Kudlu Gate metro station

Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Around this metro station holds the Hotel Ekaa Keys by Rivido and Pai Internationals Warehouse in Bengaluru. This metro station is stated to be operational around December 2023.[1][2][3]

Kudlu Gate
Namma Metro station
Final stages of Kudlu Gate metro station
General information
LocationHosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Coordinates12.88992°N 77.63929°E / 12.88992; 77.63929
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Platform numbers (TBC)
Tracks(TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2023 (December 2023) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Hongasandra Yellow Line
(Future Service by December 2023)
Singasandra
towards Bommasandra
Location

Station layout

Station Layout (TBC)

Kudlu Gate track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Singasandra
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road next station is Hongasandra
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.