High-speed rail in India
Indian Railways does not currently have any operational high-speed rail lines, though a total of eight corridors have been approved, with the corridor between Mumbai and Ahmedabad under construction.[1] As of 2023, the fastest train services in India are the Gatimaan Express and Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express with peak operational speed of 160 km/h (99 mph) on the Tughlakabad – Agra Cantonment section of the route.[2]
The first high-speed railway corridor between Mumbai and Ahmedabad (508 km (316 mi)) is currently under construction with a designed maximum operational speed of 320 km/h (199 mph).[3][4] The corridor will use standard gauge, instead of the more prevalent broad gauge on the rest of the rail network, and will be built with Shinkansen technology. It is expected to carry passengers between the two cities in around three hours and the ticket prices are expected to be competitive with air travel. This project was initially targeted for completion by December 2023, however, owing mainly to land acquisition issues in Maharashtra and the COVID-19 pandemic, it is now expected to be completed by October 2028. However, a portion of this line between Surat and Bilimora is planned to be opened by 2026.[5][6]
Background
The Ministry of Railways white-paper "Vision 2020",[7] submitted to the parliament on 18 December 2009,[8] envisaged the implementation of regional high-speed rail projects to provide services at 250–350 km/h (155–217 mph), and planning for corridors connecting commercial, tourist, and pilgrimage hubs.
At the 2014 general elections, the Bharatiya Janata Party (BJP) expressed its desire to build the Diamond Quadrilateral high speed rail project, which would connect the cities of Chennai, Delhi, Kolkata, and Mumbai via high-speed rail.[9] This project was approved as a priority for the new government in the incoming president's speech.[10] Construction of one kilometre of high speed railway track was estimated to cost ₹100 crore (US$13 million) – ₹140 crore (US$18 million) which is estimated to be 10–14 times higher than the cost of construction of standard railway.[11]
The new high-speed rail lines with will be standard gauge, whereas older tracks which could be upgraded to higher speeds will have a 5 ft 6 in (1,676 mm) broad gauge. There can, therefore, be no interoperability between the new lines and the older-upgraded tracks for passenger and cargo traffic, unless it is decided to use variable gauge systems in future.
Definition and terminology
According to the Ministry of Railways, a route which has trains operating between 160 and 200 km/h (99 and 124 mph) is considered as a higher speed or semi-high speed rail line, while the routes operating at less than 160 km/h (99 mph) are considered to be conventional rail lines.[12] According to the UIC definition, a commercial speed of over 250 km/h (160 mph) for a newly built line or 200 km/h (120 mph) for an upgraded line is considered to be high-speed.[13] As of July 2023, India has 508 km of high-speed tracks under construction; while 174 km of tracks in the section of Tughlakabad – Agra Cantonment support semi-high speeds.[14]
Under Construction
Speed | Type | Length |
---|---|---|
<110 km/h (68 mph) | Conventional rail | 67,869 km (42,172 mi) |
>110 km/h (68 mph) and <130 km/h (81 mph) | Group B lines | |
>130 km/h (81 mph) and <160 km/h (99 mph) | Group A lines | |
>160 km/h (99 mph) and <200 km/h (120 mph) | Semi-high-speed rail | 191 km (119 mi) |
>200 km/h (120 mph) | High-speed rail | 508 km (316 mi) |
- As of 26 October 2023
History
Steam era: 90 km/h speed
During the steam era of Indian railways, the trains rarely managed to reach speeds of 90 km/h (56 mph). It was only until the introduction of WP class locomotive in the 1940s where speeds of 100 km/h (62 mph) were operated commercially.[15] The move from steam technology happened when the electrification was completed in Bombay Division. WCP-1 class electric locomotives were used to haul the coaches with a speed beyond 100 km/h (62 mph) and they had a theoretical maximum speed of 120 km/h (75 mph). Due to the intervening World Wars, Indian Railways were unable to introduce electrification beyond the Bombay Division and hence steam locomotives dominated the lines in the rest of India.[15]
