Kelana Jaya line
The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms a part of the Klang Valley Integrated Transit System in and around Kuala Lumpur, Malaysia. Servicing 37 stations, the line has 46.4 km (28.8 mi) of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA LRT, it is operated as part of the RapidKL system by Rapid Rail, a subsidiary of Prasarana Malaysia. The line is named after its former terminus, the Kelana Jaya station.
Kelana Jaya Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | LRT Laluan Kelana Jaya | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Fully operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Prasarana Malaysia | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 5 (ruby) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Klang Valley | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 37[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | myrapid | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Medium-capacity rail system | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Rapid KL | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | Gombak–Putra Heights | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Rapid Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Subang Depot | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Bombardier Innovia ART 200 & Metro 300 266 carriages; 2-car & 4-car trainsets Width: 2.65 m (8 ft 8 in) - narrow profile Length: 67.1 m (220 ft) & 33.7 m (111 ft) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 232,814 (January to 6 October 2023)[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 94.658 million (2019) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | Phase 1: Kelana Jaya - Pasar Seni 1 September 1998 Phase 2: Pasar Seni - Gombak 1 June 1999 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Last extension | Kelana Jaya - Putra Heights 30 June 2016 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 46.4 km (28.8 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Mostly elevated Subsurface station(s): Sri Rampai Underground station(s): Ampang Park - Masjid Jamek | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail + linear induction motor | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Alcatel/Thales SelTrac CBTC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The line is numbered 5 and coloured ruby on official transit maps.
History
Construction began in 15 February 1994, about the same time as construction of the Ampang Line. The tunnels were constructed by Hazama Corporation and Hyundai Engineering & Construction.[3] Operation commenced on 1 September 1998 between Subang Depot and Pasar Seni, with phase two, Pasar Seni to Terminal Putra, later starting on 1 June 1999.[4]
The line underwent a 17 km (10.6 mi) extension with construction from early 2010 through to 2016. With 13 new stations added to the line beyond the Kelana Jaya terminus, the new terminus is now at Putra Heights, where the line meets with the Sri Petaling Line.[5]
The Kelana Jaya Line was known as PUTRA LRT, with "PUTRA" standing for Projek Usahasama Transit Ringan Automatik Sdn Bhd (Automatic Light Transit Joint Venture Project), until the company was taken over by its current owner Prasarana Malaysia.
Chronology
- 15 February 1994 – Projek Usahasama Transit Ringan Automatik Sdn Bhd (PUTRA-LRT) is incorporated.
- 1 September 1998 – Section 1 from Subang Depot to Pasar Seni commences operations.
- 1 June 1999 – Section 2 from Pasar Seni to Terminal PUTRA (now known as Gombak) commences operations. The second section includes Malaysia's first underground railway.
- 26 April 2002 – Projek Usahasama Transit Ringan Automatik Sdn Bhd is wound up by the Kuala Lumpur High Court.
- 1 September 2002 – PUTRA-LRT comes under management of Syarikat Prasarana Negara (also known as Prasarana Malaysia) and renamed "Putraline" under the first phase of the restructuring of Kuala Lumpur's public transport system. Prasarana also takes over STAR-LRT and is renamed "Starline".
- November 2004 – Operational aspects of the two lines are transferred to the new government-owned Rapid KL under the second phase of the restructuring process. Ownership of their assets remains with Prasarana.
- July 2005 – Rebranding of the system from Putraline to the Kelana Jaya Line begins. Station signage is changed by 2006.
- 24 July 2006 – Failure of the back-up computer causes the line to stop functioning during the evening rush hour. Passengers are trapped in trains and some force open doors to get out.
- 29 August 2006 – The then-Malaysian Deputy Prime Minister Najib Abdul Razak announces that the line will be extended from Lembah Subang to Subang Jaya and USJ.
- 6 October 2006 – A "technical problem" causes a train to stall between Dato Keramat and Damai at 7am, causing a shut-down of the Masjid Jamek — Gombak LRT Station stretch. Normal service is restored by 5pm that day.
- 13 October 2006 – Prasarana signs an agreement with Bombardier HARTASUMA Consortium (BHC) for the purchase of 22 four-car sets with an option of an additional 13 train sets for RM1.2 billion. The new trains are targeted to be delivered by 2008.
- 12 December 2006 – An accident occurs during peak hour as a train was approaching Pasar Seni LRT station. The train stops abruptly as if it hit something. No casualties occur.
- 8 October 2007 – Prasarana purchases an additional 13 Advanced Rapid Transit (ART) MK II train sets (52 cars) for €71 million. Delivery is expected in 2010.[6]
- 27 July 2009 – The then-Malaysian Prime Minister Najib Abdul Razak announces that 35 new four-car trains will be operational by the end of 2012.[7]
- 15 September 2009 – Prasarana begins a 3-month public display of the proposed alignment of the extension (and the Sri Petaling Line extension) for feedback.[8][9]
- October 2009 – Test runs for the new four-car trains begin.[10] Passengers are not allowed to board these trains.
- 30 December 2009 – Three four-car trains officially begin service, while the remaining 32 four-car trains are gradually introduced into service through April 2011.[11]
- 24 December 2010 – Sri Rampai opens.
