Red Line (St. Louis MetroLink)

The Red Line is the older and longer line of the MetroLink light rail service in Greater St. Louis. It serves 29 stations across three counties and two states.

Red Line
Red Line train at Union Station
Overview
OwnerBi-State Development Agency
LocaleGreater St. Louis, MissouriIllinois, U.S.
Termini
Stations29
Service
TypeLight rail
SystemSt. Louis MetroLink
Operator(s)Metro Transit
History
OpenedJuly 31, 1993 (1993-07-31)
Technical
Line length38 mi (61 km)
CharacterElevated, subway, at-grade
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line, 750 V DC
Route diagram

Lambert Airport Terminal 1
Lambert Airport Terminal 2
I-70.svg I-70
North Hanley
UMSL North
UMSL South
Rock Road
Wellston
Delmar Loop
Forest Park–DeBaliviere
Central West End
Cortex
Grand
Union Station
Civic Center
Amtrak
Stadium
8th & Pine
Convention Center
I-44.svg I-44
Laclede's Landing
East Riverfront
5th & Missouri
Emerson Park
Joyner-Kersee Center
Washington Park
Fairview Heights
Memorial Hospital
Swansea
Belleville
College
Shiloh–Scott
MidAmerica St. Louis Airport (via Shiloh–Scott station)
MidAmerica St. Louis Airport

History

The westbound platform at Convention Center on the Red and Blue lines.

Transit planning along the Airport/Central Corridor began as early as 1971, when it was selected as the region's primary target for further study. In 1983, funding was approved to evaluate five mode alternatives, which culminated in a 1984 draft environmental impact statement. After a series of public hearings, the East–West Gateway Council of Governments, a council composed of the region's local governments, adopted light rail as the preferred mode alternative.[1]:203

The project's capital expense budget was $287.7 million (equivalent to $577 million in 2021 dollars), which covered design and engineering, procurement, construction, and testing.[1]:201

Arts in Transit

In the initial design phase of MetroLink, Metro's Arts in Transit program commissioned a group of artists to design unique bridge piers for MetroLink viaducts. Collaborating with architects and engineers, the artists designed the arched supports that reflect an inverted version of the arch motif used throughout the MetroLink system design. The bridge pier system is a signature of MetroLink design and appears in the subsequent St. Clair and Cross County alignments.[2]

In 2008, the Arts in Transit program commissioned a work for the alignment along Interstate 70 near Lambert Airport. Titled St. Louis Rhythm and created by Richard Elliot, it was made using roadway reflectors on 16 concrete Jersey barriers that are activated by the headlights of passing cars.[3]

In 2011, another Arts in Transit commission was installed on the shared alignment near Interstate 64 on the bridge over Vandeventer Avenue. Titled Blue Train and created by Clark Wiegman, this cubist locomotive represents the opening eight bars of the melody of “St. Louis Blues.” During the day, this piece appears as an oversized locomotive spewing a trail of notes or an unfurling piano roll. At night, it becomes a geometric abstraction about linear dynamism and the implied form of the bridge punching through the surrounding ambient light.[4]

2022 Flooding

On July 26, 2022, the Delmar Loop and Forest Park-DeBaliviere stations were flooded in a catastrophic flash flooding event that shut the system down for close to 72 hours.[5] Damage to the stations, rolling stock, ballast, signaling infrastructure, fiber optics, etc. is estimated to be $40 million.[6]

On September 5, 2022, Metro announced new schedules to accommodate repairs being made to the system. It is estimated repairs could take six months or longer.[7] Currently, the Red Line is operating at all of its 29 stations but with restricted speeds in some flood-damaged sections.[8]

Route

A Red Line train at Civic Center in downtown St. Louis.

The 38-mile (61 km) Red Line alignment begins at Lambert St. Louis International Airport, making stops at the Terminal 1 and Terminal 2 stations. It then proceeds through Kinloch before making a stop at the North Hanley station near Bel-Ridge. It makes 2 stops (UMSL North & UMSL South) at the University of Missouri St. Louis located in Normandy. After departing UMSL, trains divert south onto the former Wabash/Norfolk & Western Railroad's Union Depot line that once brought passenger trains from Ferguson to Union Station. It then travels into Pagedale stopping at the Rock Road station and then at Wellston's namesake station on Plymouth Street. From here, the Red Line crosses the St. Louis City/County boundary line at Skinker Boulevard, making a stop at the Delmar Loop station which serves the popular Delmar Loop area and is located just below the original Wabash Railroad's Delmar Station building. At the following station, Forest Park-DeBaliviere, the Red Line meets the Blue Line. From this station the two services share a track alignment with each other until the Blue Line terminates at the Fairview Heights station in Illinois.