1960s: Diesel era
The era of diesel locomotives took shape in the 1960s when Indian Railways imported WDM-1 and WDM-2 class locomotives from the American company, ALCO. Although the WDM-1 struggled to cross the 100 km/h (62 mph) speed mark, the subsequent introduction of WDM-2 and WDM-4 locomotives achieved these speeds for the most of the decade.[15]
1970s: electric train era
India began developing higher-speed rail by inaugurating the Howrah Rajdhani Express back in March 1969, five years after Japan inaugurated Shinkansen, the world's first high-speed rail which was running at twice the speed of Rajdhani Express.[16] With the initiation of various electrification projects in the 1970s on the trunk routes, the electric locomotives soon began to replace their diesel counterparts. The WAP-1 electric locomotive broke the record to be the fastest locomotive in India during the 1980s, reaching a maximum speed of 160 km/h (99 mph) during trial runs and was certified for commercial operations at 140 km/h (87 mph).The first service to reach a maximum speed of 140 km/h (87 mph) was, the WAP-1 hauled, Shatabdi Express from New Delhi to Jhansi in 1989.[15]
WAP-5 class locomotives, the first AC locomotives of its kind in India, were imported to haul fast, short trains like the Shatabdi Express. They also featured fully suspended traction motors, reducing the impact on tracks and allowing faster speeds. The first batch of these locomotives arrived in India in 1995 and operated at speeds of 130 km/h (81 mph). During the trial runs, this locomotive reached a record speed of 184 km/h (114 mph) which made it the fastest locomotive in India.[15]
in April 2016, the WAP-5 hauled Gatimaan Express became the fastest commercially operated train in India, with a maximum operational speed of 160 km/h (99 mph).[17] Two years later, Indian Railways developed the second indigenously built, semi-high-speed EMU train, the Vande Bharat Express based on MEMU. This train reached a speed of 180 km/h (112 mph) during its trial run and was designed to run at a maximum speed of 200 km/h (124 mph), but due to the speed limitations on tracks, the train's operational speed is restricted to 130 km/h (81 mph).[18]
1980s onwards: proposals for high-speed rails
In mid-1980s, then railway minister, Madhavrao Scindia proposed the Delhi-Kanpur high-speed rail line which was found financially unviable,[19] thus railways instead introduced Shatabdi trains which ran at 140 km/h (87 mph).[20] Under the Vision 2020 white paper in 2009, six elevated corridors were identified for technical studies on setting up of high-speed rail corridors. The 'High Speed Rail Corporation of India Ltd' (HSRC), founded on 25 July 2013 by Rail Vikas Nigam Ltd. (RVNL) for the high-speed rail corridor projects,[21][22][23][24][25][26] was replaced by the 'National High-Speed Rail Corporation Limited' on 12 February 2016 as the government company for construction and operation of high-speed rail corridors.[27]
2017 onwards: construction of high-speed rail
Construction of the Mumbai–Ahmedabad high-speed rail corridor, India's first high-speed rail corridor started in 2017 and is expected to be completed by 2028. The foundation stone laying ceremony was held on 14 September 2018 when Japanese Prime Minister Shinzō Abe and the Prime Minister of India, Narendra Modi, flagged off the construction work in Ahmedabad. The E5 Series Shinkansen trains will have a maximum operational speed of 320 km/h (199 mph) and an average speed of 260 km/h (162 mph).[6]
Network
The network is proposed to have top speeds of 300–350 km/h (186–217 mph), and are envisaged to run on elevated corridors to isolate high-speed train tracks to prevent trespassing.[19] Multiple feasibility studies have been done[29] by Systra, Italferr, RITES Limited, Mott MacDonald, INECO, PROINTEC, Ayesa, Japan External Trade Organization (JETRO), Parsons Brinckerhoff.[30][31][32][33]
Under Construction
Approved
Proposed
High-speed Corridor | Speed | Length | Further extension | Status | Planned opening (According to NRP)[34] | ||
---|---|---|---|---|---|---|---|
km/h | mph | km | mi | ||||