- 28 November 2011 – The Kelana Jaya and Ampang – Sri Petaling Lines are integrated with a single ticketing system.
- 2 December 2015 – New fare structure takes effect and the new 'Smart 7' Weekly and 'Smart 30' Monthly smart cards[12] are announced.
- 14 April 2016 – It is confirmed that the Kelana Jaya Line extension will be fully operational on 30 June 2016.[13]
- 30 June 2016 – The Kelana Jaya Line extension starts operations.
- 29 December 2016 – Prasarana launches the first new Bombardier Innovia Metro 300 trains, also known as KLAV.
- October 2017 – All 14 KLAV trains enter service.
Line information
Stations
The line runs from Putra Heights through Kelana Jaya to Gombak, serving the Subang Jaya and Petaling Jaya regions to the south; southwest and central Kuala Lumpur, and Kuala Lumpur City Centre to the centre; and low-density residential areas further north. At 46.4 km (28.8 mi) in length, it is one of the longest fully automated driverless metro lines in the world.
The stations are given in a north–south direction, consists primarily of elevated stops and a handful of underground and at-grade stations. Of the 37 stations, 31 are elevated, Sri Rampai lies at ground level, and five stops (Masjid Jamek, Dang Wangi, Kampung Baru, KLCC, and Ampang Park) are underground.
The stations, like those of the Ampang and Sri Petaling Lines, are styled in several types of architectural designs. Elevated stations, in most parts, were constructed in four major styles with distinctive roof designs for specific portions of the line. KL Sentral station, added later, features a design more consistent with the Stesen Sentral station building. Underground stations, however, tend to feature unique concourse layout and vestibules, and feature floor-to-ceiling platform screen doors to prevent platform-to-track intrusions. 22 stations (including two terminal stations and the five subway stations) use a single island platform, while 15 others use two side platforms. Stations with island platforms allow easy interchange between north-bound and south-bound trains without requiring one to walk down or up to the concourse level. The island platform at Putra Heights terminal station is shared with the Sri Petaling Line trains bound for Sentul Timur, allowing cross-platform line interchange at the station.
The stations were built to support disabled passengers, with elevators and wheelchair lifts alongside escalators and stairways between the levels. The stations have platform gaps smaller than 5 cm (2.0 in) to allow easy access for the disabled and wheelchair users. They are able to achieve this with:
- Tracks that are non-ballasted, lessening rail and train movements
- Trains that have direct rubber suspension, lessening train body movements
- Trains that do not rapidly run through stations
- Stations that have straight platforms
The stations on the Kelana Jaya Line are the earliest rapid transit stations in the Klang Valley designed to provide a degree of accessibility for handicapped users. In contrast, handicapped-friendly facilities for the Ampang and Sri Petaling Lines were installed beginning in 2012.
The stations have closed-circuit security cameras for security purposes.
List of stations
Code | Name | Image | Platform type | Position | Parking bays | Interchange/notes |
KJ1 | Gombak | Terminus (Island) | Elevated | MSPR: 1,441 |
Northern terminus. Formerly known as Terminal Putra.
| |
KJ2 | Taman Melati | Side | Parking by DBKL | |||
KJ3 | Wangsa Maju | Island | ||||
KJ4 | Sri Rampai | Side | Subsurface | Not available | ||
KJ5 | Setiawangsa | Island | Elevated | 125 | Proposed interchange with CC14 MRT Circle Line. | |
KJ6 | Jelatek | Side | 292 | |||
KJ7 | Dato' Keramat | Not available | ||||
KJ8 | Damai | Island | ||||
KJ9 | Ampang Park | Underground | Connecting station (without paid area integration) to PY20 MRT Putrajaya Line | |||
KJ10 | KLCC | By Suria KLCC and Avenue K management | Pedestrian access to MR6 Bukit Bintang and MR7 Raja Chulan for KL Monorail, and KG18A Pavilion Kuala Lumpur - Bukit Bintang for MRT Kajang line via a pedestrian walkway connecting the Kuala Lumpur Convention Centre and Pavilion Kuala Lumpur.
13 mins walk to KJ11 Kampung Baru via Saloma Bridge (behind Jalan Ampang Muslim Cemetery) which is accessible at Jalan Saloma (the road is beside Menara Public Bank). | |||
KJ11 | Kampung Baru | Not available | 14 mins walk to KJ10 KLCC via Saloma Bridge. | |||
KJ12 | Dang Wangi | Connecting station to MR8 Bukit Nanas for KL Monorail. | ||||
KJ13 | Masjid Jamek | Interchange station to AG7 SP7 LRT Ampang and Sri Petaling Lines. | ||||
KJ14 | Pasar Seni | Elevated |
Interchange station to KG16 MRT Kajang Line. Connecting station to KA02 Kuala Lumpur for KTM Seremban Line, KTM Port Klang Line and ETS KTM ETS via a pedestrian bridge across the Klang River. Bus hub to Puchong, Subang Airport, Petaling Jaya, Shah Alam and Subang Jaya. | |||
KJ15 | Red One–KL Sentral | Side | Parking By KL Sentral |
Interchange station, without paid area integration, to:
| ||
KJ16 | Bank Rakyat–Bangsar | Not available | ||||
KJ17 | Abdullah Hukum |
Interchange station, without paid area integration, to KD01 KTM Port Klang Line. Link-bridge access to KB01 Mid Valley for KTM Seremban Line via KL Eco City, The Gardens Mall & Mid Valley Megamall. | ||||
KJ18 | Kerinchi | |||||
KJ19 | Universiti | Island | RapidKL Bus T789 to Universiti Malaya and T788 to KB01 Mid Valley.
