Delhi Metro
The Delhi Metro is a mass rapid transit (MRT) system serving Delhi and its adjoining satellite cities such as Ghaziabad, Faridabad, Gurugram, Noida and Bahadurgarh, in the National Capital Region of India.[10]
Delhi Metro | |||
---|---|---|---|
Overview | |||
Owner | Delhi Metro Rail Corporation | ||
Locale | National Capital Region (NCR) | ||
Transit type | Rapid transit | ||
Number of lines | 10[1] | ||
Line number | |||
Number of stations | 256[lower-alpha 1] | ||
Daily ridership | 71.03 lakh (7.15 million) (2022–23)[2] | ||
Annual ridership | 179 crore (1.79 billion) (2019)[lower-alpha 2][3] | ||
Key people | Manoj Joshi (Chairman) Vikas Kumar (Managing Director)[4] | ||
Headquarters | Metro Bhawan, Barakhamba Road, New Delhi 110001 | ||
Website | delhimetrorail.com | ||
Operation | |||
Began operation | 24 December 2002 | ||
Operator(s) | Delhi Metro Rail Corporation | ||
Number of vehicles | 336 trains[5] | ||
Train length | 6/8 coaches[6] | ||
Headway | 3 minutes | ||
Technical | |||
System length | 350.42 km (217.74 mi)[lower-alpha 3] | ||
Track gauge |
| ||
Electrification | 25 kV 50 Hz AC overhead catenary | ||
Average speed | 45 km/h [7][8] | ||
Top speed | 120 km/h [9][8] | ||
|
The Delhi Metro network consists of 10 colour-coded lines[1] serving 256 stations[lower-alpha 1] with a total length of 350.42 kilometres (217.74 mi).[lower-alpha 3] It is the largest and busiest metro rail system in India, and the second oldest after the Kolkata Metro. The system has a mix of underground, at-grade, and elevated stations using both broad-gauge and standard-gauge tracks. The Delhi Metro operates over 4,300 trips daily.[12]
The construction of the Delhi Metro started in 1998, and the first elevated section (Shahdara to Tis Hazari) on the Red Line opened on 25 December 2002. The first underground section (Vishwa Vidyalaya – Kashmere Gate) on the Yellow Line opened on 20 December 2004.[13] The development of the network was divided into phases. Phase I with 3 lines was completed by 2006, and Phase II in 2011. Phase III was mostly complete in 2021, except a small extension of the Airport line which was opened in 2023.[14] Construction under Phase IV was formally started on 30 December 2019.[15]
Delhi Metro Rail Corporation Limited (DMRC), a company with equal equity participation from the Government of India and the Government of Delhi, built and operates the Delhi Metro.[16][17] DMRC was certified by the United Nations in 2011 as the first metro rail and rail-based system in the world to get carbon credits for reducing greenhouse gas emissions, reducing carbon emission levels in the city by 630,000 tonnes every year.[6]
The Delhi Metro also has interchanges with the Rapid Metro Gurgaon (with a shared ticketing system) and Noida Metro. On 22 October 2019, DMRC took over the operations of the financially troubled Rapid Metro Gurgaon.[18] The annual ridership of Delhi Metro was 179 crore (1.79 billion) in 2019.[lower-alpha 2][3]
It will also have interchange with Delhi Meerut RRTS which is India’s fastest Urban Regional Transit system to date.
History
Background
The concept of mass rapid transit for New Delhi first emerged from a traffic and travel characteristics study that was carried out in the city in 1969.[19] Over the next several years, many official committees by a variety of government departments were commissioned to examine issues related to technology, route alignment, and governmental jurisdiction.[19] In 1984, the Urban Arts Commission came up with a proposal for developing a multi-modal transport system, which would consist of constructing three underground mass rapid transit corridors as well as augmenting the city's existing suburban railway and road transport networks.[20]
While extensive technical studies and the raising of finance for the project were in progress, the city expanded significantly resulting in a two-fold rise in population and a five-fold rise in the number of vehicles between 1981 and 1998.[20] Consequently, traffic congestion and pollution soared, as an increasing number of commuters took to private vehicles with the existing bus system unable to bear the load.[19] An attempt at privatizing the bus transport system in 1992 merely compounded the problem with inexperienced operators plying poorly maintained, noisy and polluting buses on lengthy routes, resulting in long waiting times, unreliable service, extreme overcrowding, unqualified drivers, speeding and reckless driving[21] which even led to road accidents. To rectify the situation, the Government of India under Prime Minister H.D. Deve Gowda[22] and the Government of Delhi jointly set up a company called the Delhi Metro Rail Corporation (DMRC) on 3 May 1995, with Elattuvalapil Sreedharan as the managing director.[23] Sreedharan handed over the charge as managing director of DMRC to Mangu Singh on 31 December 2011.