Shared Alignment

The platforms at Stadium in downtown St. Louis.

From the Forest Park-DeBaliviere station, the Red and Blue lines share the same set of tracks for the next 16 stations.[9] Continuing east, the Central West End and Cortex stations serve the popular Central West End neighborhood, Washington University Medical Center and Cortex Innovation Community. The Grand station transfers with the busy #70 MetroBus line and serves Saint Louis University and its hospital. Next, the Union Station, Civic Center, Stadium, 8th & Pine, Convention Center, and Laclede's Landing stations serve downtown St. Louis and its many popular attractions. Crossing the historic Eads Bridge into Illinois, the line serves the East Riverfront, 5th & Missouri, Emerson Park, Jackie Joyner-Kersee Center, and Washington Park stations in East St. Louis, Illinois. At the next station, Fairview Heights, the Blue Line terminates and the Red Line continues south to Belleville, Illinois to its terminus at the Shiloh-Scott station located at Scott Air Force Base.

Stations

From Lambert Airport to Shiloh-Scott (west to east)

Station Transfer City/town served County Opening date
Lambert Airport Terminal 1 Edmundson St. Louis County June 25, 1994[10]
Lambert Airport Terminal 2 Woodson Terrace December 23, 1998[11]
North Hanley Carsonville July 31, 1993[12]
UMSL–North Normandy
UMSL–South
Rock Road Pagedale
Wellston Wellston
Delmar Loop Independent city of St. Louis
Forest Park–DeBaliviere Blue
Central West End
Cortex July 31, 2018[13]
Grand July 31, 1993[12]
Union Station
Civic Center
Stadium
8th & Pine
Convention Center
Laclede's Landing
East Riverfront East St. Louis St. Clair County May 14, 1994[14]
5th & Missouri July 31, 1993[12]
Emerson Park May 5, 2001[15]
Jackie Joyner-Kersee Center
Washington Park
Fairview Heights Fairview Heights
Memorial Hospital Belleville
Swansea Swansea
Belleville Belleville
College
Shiloh–Scott Shiloh June 23, 2003[16]

Projects in progress

MidAmerica Airport

In 2019, the St. Clair County Transit District was awarded $96 million in Illinois infrastructure funding to build a 5.2-mile (8.4 km) extension of the Red Line from Shiloh-Scott to MidAmerica St. Louis Airport in Mascoutah.[17] This extension will include two 2.6-mile (4.2 km) segments, double and single-track segments, along with a passenger station at the end of the alignment at the airport.[18] Design work was completed in the summer of 2022 and a request for proposals was released that November. Construction on the expansion is expected to begin in 2023 with Metro beginning operations in 2025.[19][20]

Infrastructure Improvements

In 2023, Metro began a system-wide rehabilitation program that will last up to two years.[21] Work on the Red Line will include the rehabilitation of the Union Station and downtown subway tunnels, including the Laclede's Landing, Convention Center and 8th & Pine subway stations.[22] Elsewhere, curve tracks, catenary wire, system conduit, staircases and retaining walls are to be upgraded or replaced.[23] Three Red Line stations are to receive platform rehabilitations:  Jackie Joyner-Kersee Center, Rock Road and Wellston.[23]

In 2024, Metro expects to complete upgrades to the Supervisory Control Automated Data Acquisition (SCADA) and Public Address/Customer Information (PA/CIS) systems. The upgraded SCADA/PA/CIS will operate as an integrated system that monitors and controls MetroLink operations and will allow Metro to provide real-time arrival information to passengers, such as live displays at stations.[23]

Previous proposals

These extensions were proposed when Metro released its Moving Transit Forward plan in 2010.[24] Most are now defunct as regional leadership has said their current focus is on the City and North County corridors and not previous expansion proposals.[25]

St. Charles Corridor

Lambert Airport to St. Charles County: Possible plans to expand MetroLink 16 to 20-miles (26-32 km) from Lambert Airport northwestward to St. Charles County were abandoned after St. Charles County voters rejected a sales tax in 1996 to fund an extension; subsequently, all MetroBus service was ended. If the extension was funded, the route would have used the Old St. Charles Bridge (now demolished) as a crossing over the Missouri River to the City of St. Charles, St. Peters, and O'Fallon. It is not likely to be considered in the future as St. Charles County residents still largely oppose light rail expansion.[26]

Madison County Corridors

East St. Louis to Alton/Edwardsville: A study in 2005 was performed to investigate the potential costs, ridership, and impacts of extending Metrolink into Madison County, Illinois. According to the East-West Gateway Council of Governments, there are two recommended alignments for Madison County. Both of the alignments will start from the 5th & Missouri station out of East St Louis in St. Clair County to Granite City, Collinsville, Glen Carbon, Edwardsville, East Alton, Wood River, and Alton in Madison County, Illinois 21 to 23-miles (34-37 km) away. The alignments would have split in Madison, Illinois. In order to plan any Madison County extensions, Metro will have to collaborate with Madison County Transit.[27]