Proposed connecting station with CC30 MRT Circle Line. | |||
KJ20 | Taman Jaya | Side | ||||
KJ21 | Asia Jaya | Island | Parking by MBPJ | |||
KJ22 | Taman Paramount | Side | 68 | |||
KJ23 | Taman Bahagia | Parking by MPSJ | ||||
KJ24 | Kelana Jaya | Island | 482 |
Bus hub to KT3 PY41 Putrajaya Sentral (506), Subang Jaya (783), Sunway Pyramid (783) and Bandar Utama (506/802). | ||
KJ25 | Lembah Subang | Side | Not available | The station is located on top of the existing Lembah Subang depot reception track ramp. Feeder Bus T807 to KG07 Surian for the MRT Kajang Line. | ||
KJ26 | Ara Damansara | Island | 817 | |||
KJ27 | CGC–Glenmarie | 569 | Future interchange with SA07 LRT Shah Alam Line. | |||
KJ28 | Subang Jaya | Parking by KTMB |
Interchange station, without paid integration, to KD09 KS02 KTM Port Klang Line and Skypark Link. | |||
KJ29 | SS15 | Not available | ||||
KJ30 | SS18 | |||||
KJ31 | USJ7 | Interchange station with SB7 BRT Sunway Line. | ||||
KJ32 | Taipan | Side | ||||
KJ33 | Wawasan | |||||
KJ34 | USJ21 | 694 | ||||
KJ35 | Alam Megah | Island | 196 | |||
KJ36 | Subang Alam | 115 | ||||
KJ37 | Putra Heights | Terminus (Island & Side) | 452 | Southern terminus of both the LRT Kelana Jaya Line and LRT Sri Petaling Line. |
Gallery of stations
- The Universiti station 5 at night. It is one of the elevated stations in the system.
Extensions
On 29 August 2006, Malaysian Deputy Prime Minister Mohd Najib Abdul Razak announced that the western end would be extended to the suburbs of Subang Jaya (USJ and Putra Heights) to the south-west of Kuala Lumpur. The extension would be part of a RM10 billion plan to expand Kuala Lumpur's public transport network.
The expansion plan would also see the Sri Petaling Line extended to the suburbs of Puchong and the south-west of Kuala Lumpur. The plan also involved the construction of an entirely new line, tentatively called the Kota Damansara–Cheras line, running from Kota Damansara in the western portion of the city, to Cheras in the southeast of Kuala Lumpur.
As of August 2008, Syarikat Prasarana Negara was reportedly running land and engineering studies for the proposed extension.[14]
In September 2009, Syarikat Prasarana Negara began displaying the alignment of the proposed extensions over a 3-month period for feedback. The Kelana Jaya extension would have 13 new stations over 17 km from Kelana Jaya to Putra Heights. Construction was expected to commence in early 2010.[5][8][9][15]
In November 2010, Prasarana announced that it had awarded RM1.7 billion for first phase of the project. The winners included Trans Resource Corp Bhd for the Kelana Jaya Line extension. UEM Builders Bhd and Intria Bina Sdn Bhd were appointed as subcontractors for the fabrication and supply of segmental box girder jobs for the Kelana Jaya Line.[16]
Construction works on the Kelana Jaya Line and the Sri Petaling Line extension project were targeted to accelerate at the end of March 2011, with commencement of structural works, subject to approval from state government and local authorities.[17]
In 2014, completion of the extension was targeted for 2016.[18] On 14 April 2016, Prasarana Malaysia confirmed in a media release that the Kelana line extension would be fully operating on 30 June 2016.[13]
Rolling stock
2-car 1998 Innovia ART 200
The rolling stock, in use since the opening of the line in 1998, consists of 35 Innovia ART 200 trains[5][19] with related equipment and services supplied by the Bombardier Group and train electronics company Quester Tangent. They consist of two-electric multiple units, which serve as either a driving car or trailer car depending on the direction of travel. They are equipped with Linear Induction Motor (LIM) propulsion technology which allows for operation on tighter curves, with less noise and greatly reduced wheel and track wear. The plating in between the running rails is used for accelerating and decelerating the train; additionally, the reaction plate is semi-magnetised, which pulls the train along and helps it slow down.
The ART is completely automated and operates without drivers, stopping at stations for a limited amount of time. Nevertheless, manual override control panels are provided at each end of the trains for use in an event of an emergency. The technology is essentially identical to that of the Vancouver SkyTrain, which operates in very similar environments.
The interior of the ART, like its Ampang and Sri Petaling Lines' counterparts, consists of plastic seating aligned sideways towards the sides of the train, with one foldable seats for passengers at the end of the cars for wheelchair, and spacing in the middle for standing occupants. Since its launch in 1998, the ART rolling stock has remained relatively unchanged; only more holding straps have been added and the labeling has been modified from Putra-LRT to RapidKL. Some of the rolling stock has the majority of the seats removed for added passenger capacity during rush hours.