Initial construction
Physical construction work on the Delhi Metro started on 1 October 1998.[24] After the previous problems experienced by the Kolkata Metro, which was badly delayed and 12 times over budget due to "political meddling, technical problems and bureaucratic delays", DMRC is a special-purpose organisation vested with great autonomy and powers to execute this gigantic project involving many technical complexities, under a difficult urban environment and within a very limited time frame. DMRC was given full powers to hire people, decide on tenders, and control funds.[25] The DMRC then hired the Hong Kong MTRC as a technical consultant on rapid transit operation and construction techniques.[26] As a result, construction proceeded smoothly, except for one major disagreement in 2000, where the Ministry of Railways forced the system to use 5 ft 6 in (1,676 mm) broad gauge despite the DMRC's preference for standard gauge.[27]
The first line of the Delhi Metro, the Red Line, was inaugurated by Atal Bihari Vajpayee, the then Prime Minister of India on 24 December 2002.[28] The Delhi Metro became the second underground rapid transit system in India, after the Kolkata Metro, when the Vishwa Vidyalaya–Kashmere Gate section of the Yellow Line opened on 20 December 2004. This underground line was inaugurated by the then Prime Minister Manmohan Singh. The first phase of the project was eventually completed in 2006,[29][30] on budget and almost three years ahead of schedule, an achievement described by Business Week as "nothing short of a miracle".[31]
Phase I
Within the boundaries of Delhi state, a 64.75-kilometer (40.23-mile) long network comprising 59 stations was constructed, encompassing the initial sections of the Red, Yellow, and Blue lines. These stations were gradually opened to the public between December 25, 2002, and November 11, 2006.
Phase 1 Network[32] | ||||||
---|---|---|---|---|---|---|
No. | Line Name | Stations | Length (km) |
Terminals | Opening Date | |
1 | Red Line | 6 | 8.35 | Shahdara | Tis Hazari | 25 December 2002 |
4 | 4.87 | Tis Hazari | Inderlok | 3 October 2003 | ||
8 | 8.84 | Inderlok | Rithala | 31 March 2004 | ||
2 | Yellow Line | 4 | 4.06 | Vishwa Vidyalaya | Kashmere Gate | 20 December 2004 |
6 | 6.62 | Kashmere Gate | Central Secretariat | 3 July 2005 | ||
3 | Blue Line | 22 | 22.74 | Dwarka | Barakhamba Road | 31 December 2005 |
6 | 6.47 | Dwarka Sector 9 | 1 April 2006 | |||
3 | 2.80 | Barakhamba Road | Indraprastha | 11 November 2006 | ||
Total | 59 | 64.75 |
Phase II
A total of 123.3 kilometres (76.6 mi) long network with 86 stations and the following 10 new routes and extensions was built, out of which seven routes are extension spurs of the Phase I network, three were new colour-coded lines and three routes connect to other cities (Yellow Line to Gurgaon, Blue Line to Noida and Blue Line to Ghaziabad) of the national capital region, outside the physical limits of Delhi state, in the states of Haryana and Uttar Pradesh. At the end of Phases I and II, the cumulative total length of the network became 188.05 km (116.85 mi) with 145 stations progressively becoming operational from 4 June 2008 to 27 August 2011.[6]
Phase 2 Network[32] | ||||||
---|---|---|---|---|---|---|
No. | Line Name | Stations | Length (km) |
Terminals | Opening Date | |
1 | Red Line | 3 | 2.86 | Shahdara | Dilshad Garden | 4 June 2008 |
2 | Yellow Line | 5 | 6.38 | Vishwa Vidyalaya | Jahangirpuri | 4 February 2009 |
9 | 15.82 | HUDA City Centre | Qutab Minar | 21 June 2010 | ||
1 | Chhatarpur | 26 August 2010 | ||||
9 | 11.76 | Qutab Minar | Central Secretariat | 3 September 2010 | ||
3 | Blue Line | 1 | 2.17 | Indraprastha | Yamuna Bank | 10 May 2009 |
10 | 12.85 | Yamuna Bank | Noida City Centre | 12 November 2009 | ||
2 | 2.28 | Dwarka Sector 9 | Dwarka Sector 21 | 30 October 2010 | ||
4 | Blue Line Branch | 6 | 6.25 | Yamuna Bank | Anand Vihar | 27 January 2010 |
2 | 2.26 | Anand Vihar | Vaishali | 14 July 2011 | ||
5 | Green Line | 14 | 14.19 | Inderlok | Mundka | 2 April 2010 |
2 | 3.41 | Ashok Park Main | Kirti Nagar | 27 August 2011 | ||
6 | Violet Line | 13 | 15.34 | Central Secretariat | Sarita Vihar | 3 October 2010 |
3 | 4.82 | Sarita Vihar | Badarpur Border | 14 January 2011 | ||
Airport Express | 4 | 22.91 | New Delhi | Dwarka Sector 21 | 23 February 2011 | |
