] and accommodation enlarged in 1932–3.[53] After the amalgamation into the LTPB, the depot was rebuilt from 1936 to 1939. The depot was upgraded in 2010–11 to enable it to maintain S Stock trains.[54] Trains are also stored overnight at Uxbridge, Watford, Rickmansworth and Wembley Park.[55]

Steam on the Met

LMS Black 5 44932 at Amersham in 1992

In 1989, to celebrate the 100th anniversary of the opening of the Metropolitan to Chesham, the first Steam on the Met event took place with London Underground running two weekends of steam specials between Chesham and Watford.[56] The event was a success and so in 1990 London Underground ran steam between Harrow and Amersham. In 1992, to celebrate 100 years of the Met at Amersham, the event was extended to five days at the end of May. From 1994, diesel locomotive 20227, owned by the Class 20 Locomotive Society, and electric locomotive Sarah Siddons provided air braking for the coaches. In 1995, trains ran between Amersham and Watford.[57]

Engines used included BR standard class 5 and BR standard class 4 and GWR Pannier tanks. There was other rolling stock on static display at Rickmansworth sidings. The steam trains ran between normal Metropolitan and main line services. Due to the imminent partial privatisation of LUL and the stock condition, the last steam excursion took place in 2000. In 2008, special trains ran on using Metropolitan Railway electric locomotive "Sarah Siddons" and diesel Class 20 locomotives.[58]

To celebrate the 150th anniversary of the opening of the Metropolitan, special services ran in January 2013 using a restored 1892 "Jubilee" carriage, 1898–1900 Ashbury and Cravens bogie carriages, Metropolitan Railway milk van No.3, Metropolitan Railway E Class steam locomotive No. 1 and electric locomotive Sarah Siddons.[59] Further events were planned for 2013 involving Locomotive No. 1, Sarah Siddons and the Jubilee carriage, including a Steam back on the Met scheduled for May.[60]

Four Lines Modernisation (4LM)

It was planned that a new signalling system would be used first on the line north of Baker Street from the end of 2016,[61] but signalling contractor Bombardier was released from its contract by agreement in December 2013 amid heavy criticism of the procurement process[62] and London Underground subsequently awarded the contract for the project to Thales in August 2015.[63]

With the introduction of S8 Stock, the track, electrical supply, and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the line by 27 per cent by the end of 2023.[61][64][65] A single control room for the sub-surface railway opened at Hammersmith on 6 May 2018, and communications-based train control (CBTC) provided by Thales will progressively replace 'fixed block' signalling equipment dating back the 1940s.[61][66] Trackside signals with automatic train protection (ATP) will remain on the line north of Harrow-on-the-Hill, shared with Chiltern Railways DMUs.[61]

The rollout of CBTC has been split into sections, each known as a signal migration area (SMA), and are located on the line as follows:[67]

Metropolitan line signal migration areas
SMA[lower-roman 1] from to status date
2 Finchley Road Euston Square completed September 2019
3 Euston Square Aldgate completed July 2020
8 Finchley Road Preston Road planned March 2022 (TBC)
9 Preston Road
  • West Harrow
  • Moor Park
planned September 2022 (TBC)
13 Moor Park
  • Watford
  • Amersham
  • Chesham
planned February 2023 (TBC)
14 West Harrow Uxbridge deferred April 2023 (TBC)
  1. SMAs 0.5, 1, 4–7 and 10–12 concern parts of the District, Circle, and Hammersmith & City lines.

List of stations

Open stations

In order from east to west.

