Link bus rapid transit

Link, previously known as Rochester Rapid Transit and the Downtown Circulator, is a bus rapid transit line planned for downtown Rochester, Minnesota. The 2.6 mile route would connect downtown Rochester, Mayo Clinic's downtown campus, Mayo Clinic's Saint Mary's campus, University of Minnesota Rochester, and a new 13-acre transit-oriented development at the western terminus. Construction is expected to begin 2022 or 2023, with operations commencing 2025.[1][2]

Link
Logo for Link
Overview
OperatorRochester Public Transit
StatusPlanning
Route
Route typeBus rapid transit
LocaleRochester, Minnesota
StartWest Transit Village
Via2nd Street SW (Phase 1)
Broadway Avenue (Phase 2)
EndDowntown Rochester (Phase 1)
East Transit Village (Phase 2)
Length2.6 mi (4.2 km) (Phase 1)
(Additional 1 mi (1.6 km) planned in Phase 2)
Stations8 (Planned)
(4 more planned in Phase 2)
Service
LevelDaily
FrequencyEvery 5 minutes peak
Every 10 to 20 minutes non-peak
Journey time13 minutes
Operates5:00 am–11:00 pm
 {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} 

History

On May 4, 2020, the Rochester City Council unanimously approved a multi-phased approach to construction. The full system would be built in two phases: Phase 1 would be 2.6 miles (4.2 kilometres) built on Second Street from West Transit Village to Civic District station; Phase 2 would extend the line approximately 1 mile (1.6 kilometres) south on Broadway Avenue to East Transit Village.[3] The phased approach of the project would raise the cost-effectiveness rating with the Federal Transit Administration from "medium-high" to "high", making the project more competitive for funding through the Small Starts program. The phased approach also gives the city and Olmsted County additional time to plan the redevelopment of the former Seneca Foods site into East Transit Village.[4] On Wednesday October 21, 2020, project leaders announced that engineering, traffic, and environmental analyses would begin.[5]

Phase 1 of the project is expected to cost $114 million, with local funding coming from the State of Minnesota, Olmsted County Transit Aid, state provided Destination Medical Center funds, and the City of Rochester. On August 28, 2020, the City of Rochester submitted a Small Starts grant application to the Federal Transit Administration to fund 49% of Phase 1's cost.[6][5][1] Phase 2 will be developed with Olmsted County for future grant submittal.[7][3]

The complete line is expected to cost $203 million. Estimated daily ridership on Phase 1 of the project is 9,925 daily riders, with the complete line seeing an estimated 11,850 daily riders.[4][8][9]

On September 13, 2021, Rochester officials unveiled the Link brand accompanied with a mockup station. The mockup, situated at the future Civic Center Station site on 2nd Street at 3rd Avenue SE, demonstrates bus rapid transit features such as the shelter layout, off-board fare collection, real-time signage, and an 80 ft (24 m) long level platform. The site also features renderings of the line's seven stations and more information about the project.[10][11]

In early February 2022, Rochester City Council announced they would review potential changes to the line after receiving public feedback. The proposed changes would upgrade amenities at the two primary stations, Saint Mary's Transit Center and 2nd Avenue Station, and extend the line south along 3rd Avenue SE with an additional station near 6th Street. The changes under review would an additional year for environmental review and would bring the cost of Phase 1 to $146.8 million. The additional $32.8 million would be covered by the Federal Transit Administration, increasing their share of the project costs from 49% to 60%.[12]

Route

The 2.6 mile route begins at Mayo Clinic's west lot at 2nd Street and 23rd Avenue SW. On August 25, 2020, the DMC Corporation Board of Directors voted unanimously to modify the DMC's boundaries to include the westernmost portion of the route, making the project eligible receive DMC funding. The route continues east along 2nd Street in dedicated bus lanes, stopping at five enhanced stations along 2nd Street.[7] After Broadway Avenue, the route would make a clockwise loop with two additional stops at 2nd Street & 3rd Avenue SE and 4th Street & Broadway Avenue before returning down 2nd Street the opposite direction.[13]

Link will use new 60 ft articulated battery electric buses with three-doors and will be operated by Rochester Public Transit.[5][14]

References

  1. Bunge, Mike (August 31, 2020). "Rochester wants more than $50 million for rapid transit project". KIMT News. KIMT. Retrieved September 22, 2020.
  2. Gannon, Sarah (June 23, 2020). "Plans for new rapid transit system in Rochester progressing". KTTC. Retrieved September 22, 2020.
  3. "New Rapid Transit for a Growing, Equitable Rochester". www.rochestermn.gov. Retrieved September 22, 2020.
  4. "Council addresses budget, modifies transit plan". Med City Beat. Med City Beat. May 5, 2020. Retrieved September 25, 2020.
  5. Octavio, Miguel (October 21, 2020). "Rochester Rapid Transit Project driving ahead, boosting local economy". ABC 6 NEWS. Retrieved December 18, 2020.
  6. "Transit News | Rochester, MN". www.rochestermn.gov. August 31, 2020. Retrieved September 22, 2020.
  7. Peterson, Randy (August 27, 2020). "DMC boundary extended for transit project". Post Bulletin. Post Bulletin. Retrieved September 22, 2020.
  8. Petersen, Randy (August 14, 2020). "Will council take next steps for Rochester transit village and circulator project?". Post-Bulletin. www.masstransitmag.com. Retrieved September 25, 2020.
  9. "Alternatives Evaluation Report: Rochester Downtown Circulator". City of Rochester. July 2020. Retrieved September 25, 2020.
  10. David, Kim (September 13, 2021). "Public Invited To Check Out Rochester's Future Transit Station". News Talk 1340 KROC-AM. Retrieved September 14, 2021.
  11. "Model of rapid transit system station being shown off downtown". Med City Beat. September 13, 2021. Retrieved September 14, 2021.
  12. Petersen, Randy (February 3, 2022). "MN: Proposed Rochester rapid transit changes would add millions to price tag". Post Bulletin. Mass Transit. Retrieved February 4, 2022.
  13. "New Rapid Transit for a Growing, Equitable Rochester: Transit-Oriented Development Planning Study". SRF Consulting. August 2020. Retrieved September 22, 2020.
  14. Petersen, Randy. "Rochester launches brand for rapid transit project with model of proposed station". Post-Bulletin. Yahoo! News. Retrieved September 14, 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.