2 | Dhaula Kuan & Delhi Aerocity | 15 August 2011 | ||||
Total | 86 | 123.30 |
Phase III
Phase-I (Red, Yellow and Blue lines) and phase II (Green, Violet, and Airport Express lines) focused on adding new radial lines to expand the network. To further reduce congestion and improve connectivity, Phase III included 8 extensions to the existing lines as well as building two ring lines (Pink and Magenta lines) along with the Grey line. It has 28 underground stations, 3 new lines, and 7 route extensions, totaling 160.07 kilometres (99.46 mi), with a cost of ₹410.079 billion (US$5.1 billion).[33][34] The 3 new lines of Phase-III are the Pink Line running on Inner Ring Road (Line 7), the Magenta Line running on Outer Ring Road (Line 8) & the Grey Line connecting Dwarka and Najafgarh (Line 9).[1]
Work on Phase III started in 2011,[37][38] with 2016 being the planned deadline.[39] More than 20 tunnel boring machines were used simultaneously to expedite the work;[40] however, the actual work for the original was completed in March 2019 (except for a small stretch due to non-availability of land).[41] Later, certain small extensions to the Delhi Metro were added as part of the Phase–III project. Phase III was expected to be completed by the end of 2020 but construction was delayed due to the COVID-19 pandemic. It was finally completed on 18 September 2021 with the opening of the Grey Line extension from Najafgarh to Dhansa Bus Stand.[42] An extension of Airport Line to Yashobhoomi Dwarka Sector - 25 metro station was notified later and it was completed on 17 September 2023.[43]
Driverless operations on the 38 km (24 mi) long Magenta line began on 28 December 2021, making it the first driverless metro line of Delhi Metro and India's first driverless metro.[44] On 25 November 2021, the 59 km (37 mi) long Pink Line also began driverless train operations. With this, the total stretch of DMRC's network under driverless operations now stands at close to 97 km (60 mi), putting Delhi Metro in fourth position globally among such networks, marginally behind Kuala Lumpur.[45]
The expected daily ridership of the whole network of all phases, after the completion of Phase-III, was estimated at 53.47 lakh passengers. However, the actual ridership of DMRC was 27.79 lakh only (2019–20), i.e. 51.97 percent of the projected ridership. The actual ridership of the Phase III corridors was 4.38 lakh only as against the projected ridership of 20.89 lakh in 2019–20, which is a deficit of 79.02 percent.[46][47] The communication-based train control (CBTC) being used in Phase-III trains enables trains to run at a short headway of 90 seconds, although the actual headway between trains is kept much higher because of the relatively low demand on the new corridors.[48] Keeping the short headway and other constraints in mind, DMRC changed its decision to build 9-car-long stations for new lines and instead opted for shorter stations which can accommodate 6-car trains.[49]
Construction accidents
On 19 October 2008, a launching gantry and a part of the overhead Blue Line extension under construction in Laxmi Nagar, East Delhi, collapsed and fell on passing vehicles underneath. Workers were using a crane to lift a 400-tonne concrete span of the bridge when the gantry collapsed along with a 34-metre-long (112 ft) span of the bridge on top of a Blueline bus, killing the driver and a labourer.[50]
On 12 July 2009, a section of a bridge collapsed while it was being erected at Zamrudpur, near East of Kailash, on the Central Secretariat – Badarpur corridor. Six people died and 15 were injured.[51] The following day, on 13 July 2009, a crane that was removing the debris collapsed, and with a bowling pin effect collapsed two other nearby cranes, injuring six.[52] On 22 July 2009, a worker at Ashok Park Metro station was killed when a steel beam fell on him.[53] Over a hundred people, including 93 workers, have died since work on the metro began in 1998.[54]
On 23 April 2018, five people were injured when an iron girder fell off the elevated section of a Metro rail structure being constructed at the Mohan Nagar intersection in Ghaziabad. A car, an auto rickshaw, and a motorbike were also damaged in the accident.[55]
Network