North[35] | |||||||
Delhi–Varanasi high-speed rail corridor | 320 | 200 | 865 | 537 | DPR* under preparation | 2031 | |
Delhi–Amritsar high-speed rail corridor | 320 | 200 | 480 | 300 | (Via Chandigarh) | Approved[36] | 2051 |
Delhi–Ahmedabad high-speed rail corridor | 320 | 200 | 886 | 551 | (Via Udaipur) | Land acquisition to begin | 2031 |
Amritsar–Jammu high-speed rail corridor | 320 | 200 | 190 | 120 | (Via Pathankot) | Proposed[37] | 2051 |
East | |||||||
Varanasi–Howrah high-speed rail corridor | 320 | 200 | 711 | 442 | (Via Patna) | DPR under preparation[38] | 2031 |
Patna–Guwahati high-speed rail corridor | 320 | 200 | 850 | 530 | Proposed | 2051 | |
West | |||||||
Mumbai–Ahmedabad high-speed rail corridor | 320 | 200 | 508.18 | 315.77 | (Via Surat, Bilimora) | Under Construction | 2026 (Surat-Bilimora)
2028 (full completion) |
Mumbai–Nagpur high-speed rail corridor | 320 | 200 | 736 | 457 | (Via Nashik, Aurangabad) | DPR under preparation | 2051 |
Mumbai–Hyderabad high-speed rail corridor[39] | 350 | 220 | 711 | 442 | (Via Pune, Solapur) | DPR under preparation | 2051 |
Pune–Nashik rail line[40] | 200 | 120 | 235.15 | 146.12 | (Via Narayangaon, Sangamner) | Land acquisition initiated | 2027 |
Ahmedabad–Rajkot high-speed rail corridor[41] | 220 | 140 | 225 | 140 | (Via Limbdi) | DPR Prepared | TBD |
Central | |||||||
Nagpur–Varanasi high-speed rail corridor | 320 | 200 | 855 | 531 | Proposed | 2041 | |
South | |||||||
Chennai–Mysuru high-speed rail corridor | 320 | 200 | 435 | 270 | (Via Bengaluru)[36] | DPR under preparation | 2031 |
Hyderabad–Bengaluru high-speed rail corridor | 320 | 200 | 618 | 384 | Proposed | 2041 | |
Silver Line (Thiruvananthapuram–Kasaragod)[42] | 200 | 120 | 529.45 | 328.98 | (Via Ernakulam) | DPR Prepared | TBD |
Total | |||||||
15 corridors | Average speed : ≈300 kmph | 8,834.78 | 5,489.68 | – | 0/15 | 2051 |
*DPR = Detailed Project Report
High-speed Diamond Quadrilateral
The Diamond Quadrilateral high-speed rail network project is envisioned to connect the four major metro cities of India namely: Chennai, Delhi, Kolkata, and Mumbai.[43][44][45][46]
High-speed Corridor | Speed | Length | Via | Status | Planned opening (According to NRP)[34] | ||
---|---|---|---|---|---|---|---|
km/h | mph | km | mi | ||||
Delhi–Kolkata | 320 | 200 | 1,576 | 979 | Varanasi | DPR under preparation | 2031 |
Kolkata–Chennai | 320 | 200 | 1,500 | 930 | Vishakapatnam | TBD | TBD [note 1] |
Mumbai–Chennai | 320 | 200 | 1,200 | 750 | Hubli | TBD | TBD [note 2] |
Delhi–Mumbai | 320 | 200 | 1,394 | 866 | Ahmedabad and Jaipur | One section under construction | 2031 |
Delhi–Bengaluru | 320 | 200 | 1,900 | 1,200 | Bhopal and Hyderabad | TBD | TBD [note 3] |
Mumbai–Kolkata | 320 | 200 | 1,800 | 1,100 | Nagpur | TBD | TBD [note 4] |
Semi-high-speed rail
Train services
India has several semi-high speed routes which allow trans running at semi-high speeds (160kmph), these services are called Vande Bharat Express[47][48][49][50] and Gatimaan Express.[51][52][53]
160–200 km/h track upgrades
Indian Railways aims to increase the speed of passenger trains to 160–200 km/h (99–124 mph) on dedicated conventional tracks. Indian railways also intend to improve the existing conventional lines to handle speeds of up to 160 km/h (99 mph), with a goal of speed more than 200 km/h (124 mph) on new tracks with improved technology.[7] Trains have already been built by native companies that can reach speeds of 200 km/h (124 mph).[54] Dedicated Freight Corridor Corporation of India has built dedicated freight corridors across India to move cargo traffic from the passenger railway tracks, thus increase the speed of the passenger trains to 200 km/h (124 mph).[55] Indian Railways have classified the tracks in two categories. The tracks that support 110 km/h (68 mph) – 130 km/h (81 mph) are classified as 'Group B' while the tracks that support 130 km/h (81 mph) – 160 km/h (99 mph) are classified as 'Group A'.[56][57] The following list has various routes that operate, are under construction or are planned to run at speeds of 160 km/h and beyond. This table does not list the trains that are capable to run at speeds of 160 km/h or beyond, for such information on trains, see here.