With the fleet being aged, a tender was released by Prasarana in 2023 for the disposal of 4 2-car trains.[20]
On 23 May 2023, two-car train Number 32 was sent to Megalift, which handled logistics for the train's relocation.[21][22] Train 32 was repurposed as a prop for disaster management training. It will form part of the simulation site at Pulau Meranti for the Malaysian Search & Rescue Team (SMART) to train on.[23]
4-car 2009 Innovia ART 200
On 13 October 2006, Syarikat Prasarana Negara signed an agreement with Bombardier HARTASUMA Consortium for the purchase of 88 Innovia ART 200 cars (22 train sets of 4-cars), with an option for another 13, for RM1.2 billion.[24] The 22 train sets, initially targeted to be delivered from August 2008 onwards, would have four cars each, boosting the carrying capacity of the fleet by 1,500 people. On 7 October 2007, Syarikat Prasarana Negara exercised its option to purchase an additional 52 Innovia ART 200 cars (13 train sets of 4-cars) for €71 million. The first trains were expected to enter revenue service in 2010.[25]
Although the trains were expected to arrive in August 2008, the manufacturer delayed the delivery to November 2008. Rapid Rail said that the trains will only be usable by September 2009 after having sufficient rolling stocks, power line upgrades, and safety testing.[26] Transport Minister Datuk Seri Ong Tee Keat said in Parliament that the new trains would begin operations by December 2009.[27] However, in July 2009, Prime Minister Najib Tun Razak announced that the four-car trains will only be fully operational by the end of 2012.[7]
On 30 December 2009, 3 of the 35 new four-car trains entered commercial service.[28] In addition to increased capacity up to 950 passengers per trip, new features included seat belts for wheelchair-bound travelers, door alarm lights for hearing impaired, and more handles for standing commuters.[29]
2-coach Mid-Life Refurbishment
In June 2012, several 2-car Innovia ART 200 trains underwent major refurbishment work done by from Hartasuma Consortium.[30] Known as Mid-Life Refurbishments (MLR), these refurbishments include an updated livery, changes of the LED headlights and interior lights, and interior refurbishments such as newer seat design and the installation of additional infotainment systems. Facilities were also added, such as openable windows during emergencies. The first MLR set, TR08, entered service on 15 October 2014.[31]
In 2017, another MLR project included two 2-car sets permanently coupled to form a 4-car set, known as the 'married train'. Interiors were similar to the previous MLR sets with added TV panels at each end of the sets, dynamic route map displays and walkable through gangways between the two sets. The first coupled train, TR87 (previously TR22 and TR27), entered service on 29 December 2017, with the remaining undergoing delivery in stages.[32]
KLAV Innovia Metro 300
Under the Kuala Lumpur Additional Vehicle programme, the first new generation Bombardier Innovia Metro 300 started service on 29 December 2016.[33] Each driverless train features a new design for the end caps, a curved sidewall structure, and a larger, more spacious interior. All trains come in a four-car configuration with each car accommodating up to 220 passengers. Low energy consumption is achieved through a combination of lightweight aluminium car shells and a LIM propulsion system. Furthermore, the vehicle's regenerative braking enables the reuse of energy released during braking. The aisles and walk-through gangways are also wider when compared with the previous fleet. In addition, the trainsets are equipped with 16 cameras on board, infotainment LCD screens, dynamic route maps, better air-conditioning and bigger windows. With the new trains, the line could increase its capacity by 20 to 30 percent.[34][35][36][37]
An additional 27 new trainsets are being delivered. As of August 2020, three have arrived with two of them under installation. They were delivered for the first time by air using an Antonov An-124, one of the largest cargo planes in existence. The rest of the fleet are to be delivered by ship.[38] Since 27 June 2021, two trainsets labelled Sets 92 and 93 were spotted to be in service on the line.[note 1][39] As of 14 September 2023, three trains in addition to the eight introduced previously are in operation.[note 2][41]
4-coach Mid-Life Refurbishment
Due to recent developments in numerous breakdowns involving the 4-coach ART 200 fleet,[42][43][44] it was revealed by RapidKL that mid-life refurbishment is to be done on the 34 trains.[note 3] According to former Transport Minister Wee Ka Siong, faulty or dated equipments included tachometers, electronic units and antennas. The most serious contributor to faults were from tachometers, accounting up to 47%. This refurbishment was expected to cost RM 800 million in May 2022.[47]
Fleet details
The Kelana Jaya Line fleet consists of the following models:
Innovia Series | Generation | Number built | Formation | Manufacturers | Notes |
---|---|---|---|---|---|
INNOVIA ART 200 | 414 Series | 35 trainsets | 2-cars | Bombardier Transportation | In operation since 1998. Starting 2014, being refurbished into 10 trainsets of 2-cars and 12 trainsets of 4-cars (leaving one trainset unrefurbished). |
818 Series | 35 trainsets | 4-cars | In operation since the end of 2009[28] | ||
INNOVIA Metro 300 | KLAV14 | 14 trainsets | In operation since the end of 2016 | ||
KLAV27 | 27 trainsets | In operation | |||
On order.[48] Delivery to start in July 2023. |
The old RM10 banknote of the 1996 series featured an image of the 2-car Bombardier Innovia ART 200 Kelana Jaya Line train.