The Delhi Metro has been undergoing construction in phases. Phase I consisted of 59 stations and 64.75 km (40.23 mi) of route length,[56] of which 13.0 km (8.1 mi) is underground and 52.0 km (32.3 mi) surface or elevated.[57] The inauguration of the Dwarka–Barakhamba Road corridor of the Blue Line marked the completion of Phase I in October 2006.[58] Phase II of the network consists of 123.3 km (76.6 mi) of route length and 86 stations,[56] and is fully completed, with the first section opened in June 2008 and the last line opened in August 2011.[59] Phase-III consists of 109 stations, 3 new lines and 7 route extensions, totaling 160.07 km (99.46 mi),[56] with a cost of ₹410.79 billion (US$5.1 billion)[33] and was mostly completed on 5 April 2019, except for a small section of the Pink Line between the Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations[60] as well as the Grey Line extension from Najafgarh to Dhansa Bus Stand,[61] which opened on 6 August 2021 and 18 September 2021, respectively. Phase IV project's routes with 6 lines totaling 103.93 km (64.58 mi) were finalized in July 2015. Out of this, 61.679 km (38.326 mi) across 3 lines (priority corridors) with 45 stations was approved by the Government of India for construction on 7 March 2019. The Silver Line's length was increased in October 2020, making the entire project 65.1 km (40.5 mi) long. It is planned to be completed by 2025.[62][63]
Delhi Metro: present network | |||||||||
---|---|---|---|---|---|---|---|---|---|
Line No. | Line Name | First operational[1] | Last extension[1] | Stations[11] | Length (km)[11] |
Terminals | Rolling stock[64] | Track gauge (mm) | |
1 | Red Line | 2002-12-24 | 2019-03-08 | 29 | 34.55 | Shaheed Sthal | Rithala | 33 trains, 197 coaches | 1676 |
2 | Yellow Line | 2004-12-20 | 2015-11-10 | 37 | 49.02 | Samaypur Badli | HUDA City Centre | 55 trains, 438 coaches | |
3 | Blue Line | 2005-12-31 | 2019-03-09 | 50 | 56.11 | Noida Electronic City | Dwarka Sector 21 | 64 trains, 507 coaches | |
4 | 2010-01-07 | 2011-07-14 | 8 | 8.51 | Yamuna Bank | Vaishali | |||
5 | Green Line | 2010-04-03 | 2022-03-29 | 24 | 28.78 | Inderlok | Brigadier Hoshiyar Singh | 20 trains, 80 coaches | 1435 |
2011-08-27 | – | Ashok Park Main | Kirti Nagar | ||||||
6 | Violet Line | 2010-10-03 | 2018-11-19 | 34 | 46.34 | Kashmere Gate | Raja Nahar Singh | 38 trains, 227 coaches | |
Airport Express Line | 2011-02-23 | 2023-09-17 | 7 | 22.91 | New Delhi | Yashobhoomi - Dwarka Sector 25 | 6 trains, 36 coaches | ||
7 | Pink Line | 2018-03-14 | 2021-08-06 | 38 | 59.24 | Majlis Park | Shiv Vihar | 42 trains, 251 coaches | |
8 | Magenta Line | 2017-12-24 | 2018-05-29 | 25 | 37.46 | Botanical Garden | Janakpuri West | 25 trains, 152 coaches | |
9 | Grey Line | 2019-10-04 | 2021-09-18 | 4 | 5.19 | Dwarka | Dhansa Bus Stand | 3 trains, 17 coaches | |
2002-12-24 | 2023-09-17 | 256 | 350.42 | 286 trains, 1905 coaches |
Lines
Red Line (Line 1)
The Red Line was the first line of the Metro to be opened and connects Rithala in the west to Shaheed Sthal (New Bus Adda) in the east, covering a distance of 34.55 kilometres (21.47 mi).[65] It is partly elevated and partly at grade and crosses the Yamuna River between Kashmere Gate and Shastri Park stations.[66] The inauguration of the first stretch between Shahdara and Tis Hazari on 24 December 2002 caused the ticketing system to collapse due to the line being crowded to four times its capacity by citizens eager to have a ride.[67][68] Subsequent sections were inaugurated from Tis Hazari – Trinagar (later renamed Inderlok) on 4 October 2003,[69] Inderlok – Rithala on 31 March 2004, and Shahdara – Dilshad Garden on 4 June 2008.[70] The red line has interchange stations, at Kashmere Gate with the Yellow Line and Violet Line, at Inderlok with the Green Line & at Netaji Subhash Place & Welcome with the Pink Line. In the future the red line will have an interchange with the Blue Line at Mohan Nagar. Beginning 24 November 2013, a total of six-coach trains were eventually commissioned on the Red Line.[71] On 8 March 2019, an extension of the line from Dilshad Garden to Shaheed Sthal(New Bus Adda) was opened to the public. In November 2022, Delhi Metro introduced a set of two eight-coach trains on its Red Line, which were converted from the existing fleet of 39 six-coach trains.[72]