Operational
Under upgradation
Planned
Route | Speed | Length | Opening | Notes |
---|---|---|---|---|
Tughlakabad – Agra Cantonment | 160 km/h (99 mph) | 174 km (108 mi) | 5 April 2016 | First semi-high speed (1,676 mm (5 ft 6 in) Broad gauge) track.[58][59] |
Delhi – Mumbai | 160 km/h (99 mph) | 1,384 km (860 mi) | March 2024 | Preliminary work underway.[60] |
Agra Cantonment – Howrah (Kolkata) | 160 km/h (99 mph) | 1,446 km (899 mi) | TBD | Preliminary work underway.[61] |
Chennai – Gudur | 160 km/h (99 mph) | 134.3 km (83.5 mi) | TBD | DPR Submitted[62] |
Chennai – Renigunta | 160 km/h (99 mph) | 134.78 km (83.75 mi) | TBD | DPR Submitted[62] |
Mumbai – Howrah (Kolkata) | 160 km/h (99 mph) | 1,965 km (1,221 mi) | TBD | DPR Submitted[63] |
Mumbai – Chennai | 160 km/h (99 mph) | 1,276 km (793 mi) | TBD | DPR Submitted[63] |
Chennai – Howrah (Kolkata) | 160 km/h (99 mph) | 1,652 km (1,027 mi) | TBD | DPR Submitted[63] |
Bengaluru – Chennai | 160 km/h (99 mph) | 362 km (225 mi) | TBD | DPR Submitted[63] |
Chennai – New Delhi | 160 km/h (99 mph) | 2,164 km (1,345 mi) | TBD | DPR Submitted[63] |
Bengaluru – Hyderabad | 160 km/h (99 mph) | 632 km (393 mi) | TBD | DPR Submitted[63] |
Chennai – Hyderabad | 160 km/h (99 mph) | 715 km (444 mi) | TBD | DPR Submitted[63] |
Howrah (Kolkata) – Puri | 160 km/h (99 mph) | 502 km (312 mi) | TBD | DPR Submitted[63] |
13 routes | 160 km/h (99 mph) | 14,193.08 km (8,819.17 mi) |
New 160-200 km/h Standard gauge tracks
Operational
Under construction
Planned
Route | Speed | Length | Status |
---|---|---|---|
Delhi – Meerut | 180 km/h (110 mph) | 82 km (51 mi) | Partially opened[64] |
Delhi – Alwar | 180 km/h (110 mph) | 164 km (102 mi) | Under construction[64] |
Delhi – Panipat | 180 km/h (110 mph) | 103 km (64 mi) | Approved[64] |
Delhi – Rohtak | 180 km/h (110 mph) | 70 km (43 mi) | Proposed[65] |
Delhi – Palwal | 180 km/h (110 mph) | 60 km (37 mi) | Proposed[65] |
Delhi – Baraut | 180 km/h (110 mph) | 54 km (34 mi) | Proposed[65] |
Ghaziabad – Khurja | 180 km/h (110 mph) | 83 km (52 mi) | Proposed[65] |
Ghaziabad – Hapur | 180 km/h (110 mph) | 57 km (35 mi) | Proposed[65] |
Delhi – Jewar | 180 km/h (110 mph) | 67 km (42 mi) | Proposed[65] To connect with Jewar International Airport |
Hyderabad – Warangal | 180 km/h (110 mph) | 146 km (91 mi) | Proposed[66] |
Hyderabad – Vijayawada | 180 km/h (110 mph) | 281 km (175 mi) | Proposed[66] |
11 routes | 180 km/h (110 mph) | 1,167 km (725 mi) |
Super-high-speed rail
Maglev
Indian Railways explored the possibility of maglev trains to implement an over-500-kilometre-per-hour (310 mph) speed rail system to shift from technology importer to manufacturer and developer.[67][68][69][70] In February 2019, a train model based upon MagLev systems was unveiled by scientists from Raja Ramanna Centre for Advanced Technology for a speed of 600 km (370 mi) per hour.[71] In September 2020, Bharat Heavy Electricals Limited signed a pact with SwissRapide AG to bring MagLev metro systems in India.[72]
Hyperloop
There is no currently operational hyperloop system in the world. Although there has been human testing, but the proposed speed projections depend on significant engineering advances & testing.[73]
- Mumbai-Pune Hyperloop
1,000 km/h hyperloop system would take 14 minutes compared to the current 3 hours to commute between these two cities while carrying 10,000 commuters per hour (5,000 in each direction). Hyperloop Onesubmitted a Detailed Project Report submitted to Pune Metropolitan Region Development Authority (PMRDA) in January 2018 with 3 terminal end-points options in Mumbai, namely Dadar, Santacruz and the Chhatrapati Shivaji Maharaj International Airport. In 2018, 3,00,000 people commute daily between these two cities daily in 1,10,000 vehicles (including 80,000 cars and 6,000 buses).[74]
- Amritsar-Chandigarh Hyperloop
Virgin Hyperloop signed a MoU with Punjab in 2019 for building a rail to cover total 226 km (140 mi) distance in 19 minutes, which will be at least 10 times faster than a trip taken by existing transport infrastructure of road, rail or flight.[75]
- Bengaluru-Chennai Hyperloop