Below are listed the Bombardier Innovia ART 200 refurbished 2-car set or known as MLR (Mid-Life Refurbishment).
All trainsets data are as follows (updated September 2023):[40]
Set No. | Innovia Series | Status | Car Configuration |
---|---|---|---|
Set 02 | ART 200 | Temporarily grounded | Refurbished 2-car |
Set 03 | ART 200 | In operation | Refurbished 2-car |
Set 04 | ART 200 | In operation | Refurbished 2-car |
Set 05 | ART 200 | In operation | Refurbished 2-car |
Set 06 | ART 200 | Temporarily grounded | Refurbished 2-car |
Set 08 | ART 200 | In operation | Refurbished 2-car |
Set 09 | ART 200 | In operation | Refurbished 2-car |
Set 10 | ART 200 | In operation | Refurbished 2-car |
Set 11 | ART 200 | Temporarily grounded | Refurbished 2-car |
Set 12 | ART 200 | Temporarily grounded | Refurbished 2-car |
Below are listed the original Bombardier Innovia ART 200 2-car set livery:
Set No. | Innovia Series | Status | Car Configuration |
---|---|---|---|
Set 07 | ART 200 | Retired | 2-car |
Set 13 | ART 200 | Retired | 2-car |
Set 14 | ART 200 | Unknown | 2-car |
Set 17 | ART 200 | Temporarily grounded (renumbered as 15) | 2-car |
Set 18 | ART 200 | Temporarily grounded | 2-car |
Set 19 | ART 200 | Temporarily grounded | 2-car |
Set 20 | ART 200 | Temporarily grounded | 2-car |
Set 21 | ART 200 | Temporarily grounded | 2-car |
Set 23 | ART 200 | Temporarily grounded (less active) | 2-car |
Set 24 | ART 200 | Temporarily grounded (renumbered as 01) | 2-car |
Set 25 | ART 200 | Temporarily grounded (renumbered as 07) | 2-car |
Set 26 | ART 200 | Unknown marriage | 2-car |
Set 28 | ART 200 | Unknown marriage | 2-car |
Set 30 | ART 200 | Temporarily grounded (renumbered as 13) | 2-car |
Set 31 | ART 200 | Unknown marriage | 2-car |
Set 32 | ART 200 | Retired | 2-car |
Set 33 | ART 200 | Temporarily grounded (renumbered as 16) | 2-car |
Set 34 | ART 200 | Unknown marriage | 2-car |
Set 35 | ART 200 | Retired | 2-car |
Below are listed the Innovia ART 200 4-car original set:
Set No. | Innovia Series | Status | Car Configuration |
---|---|---|---|
Set 36 | ART 200 | In operation | 4-car |
Set 37 | ART 200 | In operation | 4-car |
Set 38 | ART 200 | Unknown (Pending mid-life refurbishment) | 4-car |
Set 39 | ART 200 | In operation | 4-car |
Set 40 | ART 200 | Unknown (collided with set 81) | 4-car |
Set 41 | ART 200 | Pending mid-life refurbishment | 4-car |
Set 42 | ART 200 | Unknown | 4-car |
Set 43 | ART 200 | Pending mid-life refurbishment | 4-car |
Set 44 | ART 200 | In operation | 4-car |
Set 45 | ART 200 | Pending mid-life refurbishment | 4-car |
Set 46 | ART 200 | In operation | 4-car |
Set 47 | ART 200 | In operation | 4-car |
Set 48 | ART 200 | In operation | 4-car |
Set 49 | ART 200 | In operation | 4-car |
Set 50 | ART 200 | In operation | 4-car |
Set 51 | ART 200 | In operation | 4-car |
Set 52 | ART 200 | In operation | 4-car |
Set 53 | ART 200 | In operation | 4-car |
Set 54 | ART 200 | In operation | 4-car |
Set 55 | ART 200 | In operation | 4-car |
Set 56 | ART 200 | In operation | 4-car |
Set 57 | ART 200 | In operation | 4-car |
Set 58 | ART 200 | Unknown (Pending mid-life refurbishment) | 4-car |
Set 59 | ART 200 | In operation | 4-car |
Set 60 | ART 200 | In operation | 4-car |
Set 61 | ART 200 | In operation | 4-car |
Set 62 | ART 200 | In operation | 4-car |
Set 63 | ART 200 | In operation | 4-car |
Set 64 | ART 200 | In operation | 4-car |
Set 65 | ART 200 | In operation | 4-car |
Set 66 | ART 200 | In operation | 4-car |
Set 67 | ART 200 | In operation | 4-car |
Set 68 | ART 200 | Unknown (pending Mid-life refurbishment) | 4-car |
Set 69 | ART 200 | Pending mid-life refurbishment | 4-car |
Set 70 | ART 200 | In operation | 4-car |
Below are listed the newer Innovia Metro 300 4-car set (also known as KLAV):
Set No. | Innovia Series | Generation | Status | Car Configuration |
---|---|---|---|---|
Set 72 | Metro 300 | KLAV14 | In operation | 4-car (Keluarga Malaysia livery) |
Set 73 | Metro 300 | KLAV14 | In operation | 4-car |
Set 74 | Metro 300 | KLAV14 | In operation | 4-car |
Set 75 | Metro 300 | KLAV14 | In operation | 4-car |
Set 76 | Metro 300 | KLAV14 | In operation | 4-car |
Set 77 | Metro 300 | KLAV14 | In operation | 4-car |
Set 78 | Metro 300 | KLAV14 | In operation | 4-car |
Set 79 | Metro 300 | KLAV14 | In operation | 4-car |
Set 80 | Metro 300 | KLAV14 | In operation | 4-car |
Set 81 | Metro 300 | KLAV14 | Unknown (collided with set 40) | 4-car |
Set 82 | Metro 300 | KLAV14 | In operation | 4-car |
Set 83 | Metro 300 | KLAV14 | In operation | 4-car |
Set 84 | Metro 300 | KLAV14 | In operation | 4-car |
