Guangzhou–Shenzhen intercity railway
Guangzhou–Shenzhen intercity railway or Suishen intercity railway (Chinese: 穗深城际铁路; pinyin: Suì-Shēn Chéngjì Tiělù)[1] is a commuter railway in the Pearl River Delta of Guangdong, China. The construction route traces roughly along the east bank of the Pearl River,[3] connecting Guangzhou, Dongguan and Shenzhen Bao'an International Airport. It will feature a length of 73.996 km (45.979 mi)[1] from Xintang South to Shenzhen Airport, operating at a top speed of 140 km/h (87 mph)[1][4] using CRH6A trains.
Guangzhou–Shenzhen intercity railway (Suishen intercity railway) | |
---|---|
Overview | |
Native name | 穗深城际轨道交通 穗深线 |
Locale | Guangdong province: Guangzhou, Dongguan, Shenzhen |
Termini |
|
Stations | 16 (in operation) |
Service | |
Type | Higher-speed regional rail |
Operator(s) |
|
Rolling stock |
|
History | |
Opened | 15 December 2019 |
Technical | |
Line length | 97 km (60 mi) (Guangzhou East–Shenzhen Airport section) |
Number of tracks | Double-track |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Minimum radius | 1,100–1,500 m (0.68–0.93 mi; 3,600–4,900 ft) |
Electrification | 25 kV 50 Hz AC (Overhead lines) |
Operating speed | 140 km/h (87 mph)[1] |
Maximum incline | 3.0% |
Guangzhou–Shenzhen ICR route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
This is the third railway between Guangzhou and Shenzhen. It is slower than the Guangzhou–Shenzhen–Hong Kong Express Rail Link but faster than the Guangzhou–Shenzhen railway.
History
Route planning in 2009 within Guangzhou changed several times and then a big change, with Xintang in Guangzhou's Zengcheng District chosen as the originating point, straight into Hongmei, Dongguan. This changed the access to the Guangzhou Metro to Line 13, with future access to the planned Line 16.[5][6] Guangzhou–Dongguan–Shenzhen intercity railway originally planned to through operate into Shenzhen Metro's Line 11 to Futian station in central Shenzhen.[7] However, in September 2010, it was announced that this railway will no longer enter through operate via Line 11 into Shenzhen city center and designed as a separate railway service.[8][9]
Chronology
- 21 December 2008 – Construction started.[10]
- 25 November 2009 – Dongguan–Changan segment started[11]
- 6 June 2012 – Deletion of Mayong station from plans.[12]
- 21 September 2012 – Dongguan–Shenzhen section started.[13]
- 17 October 2012 – Planning extends to Guangzhou East railway station, with renovating and running alongside the Guangzhou-Shenzhen Railway corridor[14] and the transformation of Jishan and Shipai stations will be upgraded for intercity use.
- 6 December 2012 – Shenzhen route basically established, with two sites in Shenzhen: Airport East station and Qianhaiwan station.[15]
- 14 May 2013 – Shenzhen section of the railway adjusted again, terminating at Airport Station, cancelling this line running to Airport East and Qianhaiwan stations.[16]
Station list
- Share tracks with Guangfo circular intercity railway from Huadu to Zhuliao.
Station Name[17] | Chinese | Distance km |
Pearl River Delta intercity railway transfers/connections & Airports |
Metro transfers/connections |
Location | |
---|---|---|---|---|---|---|
Huadu[lower-alpha 2] | 花都 | 0.00 | GFC GQ | 9 via Guangzhou North Railway Station | ||
Huachengjie | 花城街 | GFC | ||||
Huashanzhen | 花山镇 | |||||
Baiyun Airport North (Baiyunjichangbei) | 白云机场北 | 20.85 | GFC CAN |
3 | ||
Baiyun Airport South (Baiyunjichangnan) | 白云机场南 | 0.96 | ||||
Baiyun Airport East (Baiyunjichangdong) | 白云机场东 | 3.36 | ||||
Zhuliao | 竹料 | GFC | 14 | |||
Zhongluotan East | 钟落潭东 | |||||
Jiufo | 九佛 | 14 via Xinnan | ||||
Folang | 佛塱 | |||||
Xinlong | 新龙 | |||||
Zhenlong | 镇龙 | 14 21 | ||||
Yongning North | 永宁北 | |||||
Yongning South | 永宁南 | |||||
↑Xinbaiguang intercity railway (新白广城际铁路)↑ ↓Suishen (Guangzhou-Shenzhen) intercity railway (穗深城际铁路)↓ | ||||||
Guangzhou East (Guangzhoudong) | 广州东 | 1 3 | ||||
Shipai | 石牌 | |||||