Yellow Line (Line 2)
The Yellow Line was the second line of the Metro and was the first underground line to be opened on the Delhi Metro.[73] It runs for 49 kilometres (30 mi) from north to south and connects Samaypur Badli with HUDA City Centre in Gurgaon. The northern and southern parts of the line are elevated, while the central section which passes through some of the most congested parts of Delhi is underground. The first underground section of Delhi Metro between Vishwa Vidyalaya and Kashmere Gate opened on 20 December 2004, and the subsequent sections of Kashmere Gate – Central Secretariat opened on 3 July 2005, and Vishwa Vidyalaya – Jahangirpuri on 4 February 2009.[70] This line also possesses the country's second deepest Metro station[74] at Chawri Bazar, situated 25 metres (82 ft) below ground level.[75]
On 21 June 2010, an additional stretch from Qutab Minar to HUDA City Centre was opened, initially operating separately from the mainline. However, Chhatarpur station on this line opened on 26 August 2010. Due to delays in acquiring the land for constructing the station, it was constructed using prefabricated structures in a record time of nine months and is the only station in the Delhi Metro network to be made completely of steel.[76][77] The connecting link between Central Secretariat and Qutub Minar opened on 3 September 2010.[78]
On 10 November 2015, the line was further extended between Jahangirpuri and Samaypur Badli in Outer Delhi.[79] Interchanges are available with the Red Line and Kashmere Gate ISBT at Kashmere Gate, Blue Line at Rajiv Chowk, Violet Line at Kashmere Gate & Central Secretariat, Airport Express at New Delhi, Pink Line at Azadpur & Dilli Haat - INA, Magenta Line at Hauz Khas, Rapid Metro Gurgaon at Sikanderpur and with the Indian Railways network at Chandni Chowk and New Delhi.[80][81]
The Yellow Line is the first line of Delhi Metro which has phased out all four coach trains with six and eight-coach configurations. The Metro Museum at Patel Chowk metro station, the only museum about metro railway in South Asia, is a collection of display panels, historical photographs and exhibits, tracing the genesis of the Delhi Metro.[82] The museum was opened on 1 January 2009.[74]
Blue Line (Line 3 & Line 4)
The Blue Line was the third line of the Metro to be opened and the first to connect areas outside Delhi.[83] Mainly elevated and partly underground,[84] it connects Dwarka Sub City in the west with the satellite city of Noida in the east, covering a distance of 56.61 kilometres (35.18 mi).[83] The first section of this line between Dwarka and Barakhamba Road was inaugurated on 31 December 2005, and subsequent sections opened between Dwarka – Dwarka Sector 9 on 1 April 2006, Barakhamba Road – Indraprastha on 11 November 2006, Indraprastha – Yamuna Bank on 10 May 2009, Yamuna Bank – Noida City Centre on 12 November 2009, and Dwarka Sector 9 – Dwarka Sector 21 on 30 October 2010.[70] This line crosses the Yamuna River between Indraprastha and Yamuna Bank stations,[66] and has India's second extradosed bridge across the Northern Railways mainlines near Pragati Maidan.[85]
A branch of the Blue line, inaugurated on 8 January 2010, takes off from Yamuna Bank station and runs for 6.25 kilometres (3.88 mi) up to Anand Vihar in east Delhi.[86] It was further extended up to Vaishali which was opened to the public on 14 July 2011.[87] A small stretch of 2.76 kilometres (1.71 mi) from Dwarka Sector 9 to Dwarka Sector 21 was inaugurated on 30 October 2010.[88] On 9 March 2019, a 6.67 km (4.14 mi) extension of the line from Noida City Centre to Noida Electronic City was opened for public by Prime Minister Narendra Modi.[89] Interchanges are available with the Noida Sector 51 station of Aqua Line (Noida Metro) at Noida Sector 52 station, Yellow Line at Rajiv Chowk station,[84] Green Line at Kirti Nagar, Violet Line at Mandi House, Airport Express at Dwarka Sector 21, Pink Line at Rajouri Garden, Mayur Vihar Phase-I, Karkarduma & Anand Vihar, Magenta Line at Janakpuri West & Botanical Garden and with the Indian Railways network and Interstate Bus Station (ISBT) at Anand Vihar station, which connects with Anand Vihar Railway Terminal and Anand Vihar ISBT.[90] In the future it will have an interchange with the Red Line at Mohan Nagar.