Set 85 | Metro 300 | KLAV14 | In operation | 4-car |
Set 92 | Metro 300 | KLAV27 | In operation | 4-car |
Set 93 | Metro 300 | KLAV27 | In operation | 4-car |
Set 94 | Metro 300 | KLAV27 | In operation | 4-car |
Set 95 | Metro 300 | KLAV27 | In operation | 4-car |
Set 96 | Metro 300 | KLAV27 | In operation | 4-car |
Set 97 | Metro 300 | KLAV27 | In operation | 4-car |
Set 98 | Metro 300 | KLAV27 | In operation | 4-car |
Set 99 | Metro 300 | KLAV27 | In operation | 4-car |
Set 27 | Metro 300 | KLAV27 | In operation | 4-car |
Set 28 | Metro 300 | KLAV27 | In operation | 4-car |
Set 33 | Metro 300 | KLAV27 | In operation | 4-car |
Below are the prototype of the four-car refurbished, combining two sets of two-cars together into one:
Set No. (Combination) | Innovia Series | Status | Car Configuration |
---|---|---|---|
Set 87 (22+27) | ART 200 | Unknown | 4-car |
Set 88 (01+16) | ART 200 | Unknown | 4-car |
Set 89 (15+29) | ART 200 | Unknown | 4-car |
Set 90 | ART 200 | Temporarily grounded | 4-car |
Set 91 | ART 200 | Temporarily grounded | 4-car |
Accidents and incidents
On 4 March 2018, a high-voltage power line broke and fell on the roof of the Kelana Jaya station, causing the roof to be blown off. Trains on both routes pass through the station while it is closed for repairs. The Kelana Jaya station reopened a few days later.
On 2 May 2022, a train braked suddenly in the tunnel between Dang Wangi and Kampung Baru while travelling towards Gombak at around 11:20 p.m. The train eventually continued towards KLCC, with passengers being asked to disembark. No injuries were reported.[49]
In November 2022, a series of service disruptions caused by faulty automatic train control (ATC) device(s) forced trains to move slower and stop longer than usual, especially between Kelana Jaya and KLCC stations.
On 5 November 2022, a fault occurred between KLCC and Ampang Park stations. RapidKL resolved the problem by updating the software of the faulty ATC device, and train service resumed as usual on 6 November 2022. The problem resurfaced again between KLCC and Kelana Jaya stations on the evening of 7 November 2022. Stations between Damai and Lembah Subang were closed at night to resolve the ATC stability issues.[50] However, the same problem recurred on the evening of 8 November 2022, leading to a 4-day suspension.[51] Prasarana carried out the repairs, including finding the root cause of the problem.[52] After the subsequent stability tests under the supervision of technical experts from Thales Group and Land Public Transport Agency, the Ampang Park-Kelana Jaya stretch re-opens on 14 November 2022, two days earlier than expected.[53]
2021 underground collision
On 24 May 2021, at 8:45 pm MYT, train number 81 and 40 collided with each other between the KLCC and Kampung Baru LRT stations. Both trains were traveling in opposite directions on the same track and collided head-on. One of the trains was under maintenance and was being driven manually on the wrong track, while the other was automatically driven from KLCC. The cab ends which collided were carriages 181 and 240. A total of 213 people were on board the automated train. Preliminary reports indicated that no fewer than 166 people were injured, 47 of which were serious;[54] no deaths were reported, but 64 people requiring hospitalization, with 6 in critical condition. The case is under investigation as of 25 May 2021. This is the only and most severe incident involving a collision between two trains to occur along the Kelana Jaya line since it first opened in 1999.[55]
Ridership
In 2002, the line carried its 150 millionth passenger, with an average of passengers daily.[56] Today, it carries over 250,000 passengers per day[2] and over 350,000 per day during national events.[57]
Kelana Jaya Line Ridership[58][59] | |||
---|---|---|---|
Year | Ridership | Remarks | |
2022 | 55,015,765 | ||
2021 | 25,123,614 | Total lockdown | |
2020 | 45,307,182 | COVID-19 pandemic | |
2019 | 94,657,974 | ||
2018 | 87,216,597 | ||
2017 | 83,585,412 | ||
2016 | 79,002,829 | ||
2015 | 82,144,674 | ||
2014 | 81,971,322 | ||
2013 | 78,702,931 | ||
2012 | 71,574,675 | ||
2011 | 68,398,561 | ||
2010 | 58,037,633 | ||
2009 | 55,580,190 | ||
2008 | 58,168,337 | ||
2007 | 56,965,258 | ||
2006 | 56,747,136 | ||
2005 | 60,290,467 | ||
2004 | 57,729,971 | ||
2003 | 50,254,365 | ||
2002 | 54,423,246 | ||
2001 | 52,478,951 | ||
2000 | 44,542,496 | ||
1999 | 17,252,259 | ||
Notes and references
Notes
- There was no explicit mention of when these trains were officially serving passengers, so the closest date cited in public news sites was mentioned.