Los Angeles-based Hyperloop One, signed a MoU with Karnataka government to conduct feasibility study for thus route which will reduce the travel time to 20 minutes.[76]
Technology
Shinkansen
The Indian railways will construct bullet train assembly facilities on a public-private participation (PPP) model. As per National High Speed Rail Corporation Limited (NHSRCL), Japanese companies will set up manufacturing facilities in India to build the parts for bullet train sets.[77]
Indigenous technology
Indian Railways is developing EMU train sets which can operate at a semi-high speed of (200 km/h (124 mph)). In 2019, The Vande Bharat Express or Train 18 replaced Shatabdi Express. 'Train 20' is another proposed overnight semi-high-speed train to replace the existing Rajdhani Express service. Both of these will be manufactured by Integral Coach Factory (ICF).[78] These trains have driver cabins on both ends, which eliminates the time needed for turnaround at the terminal station. Since these are EMU train sets, the time and distance taken to accelerate and decelerate is reduced, enabling the train to travel at a top speed for longer distance. The coaches have automatic sliding doors, onboard Wi-Fi service, GPS based information system, wide windows, bio-toilets and are fully air-conditioned. The rake of Vande Bharat Express has sixteen coaches, consisting of two Executive Chair Cars and fourteen AC Chair Cars, it is being operated at 130 km/h due to track limitations. Train 20 is set to have twenty coaches consisting of AC First Class sleeper, AC II Tier sleeper, AC III Tier sleeper classes and an AC Chair Car, it is set to operate at 160 km/h. Train 20's proposed top speed was announced to be at 176 km/h.[79][80]
Construction technology
The Mega Carrier and Launcher Machines or Transporter, Gantry, and Full Span Launcher Machines are the machines that are used to construct viaducts (elevated structures) for bullet train corridors in China. These vehicles carry an entire girder by traveling on an already launched girder to place the next girder. The speed was seven times faster than India's previous girder launching mechanism. While the Chinese machine laid two girders a day, the previous Indian girder launching mechanism placed one and a half girders in a week.[81] The NHSRCL had posed a challenge to build such machines for L&T which is currently constructing the 325 km (202 mi) stretch of Mumbai-Ahmedabad line. Each of these machines cost around ₹70–80 crores and 30 such machines are required to construct 237 km (147 mi) stretch.[81] On 9 September 2021, India joined Norway, Italy, China, and South Korea to possess Full Span Launching Methodology (FSLM) technology after L&T was successfully able to develop it indigenously. NHSRCL will acquire 20 such machines for their Mumbai-Ahmedabad high-speed rail project in order to ramp up the construction progress. These machines can be further used to build viaducts for elevated roads and rapid transit systems across India.[82][83]
List of trains
Name | Origin | Manufacturer | lines | Type | Power supply | Maximum speed (km/h) | In Service |
Picture | ||
---|---|---|---|---|---|---|---|---|---|---|
Top speed | Operational Top speed | Designed speed | ||||||||
High-speed | ||||||||||
E5 Series Shinkansen | Japan | Hitachi Rail & Kawasaki |
None Currently,
12 planned |
EMU | Electric (25 kV 50 Hz AC) | 320 | N/A | 320 | 2028–29[5] | |
Semi-high-speed | ||||||||||
Vande Bharat (second generation) | India | ICF | 33 | EMU | Electric | 180 | 160 | 200 | 2022 | |
Vande Bharat (first generation) | India | ICF | 1 | EMU | Electric | 180[84] | 130[85] | 200[86] | 2019 | |
Namo Bharat | India | Alstom | 1 | EMU | Electric | 160 | 160 | 180 | 2023 |
Research and Development
National Academy of Indian Railways, research based railway technology university in Vadodara,[87][88] was established in 2018 with the aim of developing indigenously high-speed train manufacturing technology.[89] Other institutions focused on Railway technology research and development are:
- IIT BHU Malviya Centre for Railway Technology,
- IIT Kharagpur Centre for Railways Research,
- Research Design and Standards Organization (RDSO).