Green Line (Line 5)
Opened in 2010, Green Line (Line 5) is the fifth line of the Delhi Metro network and the first line on standard gauge, as opposed to previous broad gauge lines. It runs between Inderlok (a station on the Red Line) and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station on the Blue Line. The completely elevated line, built as part of Phase II of the Delhi Metro runs mostly along the busy NH 10 route in West Delhi. The line consists of 24 stations including an interchange station covering a total length of 29.64 km (18.42 mi). This line also has the country's first standard-gauge maintenance depot at Mundka.[91]
The line was opened in two stages, with the 15.1 km (9.4 mi) Inderlok – Mundka section opening on 3 April 2010 and the 3.5 km (2.2 mi) Kirti Nagar – Ashok Park Main branch line on 27 August 2011. On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union Government approved an extension of the Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km (6.95 mi) metro stretch has seven stations at Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma, Bahadurgarh City and Brigadier Hoshiyar Singh between Mundka and Bahadurgarh. This stretch was opened on 24 June 2018. Interchanges are available with Red Line at Inderlok, Blue Line at Kirti Nagar and Pink Line at Punjabi Bagh West.
Violet Line (Line 6)
The Violet Line is the sixth line of the Metro to be opened, and the second standard-gauge corridor after the Green Line. The 47-kilometre-long (29 mi) line connects Raja Nahar Singh in Ballabgarh via Faridabad to Kashmere Gate in New Delhi, with 26 km (16 mi) being overhead and the rest underground. The first section between Central Secretariat and Sarita Vihar was inaugurated on 3 October 2010, just hours before the inaugural ceremony of the 2010 Commonwealth Games, and connects the Jawaharlal Nehru Stadium, which was the venue for the opening and closing ceremonies of the event.[92] Completed in just 41 months, it includes a 100-metre-long (330 ft) bridge over the Indian Railways mainlines and a 167.5-metre-long (550 ft) cable-stayed bridge across an operational road flyover and connects several hospitals, tourist attractions, and a major industrial estate along its route. Services are provided at intervals of 5 min.[92][93] An interchange with the Yellow Line is available at Central Secretariat through an integrated concourse. On 14 January 2011, the remaining portion from Sarita Vihar to Badarpur was opened for commercial service, adding three new stations to the network and marking the completion of the line.[94]
The section between Mandi House and Central Secretariat was opened on 26 June 2014. After that, a 971-metre (3,186 ft) section between ITO and Mandi House was opened on 8 June 2015. A 14 km (8.7 mi) extension southwards till Escorts Mujesar in Faridabad was inaugurated by Prime Minister Narendra Modi on 6 September 2015.[95] All the nine Metro stations of the Badarpur – Escorts Mujesar (Faridabad) section of Delhi Metro's Phase 3, have been awarded the highest possible rating (platinum) for adherence to green building norms, by the Indian Green Building Council (IGBC), which has devised a rating mechanism for Metro stations and buildings on a scale of platinum, gold, silver etc. for following the green building specifications. The awards for these stations were given to DMRC's Managing Director Mangu Singh by P C Jain, Chairperson of IGBC in the presence of DMRC's directors and senior officials on 10 September 2015.[96]
Currently, the Faridabad corridor of Delhi Metro Violet Line is the longest metro corridor outside of Delhi, consisting of 11 stations and the total length of corridor being 17 km (11 mi).[97] On 28 May 2017, the ITO – Kashmere Gate corridor of the Delhi Metro was formally flagged off for passenger services by the Union Minister of Urban Development, Venkaiah Naidu and the Chief Minister of Delhi, Arvind Kejriwal. This section which runs underground is popularly known as the Heritage Line.[98] Interchanges are available with Red Line at Kashmere Gate, Yellow Line at Kashmere Gate & Central Secretariat, Blue Line at Mandi House, Pink Line at Lajpat Nagar & Magenta Line at Kalkaji Mandir.