- Although news outlets quoted 3 trains to be in service on 14 September 2023, observations, however were different where the first train number 33 debutted on 17 August 2023.[40]
- Various published sources quoted differing numbers from May 2022 to the present (in 2023), but the most recent source quoted 34.[45][46] The only train to be excluded would be Train 40 due to the major collision in 2021.
References
- "Kelana Jaya Line". RapidKL. Archived from the original on 11 May 2015. Retrieved 21 April 2015.
- "Ridership". Rapid Rail Performance Update. RapidKL. 6 October 2023. Archived from the original on 14 October 2023. Retrieved 15 October 2023.
- "Light Railway Transit (LRT) of Kuala Lumpur, Tunnel Work". Archived from the original on 20 February 2017. Retrieved 9 May 2017.
- Meng Yew Choong (31 August 2015). "Klang Valley urban rail service turns 10". The Star Online. Archived from the original on 25 April 2017. Retrieved 8 May 2019.
- Thousands to Benefit from LRT Extension Archived 22 September 2009 at the Wayback Machine
- "Bombardier - Home". www.bombardier.com. Archived from the original on 8 February 2012. Retrieved 30 May 2020.
- "Targets set for the six Key Result Areas". The Star. 28 July 2009. Archived from the original on 31 July 2009.
- "New LRT Line Extensions on Display from Tomorrow". The Malaysian Insider. 14 September 2009. Archived from the original on 16 September 2009.
- "Public May Give Feedback on LRT Extension Project". The New Straits Times. 14 September 2009. Archived from the original on 22 September 2009. Retrieved 15 September 2009.
- "Four-carriage trains provide double capacity". Malay Mail. 8 October 2009. Archived from the original on 1 December 2009.
- "Four-star ride on LRT with longer coaches". The Star. 31 December 2009. Archived from the original on 8 June 2011.
- "Introduces Fare Differentiation Between Cash And Cashless To Encourage Savings". myRapid. 2 November 2015. Archived from the original on 22 November 2015.
- "LRT Kelana Jaya Line Extension Opening As Scheduled On June 30". myRapid. 14 April 2016. Archived from the original on 19 April 2016.
- "Two extra LRT lines being studied". The Star. 21 August 2008. Archived from the original on 24 August 2008.
- "RM7bn LRT Extension". The Star. 15 September 2009. Archived from the original on 26 March 2012. Retrieved 30 May 2020.
- "Prasarana awards RM1.7bil jobs for LRT extension". The Star. 27 November 2010. Archived from the original on 12 June 2012. Retrieved 30 May 2020.
- "Construction Works for LRT Extension Project to Commence". Rapid KL. 11 March 2011. Archived from the original on 5 September 2012.
- "Information on the Kelana Jaya Line Extension | LRT Line Extension Project Website". Archived from the original on 2 July 2014. Retrieved 29 June 2014.
- Railway Technology – Kuala Lumpur Driverless Metro System, Malaysia Archived 27 October 2008 at the Wayback Machine
- "DISPOSAL OF FOUR (4) SETS OF USED 2-CAR KELANA JAYA LINE TRAINS BASED ON 'AS IS WHERE IS' BASIS". Tenders. Prasarana. Archived from the original on 6 April 2023. Retrieved 16 October 2023.
- "Megalift Malaysia Sdn Bhd". Facebook. 30 May 2023. Retrieved 22 September 2023.
- VincentKoh LUMCFan (23 May 2023). "RIP Train 32: Observations on that fateful day on LRT Kelana Jaya Line". YouTube. Retrieved 22 September 2023.
- "JKR Daerah Sepang (Ministry of Works Sepang branch)". Facebook (in Malay). 30 May 2023. Retrieved 15 October 2023.
- "Prasarana Homepage – Prasarana in RM1.2b deal for 35 LRT trains". Prasarana. 20 March 2007. Archived from the original on 20 March 2007. Retrieved 6 February 2018.
- "Bombardier Consortium Receives a 71 Million Euro Order for 52 Additional Advanced Rapid Transit Cars in Kuala Lumpur, Malaysia". Bombardier. 7 October 2007. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- "New trains for Kelana Jaya line will only be usable by Sept 2009". New Straits Times. 4 September 2008. Archived from the original on 6 September 2008.
- Bernama (5 November 2009). "Ong: Six new LRT trains to run next month". The Edge. Archived from the original on 8 November 2009.
- "Four-star Ride on LRT with Longer Coaches". The Star. 31 December 2009. Archived from the original on 8 June 2011. Retrieved 21 October 2022.
- Nuradzimmah Daim (1 January 2010). "In for a better ride with new four-car coaches". New Straits Times.
