Northern Link (MTR)
The Northern Link is a proposed rapid transit line of the MTR[1] system of Hong Kong which would connect the Tuen Ma line and the Lok Ma Chau Spur Line of the East Rail line. The link would also serve as a connection to the border checkpoint to mainland China for passengers to and from the western New Territories.[2] The Northern Link would start at Kam Sheung Road and end at Lok Ma Chau and Kwu Tung, and would be constructed either as a direct shuttle or with intermediate stations.
Northern Link 北環綫 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | NOL | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Kowloon-Canton Railway Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Districts: Yuen Long | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | MTR | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | MTR Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 10.7 km (6.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Northern Link | |||||||
---|---|---|---|---|---|---|---|
Traditional Chinese | 北環綫 | ||||||
Simplified Chinese | 北环线 | ||||||
|
Other benefits for constructing this project are significantly shorter journey times for certain trips (for example, the Yuen Long to Fanling route would be reduced in length from 20 stations to 5), significantly reducing costs for these trips, as well as relieving the large number of passengers using the East Rail line by diverting some passengers to the Tuen Ma line.
According to the Railway Development Strategy 2014, a shuttle service between Kam Sheung Road station and Kwu Tung station spanning 10.7 km (6.6 mi) is expected to begin construction in 2018 and be inaugurated in 2023.[3]
The initial line is expected to cost HK$62 billion in December 2015 prices, with an average of HK$500 million/km.[4][5]
Phases
The Northern Link (NOL) project is expected to consist of two phases.
Phase 1
Phase 1 consists of the construction and completion of Kwu Tung station that will initially serve the East Rail line after its opening, then later the Northern Link after the completion of Phase 2. It had been partially built by KCR Corporation during the construction of the Lok Ma Chau Spur Line. Construction of Kwu Tung station was approved by the government in 2022 is scheduled to commence in 2023 with completion due in 2027.[6]
It is expected to cost HK$3.5 billion in December 2015 prices.[7][8]
Phase 2
Phase 2 consists of the building of the Northern Link main line tracks from Kam Sheung Road station to Kwu Tung station. It also includes the construction of 3 new stations (Au Tau, Ngau Tam Mei and San Tin) along with the expansion of Kam Sheung Road station to accommodate the new tracks and platforms. Planning and designing began in 2021. Construction of the mainline is planned to begin in 2025 and be completed in 2034.[9]
It is expected to cost HK$58.5 billion in December 2015 prices.[10][11]
Land hoarding
In July 2021, Liber Research Community found that developers had begun to hoard land alongside the Northern Link line, buying at least 80 hectares of land near the line.[12]
Stations
Station Name | Connections | Opening date | District | |
---|---|---|---|---|
English | Chinese | |||
Phase 1 (Construction expected to begin 2023) | ||||
Kwu Tung | 古洞 | East Rail line | 2027 | North |
Phase 2 | ||||
Kam Sheung Road | 錦上路 | Tuen Ma line | 20 December 2003 | Yuen Long |
Au Tau | 凹頭 | 2034 | ||
Ngau Tam Mei | 牛潭尾 | |||
San Tin | 新田 | |||
Eastern Extension | ||||
Lo Wu South | 羅湖南 | East Rail line | N/A | North |
Man Kam To | 文錦渡 | |||
Lo Shue Ling | 老鼠嶺 | |||
Heung Yuen Wai | 香園圍 | |||
Ta Kwu Ling | 打鼓嶺 | |||
Ping Che | 坪輋 | |||
Queen's Hill | 皇后山 | |||
On Lok Tsuen | 安樂村 | |||
Fanling | 粉嶺 | East Rail line | 1 October 1910 | |
Northern Link Spur Line | ||||
San Tin | 新田 | 2034 | North | |
Chau Tau | 洲頭 | N/A | ||
HK-SZ Innovation and Technology Park | 港深創科園 | |||
Huanggang | 皇崗 |
References
- "MTR > Home".
- Legislative Council - Northern Link and Regional Express February 2006
- Railway Development Strategy 2014, Transport and Housing Bureau, Hong Kong Government
- 2023 Interim Results (PDF) (Report). MTR Corporation. 10 August 2023. p. 12. Retrieved 23 August 2023.
- Shum, Michael; Cheung, Jane (17 December 2020). "MTR Northern Link project gets go-ahead". The Standard.
- "Annual Report 2021: Excellence in Motion" (PDF). MTR Corporation. 10 March 2022. p. 25. Retrieved 9 August 2022.
A design consultant was appointed for Kwu Tung Station on the East Rail Line in April 2021, with construction targeted to commence in 2023 for completion in 2027.
- 2023 Interim Results (PDF) (Report). MTR Corporation. 10 August 2023. p. 12. Retrieved 23 August 2023.
- Shum, Michael; Cheung, Jane (17 December 2020). "MTR Northern Link project gets go-ahead". The Standard.
- "Hong Kong's planned Northern Link makes progress". 17 December 2020.
- 2023 Interim Results (PDF) (Report). MTR Corporation. 10 August 2023. p. 12. Retrieved 23 August 2023.
- Shum, Michael; Cheung, Jane (17 December 2020). "MTR Northern Link project gets go-ahead". The Standard.
- lrcresearcher. "【解剖「囤地線」】以鐵路為骨幹 撐起了誰的未來? #永續港鐵霸權 #7月專研". Liber Research Community (in Chinese (Hong Kong)). Retrieved 18 August 2021.