Records
Date | System | Type | Speed | Picture |
---|---|---|---|---|
1947 | WP class | Steam | 100 km/h[15] | |
1969 | WDM-4 | Diesel | 120 km/h[15] | |
1971 | WDM-4 | Diesel | 130 km/h[15] | |
1971 | WAM-2/3 | Electric | 140 km/h[15] | |
1982 | WAM-4B | Electric | 145 km/h[15] | |
1988 | WAP-1 | Electric | 160 km/h[15] | |
1996 | WAP-4 | Electric | 169 km/h[15] | |
June 1997 | WAP-5 | Electric | 184 km/h[15] |
Criticism
India's choice of the standard gauge for high-speed rail goes against the Project Unigauge,[90] with claims it could provides better stability and therefore the broad gauge railway could be better suited for high-speed rail in India as the cost of constructing greenfield high-speed rail line could be avoided by upgrading the existing brownfield lines.[91] To address the suggestions that India must invest in alternative technologies such as maglev,[92] India has opened a railway technology university, and is in the process of developing the indigenous technology.
Criticism by rail-fans and others that 1960s Shinkansen technology might not viably compete with aviation industry,[92] and that India must modernise & expand existing systems,[92] has been addressed by keeping the proposed fares competitive against airline fares, modernizing the existing network and expanding the metro network.
See also
- Rail tracks
- Dedicated freight corridors in India
- List of high-speed railway lines in India
- RapidX, semi-high-speed rail
- Urban rail transit in India, metro systems
- Train service:
- Express trains in India, intercity trains with limited stops.
- MEMU, operated on short and medium distances.
- Train 20, semi-high-speed train for longer distances.
Notes
- "This route is not yet planned and it represents the most feasible route for Diamond Quadrilateral high-speed rail line between these two metro cities.
- "The Mumbai–Chennai route is not planned yet. This route represents the most feasible route for Mumbai-Chennai section of Diamond Quadrilateral high-speed rail line. Although a section of this potential route between Chennai and Bengaluru has been planned to be operational by 2051.
- "This route is not planned yet and it represents the most feasible route for Delhi-Bengaluru section of Diamond Quadrilateral high-speed rail line. However, one section of this potential route between Hyderabad and Bengaluru is planned to be operational by 2041.
- "This route beyond Nagpur is not planned yet and it represents the most feasible route for Mumbai–Kolkata section of Diamond Quadrilateral high-speed rail line. However, the Mumbai–Nagpur section of this line is planned to be operational by 2051.
References
- "Wow! Indian Railways eyes 7 more bullet train corridors; all will be open to PPP investments". The Financial Express. 21 September 2020. Retrieved 21 September 2020.
- "Bhopal Delhi Vande Bharat Express: TOP SPEED of 160 km/h! Is food free in Delhi to Bhopal semi high-speed train? Know time, route, ticket price". TimesNow. 3 April 2023. Retrieved 3 April 2023.
- "India to sign deal with Japan to get first bullet train". The Hindu. 8 December 2015.
- "Japan's High-Speed Rail Breakthrough". thediplomat.com.
- "India's bullet train faces 5-year delay: High costs, Japan firms not so keen". The Indian Express. 6 September 2020.
- "Japan Is Selling Bullet Trains to India". Bloomberg News. 13 September 2017. Retrieved 15 December 2017.
- "Indian Railways: Vision 2020" (PDF). Indian Railways. December 2009. Retrieved 29 November 2014.
- "India getting ready for bullet trains – Central Chronicle". Archived from the original on 17 July 2011.
- "BJP Manifesto 2014" (PDF).
- "Diamond quadrilateral of high-speed trains". 10 June 2014.
- "Laying high speed train corridor to cost Rs. 80,000 crore". The Hindu. 16 March 2015.
- "Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)". Disha Diary. 29 October 2013. Archived from the original on 13 November 2013. Retrieved 13 November 2013.
- "WHAT IS HIGH-SPEED RAIL? – High-Speed World – by Langages du Sud".
- "Vande Bharat Express trains running at average speed of 83 km/h against permissible limit of 130 km/h, reveals RTI reply filed in MP". Free Press Journal. 17 April 2023.
- "Evolution of High-Speed Haulage on Indian Railways". IRFCA. 2015.
- "Has India's high-speed train left?". The Economic Times. 1 August 2009.
- "Train to be named Gatimaan Express". The Hindu. Retrieved 5 April 2016.
- "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today. Press Trust of India. 7 February 2019. Retrieved 15 February 2019.
- INTRODUCTION OF HIGH SPEED CORRIDORS ON I.R.: IMPACT AND CHALLENGES BEFORE CIVIL ENGINEERS – Parmod Kumar, EDCE(G)/Railway Board
- "High Speed Railways in India: imperative for current times – India – CNN-IBN". 12 February 2013. Archived from the original on 12 February 2013.
- "Indian Railways finally moving on its dream project – high-speed trains". The Economic Times.
- "Don't bite the bullet". 22 August 2012. Archived from the original on 22 August 2012.
