Manjunathanagara metro station

Manjunatha Nagara is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. This metro station is stated to be operational around December 2023.[1][2]

Manjunatha Nagara
Namma Metro station
General information
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpenedDecember 2023 (December 2023)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Chikkabidarakallu
towards Madavara
Green Line
(extension by December 2023)
Nagasandra
Location

Station layout

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Nagasandra
Platform 1
Northbound
Towards ← Madavara next station is Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.