Tianhe East (Tianhedong) | 天河东 | 4 21 via Huangcun | ||||
(Xintang Junction) | ||||||
Through service via Guangshen railway to/from Guangzhou East | ||||||
Xintang South (Xintangnan) | 新塘南 | 13 via Xintang | ||||
Zhongtang | 中堂 | 5.54 | ||||
Wangniudun | 望牛墩 | 5.37 | ||||
Dongguan West (Dongguanxi) | 东莞西 | 3.49 | GH FG | |||
Hongmei | 洪梅 | 3.25 | ||||
Dongguan Port (Dongguangang) | 东莞港 | 8.59 | ||||
Houjie | 厚街 | 5.15 | ||||
Humen North (Humenbei) | 虎门北 | 5.34 | GSH | 2 | ||
Humen East (Humendong) | 虎门东 | 4.08 | ||||
Chang'an West (Chang'anxi) | 长安西 | 6.75 | ||||
Chang'an | 长安 | 3.75 | ||||
Shajing West (Shajingxi) | 沙井西 | 8.28 | ||||
Fuhai West (Fuhaixi) | 福海西 | 4.93 | 12 | |||
Shenzhen Airport North (Shenzhenjichangbei) | 深圳机场北 | 4.43 | 11 20 | |||
Shenzhen Airport (Shenzhenjichang) | 深圳机场 | 3.82 | SZX | 11 | ||
Xixiang[2] | 西乡[2] | |||||
Bao'an[2] | 宝安[2] | 5 via Fanshen | ||||
Qianhai[2] | 前海[2] | SH SZ | 1 5 11 via Qianhaiwan | |||
Chaojizongbu[18] | 超级总部 | |||||
Huanggang Checkpoint[18] | 皇岗口岸 | 7 | ||||
Future development
Northern extension (Xinbaiguang intercity railway)
It is planned in the future to extend this railway further north eventually extending to Guangzhou Baiyun Airport and Guangzhou North railway station. The extension from Xintang South to Guangzhou North is also known as Xinbaiguang intercity railway (新白广城际铁路).[19]
Southern extension
Originally, the Suishen ICR was planned to enter central Shenzhen. The line was cut back to Shenzhen Airport in 2010.[9] The expansion of the line south of Shenzhen Airport was proposed again in 2019 but this time only up to Qianhai.[20][21] The extension will be underground, 15.15 km (9.41 mi) long with three stations.[22] In June 2020, NDRC approved a further extension beyond Qianhai deeper in to central Shenzhen. The extension will add about 10 km (6.2 mi) of line and additionally serve Baishizhou and Huanggang Port.[18] The southern extension is expected to be complete in 2025.[23]
Others
There are also possible links with the proposed Hong Kong–Shenzhen Western Express Railway, allowing for cross-border services and an eventual rail link between Hong Kong Airport with Shenzhen Airport and Guangzhou Airport.
Notes
- Subsidiary of Guangzhou Metro Group.
- Locate near Guangzhou North.
References
- "穗深城际铁路即将开通!从广州市区到深圳宝安机场最快仅需53分钟". 2019-12-13.
- "穗莞深城际轨道深圳机场至前海段工程项目社会稳定风险分析——公众参与公告". 2019-11-27. Retrieved 2019-11-30.
- 附件F,香港立法會 交通事務委員會鐵路事宜小組委員會,二零零七年一月五日. "北環線和廣深港高速鐵路香港段資料文件]" (PDF).
珠三角城際快速軌道RTS(廣州至深圳段)最高時速 Max. Speed 140 km/h
- "穗莞深城轨东莞境内设10站". June 7, 2012.
- "增城区新塘镇被改成穗莞深城轨地铁的起点". Archived from the original on July 15, 2009.
- "新塘将交汇三轨道线穗莞深城轨全程一个钟". May 7, 2009.
- "远期轨道交通线网方案". 深圳市規劃局. Archived from the original on May 28, 2010.
- "穗莞深城轨2015年建成 共设15车站深圳占4个". June 7, 2012.
- "穗莞深城际2015年建成 全线设立15个站点". June 7, 2012. Archived from the original on January 9, 2015. Retrieved January 9, 2015.
- "穗莞深城际轨道干线在深圳开工". December 22, 2008. Archived from the original on March 4, 2016. Retrieved January 9, 2015.
- "穗莞深城際軌道長安段動工 8社區設3個站". November 25, 2009. Archived from the original on January 9, 2015. Retrieved January 9, 2015.
- "穗莞深城际轨道减了一个站". June 6, 2012.
- "穗莞深城轨莞深段已动工 广州到深圳只需20元". September 21, 2012. Archived from the original on January 9, 2015.
- "穗莞深将连通到广州东站". October 17, 2012.
- "福田至九龙乘高铁仅14分钟". December 6, 2012. Archived from the original on December 30, 2017. Retrieved January 9, 2015.
- "穗莞深城轨莞深段再调:站点少两个投资多16.29亿元". 南方都市报. April 18, 2013. Archived from the original on June 30, 2013. Retrieved May 14, 2013.
- "广东省交通运输厅关于新白广城际铁路新塘至机场T2段项目车站站名命名方案的批复" (PDF). Retrieved 2021-02-03.
- "头条文章". card.weibo.com. Retrieved 2020-08-15.
- "新白广城际铁路开始铺轨". 2019-09-02.
- "最新!穗莞深城际延长线曝光!东莞直达深圳前海…_虎门". www.sohu.com. Retrieved 2020-08-15.
- "穗莞深城际轨道深圳机场至前海段工程项目社会稳定风险分析——公众参与公告". 2019-11-27. Retrieved 2019-11-30.
- "穗莞深城际轨道交通深圳机场至前海段工程环境影响评价第二次信息公告". www.rail-transit.com. Retrieved 2020-08-15.
- "前海+超总+福田!穗莞深城际今日开工,深圳段逆天了..." m.gelonghui.com. Retrieved 2020-08-15.