- "AP: India – Railways sets up corp for bullet train". Project Finance International (PFI).
- "Railways to set up corporation to focus on bullet train project". Zee News. 29 July 2012.
- "Indian high-speed project moves forward". International Railway Journal. 10 September 2012.
- "High Speed Rail Corp of India launched". Railway Gazette.
- "Welcome to HSRC". hsrc.in. Retrieved 20 July 2017.
- Dedicated Freight Corridors & High Speed Rails, India's Ultra Low Carbon Mega Rail Projects – Anjali Goyal, Executive Director (Budget), India.
- "India holds talks with Japan on high speed train corridors". Archived from the original on 16 January 2012. Retrieved 2 February 2012.
- says, Bastich (9 October 2013). "India, Japan sign MoU for feasibility study of high speed railway system in India".
- "Feasibility study for Mumbai – Ahmedabad high speed line agreed – Railway Gazette". Archived from the original on 27 January 2016. Retrieved 26 October 2013.
- Archived 12 October 2014 at the Wayback Machine
- "Mumbai-Ahmedabad bullet train? Chinese team visits CST". 16 September 2014.
- "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
- Agarwal, Anshu (31 January 2021). "Delhi likely to get 2 stations under 3 proposed Bullet train projects". Business Standard India.
- Agarwal, Anshu (22 February 2021). "Aarvee-GSL Wins Chennai-Mysuru HSR's LiDAR & Alignment Design".
- "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
- "Growever Wins Varanasi – Howrah HSR's LiDAR & Alignment Design". 9 April 2021.
- "High speed rail corridor: Travel time from Mumbai to Hyderabad and Nagpur to reduce by 50 percent". The Times of India. 31 January 2020. Retrieved 11 June 2020.
- "Big boost for city as Pune-Nashik high-speed rail project gets Centre's in-principle approval". Hindustan Times. 5 February 2023. Retrieved 20 April 2023.
- "Ahmedabad-Rajkot new rail link approved; to help Saurashtra region avail Bullet Train services". The Financial Express. Retrieved 20 April 2023.
- Shah, Narendra (23 December 2022). "A Silverline Project to connect entire Kerala". Metro Rail News. Retrieved 20 April 2023.
- "Focus on diamond quadrilateral". The Hindu. 12 June 2014.
- Sanjib Kumar. "Powering a high-speed dream". Gulf News.
- "New Indian government moots high-speed rail network, Chris Sleight, KHL". Archived from the original on 14 July 2014. Retrieved 7 June 2014.
- "Address by The President of India to the Joint sitting of Parliament 2014" (PDF). Archived from the original (PDF) on 14 July 2014. Retrieved 9 June 2014.
- "India's Fastest Train Gets Its Route Extended: Gatimaan Express Timetable, Other Details". NDTV. 5 April 2018.
- Soni, Anusha (4 July 2014). "Railways completes pilot project for semi-high-speed train". Business Standard India.
- "Indian Railways To Launch Semi High-Speed Bullet Trains On Three Routes". Archived from the original on 25 March 2016. Retrieved 7 July 2014.
- Aggarwalhi (14 March 2019). "At 180 kmph Vande Bharat is India's fastest train. Here's top 10 fastest trains in India". indiatvnews.com. Retrieved 22 June 2021.
- Writer (22 January 2021). "Railways finalises tender for Vande Bharat train sets in 'Make in India' boost". mint. Retrieved 22 June 2021.
- "Delhi-Katra Vande Bharat Express commercial run from Oct 5, booking opens". The Economic Times. Retrieved 18 July 2021.
- Livemint (30 September 2022). "New Vande Bharat Express flagged off by PM. Know routes, timings, other details". mint. Retrieved 1 October 2022.
- "Business News Today: Read Latest Business news, India Business News Live, Share Market & Economy News". The Economic Times.
- "DFC – as revolutionary as the Golden Quadrilateral" (PDF). Indian Railways. Retrieved 13 September 2016.
- "Indian Railways Classification of Lines as A , B , C , D , E – Railways FAQ – Railway Enquiry". indiarailinfo.com. Retrieved 4 May 2023.
- "Classification of Railway Lines in India". BrainKart. Retrieved 4 May 2023.
- "Delhi-Agra at 160 km/h: 10 points about Gatimaan, India's fastest train". Hindustan Times. 5 April 2016. Retrieved 4 May 2023.
- "Vande Bharat Express trains running at average speed of 83 km/h against permissible limit of 130 km/h, reveals RTI reply filed in MP". Free Press Journal. Retrieved 8 May 2023.