StationImageOpened[15]BranchAdditional informationPosition
Aldgate18 November 1876CircleTerminus51°30′50″N 000°04′34″W
Liverpool Street 12 July 1875CircleOriginally Bishopsgate, renamed 1 November 1909. Connects with Central and Hammersmith & City lines and London Overground, Elizabeth line and National rail services from Liverpool Street mainline station. Elizabeth Line services via Stratford and Shenfield from platforms 15, 16 and 17.51°31′07″N 000°04′53″W. .
Moorgate 23 December 1865CircleOriginally Moorgate Street, renamed 24 October 1924. Connects with Northern line and National rail services from the main line Northern City Line. The Elizabeth line is interchangeable via the Northern Line platforms from Liverpool Street Station due to the long platforms.51°31′07″N 000°05′19″W.
Barbican23 December 1865CircleOriginally Aldersgate Street, renamed Aldersgate 1910, Aldersgate and Barbican 1923, Barbican 196851°31′13″N 000°05′52″W
Farringdon 10 January 1863CircleResited 22 December 1865. Interchangeable with National Rail and Elizabeth line services. Originally Farringdon Street, renamed Farringdon & High Holborn 1922, Farringdon 193651°31′12″N 000°06′19″W
King's Cross St Pancras 10 January 1863CircleStation resited 1941. Originally King's Cross, renamed King's Cross & St Pancras 1925, King's Cross St Pancras 1933.51°31′49″N 000°07′27″W
Euston Square10 January 1863CircleOriginally Gower Street, renamed 190951°31′33″N 000°08′09″W
Great Portland Street10 January 1863CircleOriginally Portland Road, renamed Great Portland Street 1917, Great Portland Street & Regent's Park 1923, Great Portland Street 193351°31′26″N 000°08′38″W
Baker Street10 January 1863Main
line
Metropolitan line platforms date from 186851°31′19″N 000°09′25″W
Finchley Road30 June 1879Main
line
Finchley Road (South Hampstead) from 1885 to 191451°32′50″N 000°10′49″W
Wembley Park 12 May 1894Main
line
51°33′49″N 000°16′46″W
Preston Road21 May 1908Main
line
Resited 1931/251°34′20″N 000°17′43″W
Northwick Park28 June 1923Main
line
Originally Northwick Park & Kenton, renamed 193751°34′43″N 000°19′07″W
Harrow-on-the-Hill 2 August 1880Main
line
Originally Harrow, renamed 189451°34′46″N 000°20′13″W
West Harrow17 November 1913Uxbridge51°34′47″N 000°21′12″W
Rayners Lane26 May 1906Uxbridge51°34′31″N 000°22′17″W
Eastcote26 May 1906Uxbridge51°34′36″N 000°23′49″W
Ruislip Manor5 August 1912Uxbridge51°34′24″N 000°24′45″W
Ruislip4 July 1904Uxbridge51°34′17″N 000°25′16″W
Ickenham25 September 1905UxbridgeOriginally Ickenham Halte, rebuilt 1970/1 51°33′43″N 000°26′31″W
Hillingdon 10 December 1923UxbridgeRenamed Hillingdon (Swakeleys) 1934, suffix gradually dropped. Resited and rebuilt 199251°33′14″N 000°27′00″W
Uxbridge 4 July 1904UxbridgeStation resited from Belmont Road in 1938
Terminus
51°32′45″N 000°28′42″W
North Harrow22 March 1915Main
line
51°35′06″N 000°21′45″W
Pinner 25 May 1885Main
line
51°35′34″N 000°22′50″W
Northwood Hills13 November 1933Main
line
51°36′02″N 000°24′33″W
Northwood1 September 1887Main
line
The last station within Greater London51°36′39″N 000°25′28″W
Moor Park9 May 1910Main
line
Originally Sandy Lodge, renamed Moor Park & Sandy Lodge 18 October 1923, Moor Park 25 September 195051°37′47″N 000°25′58″W
Croxley2 November 1925WatfordOriginally Croxley Green, renamed 23 May 194951°38′51″N 000°26′29″W
Watford2 November 1925WatfordTerminus51°39′27″N 000°25′03″W
Rickmansworth 1 September 1887Main
line
51°38′25″N 000°28′24″W
Chorleywood 8 July 1889Main
line
The last station within Hertfordshire. Originally Chorley Wood, renamed Chorley Wood & Chenies 1 November 1915, Chorley Wood 1934, Chorleywood 196451°39′15″N 000°31′06″W
Chalfont & Latimer 8 July 1889Main
line
Originally Chalfont Road, renamed 1 November 191551°40′04″N 000°33′40″W
Chesham 8 July 1889CheshamTerminus51°42′19″N 000°36′41″W
Amersham 1 September 1892AmershamRenamed Amersham & Chesham Bois 12 March 1922, Amersham 1937
Terminus
51°40′27″N 000°36′27″W

Former stations

LT loco L92 at Croxley tip in 1969

The Brill Tramway with stations Waddesdon Road, Westcott, Wotton, Church Siding, Wood Siding and Brill closed in 1935. In the following year, the line was cut back to Aylesbury, with Waddesdon station and Granborough Road, Winslow Road stations on the line to Verney Junction closing.[15] Initially Verney Junction and Quainton Road remained open, with main line services provided by the LNER.

In 1939, the Stanmore branch and the stopping service between Finchley Road and Wembley Park were transferred to the Bakerloo line. On the St John's Wood section, Lord's and Marlborough Road stations were replaced by St John's Wood, and Swiss Cottage replaced the Metropolitan line station.[13][15] The Bakerloo line service to Stanmore was transferred to the Jubilee line when that line opened in 1979.[14]

In 1961, when steam locomotives were replaced and the line was electrified to Amersham, the Underground service to Great Missenden, Wendover, Stoke Mandeville and Aylesbury was withdrawn.[15]

Goods-only branches

Between Moor Park and Croxley, a short branch ran south-east off the Watford branch, near its junction with the main line, to Croxley Tip, a rubbish dump beside the Grand Union Canal. This site began as a gravel loading point before becoming used by the railway to dump waste such as old ballast and waste from Neasden power station. This route, never used for passenger traffic, continued to be used by London Transport's small fleet of steam engines until 1971, when diesels replaced them. The branch closed some time after this, although a section of the spur line remained visible from a passing train.