See also

References

  1. Campion, Douglas R.; Wischmeyer, Jr., Oliver W. (1988). Infrastructure Rehabilitation and Technology Sharing in Bringing LRT to St. Louis (PDF) (Report) (221 ed.). Transportation Research Board. Retrieved October 14, 2019.
  2. "Bridge Piers". Arts in Transit, Inc. Retrieved October 3, 2022.
  3. "St. Louis Rhythm". Arts in Transit, Inc. Retrieved October 3, 2022.
  4. "Blue Train". Arts in Transit, Inc. Retrieved October 3, 2022.
  5. Lindsey (August 16, 2022). "MetroLink Flood Damage Update". metrostlouis.org. Retrieved September 12, 2022.
  6. Schrappen, Colleen. "MetroLink to resume full service, but cost for flood repairs could double". STLtoday.com. Retrieved September 12, 2022.
  7. Lindsey (September 1, 2022). "MetroLink Changes Starting September 5: Blue Line Service to Operate Between Shrewsbury and Forest Park". metrostlouis.org. Retrieved September 12, 2022.
  8. "Special MetroLink Operations". metrostlouis.org. Retrieved September 25, 2022.
  9. "MetroLink Schematic Map" (PDF). Metro St. Louis.
  10. "Clinton to Spend Friday in St. Louis". The Daily Journal. Flat River, Missouri. June 24, 1994. p. 4. Retrieved April 15, 2021 via Newspapers.com. open access
  11. "MetroLink's East Terminal Station Opens Today at Airport After Seven-Month Delay". The St. Louis Post-Dispatch. December 23, 1998. p. B1. Retrieved April 15, 2021 via Newspapers.com. open access
  12. Lindecke, Fred W. (August 1, 1993). "Area Riders Throng to Try MetroLink". The St. Louis Post-Dispatch. pp. 1A, 6A. Retrieved April 15, 2021 via Newspapers.com. open access
  13. "Metro Marks Opening of Cortex Station". The St. Louis Post-Dispatch. August 1, 2018. p. A12. Retrieved April 15, 2021 via Newspapers.com. open access
  14. Goodrich, Robert (April 27, 1994). "E. St. Louis Starring in MetroLink". The St. Louis Post-Dispatch. p. B1. Retrieved April 15, 2021 via Newspapers.com. open access
  15. Leiser, Ken (April 30, 2001). "MetroLink Extension Opens This Weekend With Parking to Spare". The St. Louis Post-Dispatch. p. A9. Retrieved April 15, 2021 via Newspapers.com. open access
  16. Sutin, Phil (June 19, 2003). "Changes in Schedule Will Affect MetroLink and 22 Bus Routes". The St. Louis Post-Dispatch. p. N2. Retrieved April 15, 2021 via Newspapers.com. open access
  17. Schlinkmann, Mark. "Illinois to pay for long-sought MetroLink extension to MidAmerica Airport". STLtoday.com. Retrieved September 20, 2022.
  18. "Trajectory for Transit in 2022 Points to Need for Continued Collaboration". January 19, 2022. Retrieved February 2, 2022.
  19. "When will MetroLink extension to MidAmerica Airport be complete? How much will it cost? - MidAmerica St. Louis Airport (BLV) | Mascoutah, IL". flymidamerica.com. July 14, 2021. Retrieved September 20, 2022.
  20. Menn, Mackenzie (November 21, 2022). "MetroLink Expansion in Illinois is on Track". St. Clair County Transit District. Retrieved January 30, 2023.
  21. "MetroLink Improvements". Metro Transit – Saint Louis. Retrieved September 26, 2023.
  22. "Transit Infrastructure Improvements". Metro Transit – Saint Louis. Retrieved September 26, 2023.
  23. "MetroLink Improvement Projects". Metro Transit – Saint Louis. Retrieved September 26, 2023.
  24. "Moving Transit Forward" (PDF). Metro Transit.
  25. Schlinkmann, Mark. "St. Louis County back in picture for north-south MetroLink expansion". STLtoday.com. Retrieved September 11, 2022.
  26. Uptergrove, Kate. "St. Louis County to explore MetroLink expansion; St. Charles County says no". MidRiversNewsMagazine.com. Retrieved September 25, 2022.
  27. "Madison County Light Rail Feasibility Study Final Report" (PDF). East-West Gateway Council of Governments.
Template:Attached KML/Red Line (St. Louis MetroLink)
KML is not from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.