- "Higher capacity lines to fuel semi-high-speed trains on Mumbai-Delhi route". Hindustan Times. 12 April 2023. Retrieved 4 May 2023.
- "Delhi-Howrah travel may be cut by 2.5 to 3 hours: Indian Railways". Hindustan Times. 29 June 2022. Retrieved 4 May 2023.
- Nandi, Tamal (1 December 2022). "Journey to Bengaluru to get quicker! Chennai-Bengaluru train to run at 160 km/h". mint. Retrieved 4 May 2023.
- Desk, RailPost News (10 November 2021). "160 Kmph Upgrade: Indian Railways Tells Zones To Prepare DPR For Important Routes – RailPost.in". Retrieved 11 November 2021.
- "Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor". NDTV.com.
- "Delhi-NCR RRTS – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 20 December 2021.
- "Telangana to take up Regional Rapid Transit System".
- "Mission 350 Plus: Railways To Explore Levitation Technology". ndtv.com. Retrieved 2 January 2017.
- "Hyperloop One, Maglev may take part in the railways' ultra-high speed technology meet – Infracircle". 19 August 2016. Retrieved 1 September 2016.
- Jacob, Shine (31 August 2016). "Railways to float EOI for ultra high speed trains". Business Standard India. Retrieved 1 September 2016.
- Lohumi, Manasi (28 November 2016). "Indian Railways moves ahead on Maglev trains project". Mint. Retrieved 12 July 2017.
- Sharma, Pramod (25 February 2019). "RRCAT scientists develop model of Maglev Train which runs at 600 km/h". Zee News. Retrieved 21 December 2020.
- "BHEL, SwissRapide AG in pact to bring Maglev trains to India". The Tribune. New Delhi. 16 September 2020. Retrieved 21 December 2020.
- Brandom, Russell (2 August 2017). "A real hyperloop is almost here – and it's not what Elon Musk envisioned". The Verge. Retrieved 4 May 2019.
- Pune-Mumbai in 14 minutes: Firm's project report says Hyperloop transport system feasible, Hindustan Times, 9 January 2018.
- "Virgin Hyperloop Punjab". Retrieved 21 April 2022., Virgin Hyperloop
- "Bengaluru to Chennai in 20 mins? Karnataka ropes in Hyperloop One for feasibility study". Moneycontrol. Retrieved 25 February 2018.
- "Make in India: Railways to pitch for building bullet train coaches locally". Hindustan Times. 4 October 2018.
- "Engine-less train: 160 kmph Train 18 to be out in June, Train 20 in 2020". 23 January 2018.
- "Ahead of Railway Budget 2018, Modi's Make in India gets boost with plans for 'world-class' Indian Railways trains". 23 January 2018.
- "Train 18: 2 new 'world class' trains to cut travel time by 20% | India News". The Times of India.
- "Atmanirbhar push in bullet train: Industry told to build substitute for made-in-China tech". The Indian Express. 30 November 2020.
- "Full span launching equipment, straddle carrier and girder transporter acquired for Ahmedabad-Mumbai bullet project". The Times of India. 9 September 2021.
- "Mumbai-Ahmedabad Bullet Train: Indigenous Full Span Launching Equipment flagged off to expedite development". The Financial Express. 10 September 2021.
- Jain, Smriti (2 December 2018). "Train 18 exclusive: Engine-less train becomes Indian Railways fastest at 180 km/h; truly remarkable feat!". The Financial Express. The Express Group.
- "Vande Bharat Express achieves 130 km/h speed during inaugural run". Business Standard India. Press Trust of India. 15 February 2019. Retrieved 30 June 2021.
- "Train 18: Top features and facilities of the country's 'fastest train'". The Hindu. 3 December 2018. ISSN 0971-751X. Retrieved 20 June 2021.
- "India's first railway university in Vadodara: Everything you need to know". The Indian Express. 15 December 2018.
- "Gujarat govt allots land for India's first Railway university". Business Standard India. Press Trust of India. 21 August 2019.
- "University of Railways – Why, What, How and Where?". Rail Electrica. 4 December 2014.
- "Indian Railways: Glorious History". Press Information Bureau, Government of India. New Delhi: Ministry of Railways. 21 February 2007. Retrieved 1 February 2020.
The Project Unigauge was launched on 1 April 1992 to develop the backward regions and to connect important places with broad gauge network.
- Why India chose standard gauge over broad gauge for high-speed rail. The Train Story. 13 December 2019. Archived from the original on 15 December 2021.
- "Bullet Train is a white elephant, Retired bureaucrat and rail enthusiast rips apart Modi's plan". The News Minute. 24 September 2017.