- "Refurbishment The Existing 35 Sets Of 2-Car Trains For Kelana Jaya Line - TDA Berhad". Retrieved 8 August 2021.
- Latiff, Rozanna (17 October 2014). "Refurbished trains project vibrant image | New Straits Times". NST Online. Retrieved 8 August 2021.
- "Prasarana begins rolling out 'married' LRT train sets - Business News | The Star Online". 29 December 2017. Archived from the original on 29 December 2017. Retrieved 8 August 2021.
- "Bombardier's INNOVIA Metro 300 Enters Service in Kuala Lumpur". 29 December 2016. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- "Driverless INNOVIA Metro 300 fleet enters service in Kuala Lumpur". Eurotransportmagazine.com. 3 January 2017. Archived from the original on 28 June 2017. Retrieved 22 May 2017.
- "New improved trains brought in for LRT Kelana Jaya line - Community | The Star Online". Thestar.com.my. 16 May 2016. Archived from the original on 14 June 2017. Retrieved 22 May 2017.
- "New fleet to increase passenger capacity by 20% on Kelana Jaya line - Community | The Star Online". Thestar.com.my. 21 January 2016. Archived from the original on 3 January 2017. Retrieved 22 May 2017.
- "Bombardier consortium delivers first Innovia Metro 300 train for Kuala Lumpur light metro". Railway Technology. 18 January 2016. Archived from the original on 31 August 2017. Retrieved 22 May 2017.
- "Prasarana targets over 10pc passenger increase for LRT Kelana Jaya line, says chairman". Malay Mail. 25 August 2020. Retrieved 9 September 2020.
- "Two New State-of-the-art Trains Now Running of LRT Kelana Jaya Line". 27 June 2021. Archived from the original on 17 June 2022. Retrieved 17 June 2022.
- "TranSPOT - LRT KJL". Retrieved 22 September 2023.
- "Loke: Kelana Jaya LRT Line Peak Hour Train Frequency to be at Three Minutes Next Year". News Straits Times. 14 September 2023. Retrieved 22 September 2023.
- "Technical Issues Cause Disruptions on LRT Kelana Jaya Line". The Star. 10 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- "LRT Train Breaks Down at KL Sentral". The Star. 20 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- "Pengguna Terjejas Akibat Masalah Teknikal Sebuah Tren di Stesen KL Sentral" (PDF) (Press release) (in Malay). RapidKL. 10 September 2022. Archived (PDF) from the original on 22 May 2023. Retrieved 22 May 2023.
- "CONSULTING ENGINEER SERVICES FOR THE MIDLIFE REFURBISHMENT, RECTIFICATION, OVERHAUL AND OTHER RELATED WORKS (MLR) OF EXISTING THIRTY-FOUR (34) SETS OF 4-CAR 818 TRAIN'S SERIES FOR KELANA JAYA LINE". Tenders. Prasarana. Archived from the original on 14 March 2022. Retrieved 15 October 2023.
- "Mid-Life Refurbishment of 818 Trains – carry out refurbishment, overhaul and upgrading of 818 train’s sub-systems
Involve 34 trains (818 trains)
Programme Duration: January 2024 – January 2029
Status : Tendering Stage" "Rapid Rail Performance Update - Reliability". 12 May 2023. Archived from the original on 22 May 2023. Retrieved 22 May 2023. - "RM800m for 'Mid-life Refurbishment' of Kelana Jaya LRT Line, Says Transport Minister". Malay Mail. 25 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
- Artymiuk, Simon (27 July 2022). "More new trains for Kuala Lumpur's Kelana Jaya line". International Railway Journal. Retrieved 5 November 2022.
- David, Adrian (3 May 2022). "Aidilfitri jolt for LRT passengers". New Straits Times. Retrieved 3 May 2022.
- Meng, Yew Choong (8 November 2022). "Kelana Jaya LRT line service back to normal". The Star (Malaysia). Retrieved 8 November 2022.
- "Kelana Jaya LRT line suffers another disruption Nov 8 evening". The Star (Malaysia). 8 November 2022. Retrieved 8 November 2022.
- "16 stations on Kelana Jaya line closed for a week". Free Malaysia Today. 9 November 2022. Retrieved 9 November 2022.
- "Dr Wee: Kelana Jaya LRT Line back in operation from 6am Nov 14". The Star (Malaysia). 13 November 2022. Retrieved 14 November 2022.
- "LRT train mishap: 47 commuters seriously injured in accident on LRT Kelana Jaya line". The Star. Retrieved 24 May 2021.
- Chin, Emmanuel Santa Maria (24 May 2021). "Transport minister: 166 wounded including 47 seriously hurt in LRT train crash near KLCC | Malay Mail". www.malaymail.com. Retrieved 24 May 2021.
- Kelana Jaya line (formerly known as PUTRA line) Archived 14 December 2007 at the Wayback Machine
- "RapidKL Puts Marketing Retail Space on Fast Lane". 9 October 2007. Archived from the original on 16 March 2008. Retrieved 5 January 2008.
- "Prasarana's Ridership". 14 January 2023. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
- "Statistic of Rail Transport". Ministry of Transport (Malaysia). Archived from the original on 9 January 2022. Retrieved 12 February 2022.