A second short branch line, known as the Halton Railway, served RAF Halton near Wendover, across the Wendover Arm of the Grand Union Canal. The line was built during the First World War and closed in 1963.[68] The trackbed is now a footpath.[69]

Although not operated by Metropolitan passenger services, the line from South Harrow to Rayners Lane was built by the Metropolitan railway as the District Railway was in financial difficulties at the time. This included a short branch, part of which is still visible, on a viaduct to a gas works. Other minor freight connections along the line once included connections to the Midland main line at Finchley Road.

A single-track spur from a small yard between Ickenham and Ruislip stations connects to Ruislip Depot of the Central line. This line is used for engineering and empty stock transfers, although occasional plans suggest extending the Central line into Uxbridge by upgrading the connection. It was built in 1973.

Metropolitan line extension

Diagram of the Croxley Rail Link

Also known as the Croxley Rail Link, an extension to the Metropolitan line was to reroute the Watford branch from the current terminus using the disused Croxley Green branch line to Watford Junction. Funding was agreed in December 2011[70] and the necessary permission was granted by the UK Government in July 2013.[71][36][72] Due to a funding shortfall, the project was cancelled in 2016.[72]

References

Footnotes

  1. Based on 4 passengers per square metre.
  2. Position: 51°33′28″N 000°15′31″W

Notes

  1. "Performance: LU Performance Data Almanac". Transport for London. 2011–2012. Archived from the original on 14 February 2013. Retrieved 17 January 2013.
  2. Green 1987, pp. 3–5.
  3. Edwards, Dennis; Pigram, Ron (1988). The Golden Years of the Metropolitan Railway and the Metro-land Dream. Bloomsbury. p. 32. ISBN 1-870630-11-4.
  4. Pipe, Victoria; Marshall, Geoff (2018). The Railway Adventures: Places, Trains, People and Stations. Tewkesbury: September Publishing. p. 82. ISBN 9781910463871.
  5. Bobrick, Benson (1981). Labyrinths of Iron. Newsweek books. p. 142. ISBN 9780882252995.
  6. Green 1987, pp. 7–10.
  7. Green 1987, pp. 11–14.
  8. Green 1987, pp. 24–26.
  9. "A Trip on the Metropolitan Railway (1910)". Screen Online. British Film Institute. Retrieved 25 January 2016.
  10. Green 1987, pp. 43–45.
  11. Green 1987, pp. 46–48.
  12. Horne 2003, p. 69.
  13. Green 1987, p. 51.
  14. Green 1987, p. 63.
  15. Rose, Douglas (December 2007) [1980]. The London Underground: A Diagrammatic History (8th ed.). London: Capital Transport. ISBN 978-1-85414-315-0.
  16. Bruce 1983, pp. 72–74.
  17. Bruce 1983, pp. 78–81.
  18. Green 1987, p. 55.
  19. Bruce 1983, p. 110.
  20. Bruce 1983, p. 113.
  21. Croome, Desmond F.; Jackson, Alan Arthur (1993). Rails Through the Clay: A History of London's Tube Railways. Capital Transport. p. 468. ISBN 978-1-85414-151-4.
  22. "London Underground map 1968". The London Tube map archive. Retrieved 21 November 2012.
  23. "London Underground map 1970". The London Tube map archive. Retrieved 21 November 2012.
  24. "London Underground map 1985". The London Tube map archive. Retrieved 21 November 2012.
  25. "London Underground map 1990". The London Tube map archive. Retrieved 21 November 2012.
  26. "PPP Performance Report" (PDF). Transport for London. 2009–2010. pp. 7–8. Archived from the original (PDF) on 26 April 2012. Retrieved 7 March 2012.
  27. "Chesham trains to run direct into central London" (Press release). Transport for London. 7 December 2010. Archived from the original on 17 April 2012. Retrieved 21 March 2018.
  28. "A Stock last day on the Metropolitan Line". Railways Today. 26 September 2012. Archived from the original on 19 January 2016. Retrieved 2 November 2012.
  29. "Last A stock rail tour". London Transport Museum. Retrieved 27 September 2012.
  30. "Key facts". Transport for London. Archived from the original on 29 May 2007. Retrieved 22 November 2012.
  31. Richard Griffin (3 September 2019). "SQUAREWHEELS.org.uk – S stock". www.squarewheels.org.uk. Retrieved 11 May 2020.
  32. Martin, Andrew (2012). Underground, Overground: A Passenger's History of the Tube. London: Profile Books. pp. 137–138. ISBN 978-1-84765-807-4. Retrieved 7 December 2012.
  33. "Metropolitan line facts". Transport for London. Retrieved 23 November 2012.
  34. "Detailed London Transport Map". cartometro.com. Retrieved 23 November 2012.
  35. Horne 2003, p. x.
  36. "Croxley Rail Link". Transport for London. 2012. Archived from the original on 25 March 2013. Retrieved 23 November 2012.
  37. Louis, Nathan (8 August 2021). "The 'secret' Met line track near Watford known as 'North Curve'". Watford Observer. Retrieved 15 September 2021.
  38. "Amersham/Chesham tube guide" (PDF). Transport for London. Retrieved 9 December 2013.
  39. Kichenside, G.M.; Williams, Alan. British Railway Signalling. p. 72.
  40. "Facts & figures". tfl.gov.uk. Transport for London. Retrieved 14 July 2017.
  41. "Working timetable 340 - Metropolitan line" (PDF). Archived from the original (PDF) on 21 May 2017. Retrieved 5 May 2018.
  42. Detailed London transport map - Carto Metro
  43. Working timetable 35 - Circle and Hammersmith & City lines
  44. "Commissioner's Report" (PDF). Board Meeting Documents. paragraph 3.2: Transport for London. 20 September 2012. Archived (PDF) from the original on 26 August 2020. Retrieved 27 September 2012.{{cite web}}: CS1 maint: location (link)
  45. Waboso, David (December 2010). "Transforming the tube". Modern Railways. London. pp. 42–45.
  46. "Movia metro – London, United Kingdom". Bombardier. Retrieved 27 January 2011.
  47. "'S' stock making its mark". Modern Railways. London. December 2010. p. 46.
  48. "Transforming the Tube" (PDF). Transport for London. July 2008. Archived from the original (PDF) on 5 June 2011. Retrieved 28 May 2009.
  49. "S stock". Transport for London. Archived from the original on 29 December 2013. Retrieved 10 January 2012. (Note: The table erroneously says "Length per car", instead of "Length per train".)
  50. Jackson 1986, pp. 82–82.
  51. Jackson 1986, p. 176.
  52. Jackson 1986, p. 281.
  53. "Works begin to build new maintenance facility at Neasden Depot". Transport for London. 28 September 2010. Retrieved 11 February 2011.
  54. "London Underground Key Facts". Transport for London. Archived from the original on 29 May 2007. Retrieved 21 May 2008.
  55. metroland.org.uk. "Steam on the Met".
  56. King, Geoffrey. "Steam on the Met".
  57. "Not quite Steam on the Met". peat.me.uk. 30 August 2008. Retrieved 24 November 2011.
  58. "Past Events – tube 150". London Transport Museum. Retrieved 4 February 2013.
  59. "Vehicles on the Move" (Press release). London Transport Museum. Retrieved 4 February 2013.
  60. Abbott, James (January 2013). "Sub-surface renewal". Modern Railways. pp. 38–41.
  61. "London Underground and Bombardier abandon Tube signalling contract". International Railway Journal. 3 January 2014. Retrieved 2 June 2020.
  62. "London Underground resignalling reaches milestone". International Railway Journal. 13 October 2017. Retrieved 2 June 2020.
  63. "Our Upgrade Plan" (PDF). Transport for London. February 2011. Archived from the original (PDF) on 17 August 2012. Retrieved 7 December 2012.
  64. "Four Lines Modernisation". Transport for London. Retrieved 2 June 2020.
  65. Stewart, Rob (January 2013). "Cityflo 650 to control the SSR". Modern Railways. pp. 42–43.
  66. "Underground News". London Underground Railway Society. 706: 572. October 2020.
  67. "Halton Railway". RAF Halton. MOD. Retrieved 6 September 2015.
  68. The Wendover Arm: Linear and Circular Walks (PDF). Aylesbury: Buckinghamshire County Council. Retrieved 6 September 2015.
  69. "Transport schemes given £854m in government funding". BBC News. 14 December 2011. Retrieved 14 December 2011.
  70. "Watford Metropolitan line Tube extension gets go-ahead". BBC News. 24 July 2013. Retrieved 24 July 2013.
  71. "Metropolitan line Extension". Transport for London. 2017. Archived from the original on 17 July 2017.

Sources

  • Bruce, J Graeme (1983). Steam to Silver. A history of London Transport Surface Rolling Stock. Capital Transport. ISBN 0-904711-45-5.
  • Green, Oliver (1987). The London Underground: An illustrated history. Ian Allan. ISBN 0-7110-1720-4.
  • Horne, Mike (2003). The Metropolitan Line. Capital Transport. ISBN 1-85414-275-5.
  • Jackson, Alan (1986). London's Metropolitan Railway. David & Charles. ISBN 0-7153-8839-8.

Further reading

  • Foxell, Clive (2010). The Metropolitan Line. History Press. ISBN 978-0-7524-5396-5.

Template:Attached KML/Metropolitan line
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.