Airport Express Line
The Airport Express line runs for 22.7 km (14.1 mi) from New Delhi Railway Station to Dwarka Sector 21, linking the Indira Gandhi International Airport. The line was operated by Delhi Airport Metro Express Pvt. Limited (DAMEL), a subsidiary of Reliance Infrastructure, the concessionaire of the line till 30 June 2013 and is now being operated by DMRC.[99] The line was constructed at a cost of ₹57 billion (US$710 million), of which Reliance Infrastructure invested ₹28.85 billion (US$360 million) and will pay fees on a revenue-share model.[100] The line has six stations (Dhaula Kuan and Delhi Aerocity became operational on 15 August 2011), with some featuring check-in facilities, parking, and eateries.[101] Rolling stock consists of six-coach trains operating at intervals of ten minutes and having a maximum speed of 135 km/h (84 mph).[101]
Originally scheduled to open before the 2010 Commonwealth Games, the line failed to obtain the mandatory safety clearance and was opened on 24 February 2011, after a delay of around 5 months. After 16 months of commencement of operations, the line was shut down for repairs of the viaducts on 8 July 2012.[102][103] The line reopened on 22 January 2013.[104] On 27 June 2013 Reliance Infrastructure Ltd intimated DMRC that they are unable to operate the line beyond 30 June 2013. Following this DMRC took over operations of Airport Express line from 1 July 2013 with an Operations and Maintenance team of 100 officials to handle the line.[105] In Jan 2015, DMRC reported that Airport Metro has recorded about 30 percent rise in its ridership following the fare reduction of up to 40 percent in July last year[106] On 14 September 2015 DMRC announced to reduce fares even further to improve the ridership of the line, the new fare structure will have maximum fare of ₹60 and minimum of ₹10 instead of ₹100 and ₹20 charged earlier, a reduction of about 40%.[107] DMRC has stated that this was done to reduce the crowding on Blue line, diverting some of the Dwarka-bound passengers to Airport Express Line, which is underutilised and faster compared to the Blue Line. On 24 June 2023, the operational speed of the trains was increased from 100 km/h to 110 km/h, enabling a 16 minute ride from New Delhi to IGI Airport.
Interchanges are available with Yellow Line at New Delhi, Blue Line at Dwarka Sector 21, Durgabai Deshmukh South Campus metro station of Pink Line at Dhaula Kuan & with the Indian Railways network at New Delhi.
An expansion to Dwarka Sector 25 has finished and was inaugurated on 17th September, 2023, along with the opening of the adjacent India International Convention Centre .[108]
Pink Line (Line 7)
The Pink Line is the second new line of the third phase of the Delhi Metro. It was partially opened on 14 March 2018, with a further extension opening on 6 August 2018. On 31 October 2018, Trilokpuri Sanjay Lake to Shiv Vihar section was opened. On 31 December 2018, Lajpat Nagar to Mayur Vihar Pocket I section opened. The final section between Mayur Vihar Pocket I and Trilokpuri Sanjay Lake was opened on 6 August 2021 after being previously delayed due to land acquisition and rehabilitation issues.
The Pink Line consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi. With a length of 58.43 kilometres (36.31 mi), it is the longest line in Delhi Metro, breaking the record set by the operational Blue Line (excluding branch line). It is mostly elevated and covers Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, which witnesses massive traffic jams every day.
The Pink line has interchanges with most of the operational lines of the network such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Green Line at Punjabi Bagh West, Dhaula Kuan of Airport Express at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBT's at Anand Vihar and Sarai Kale Khan. The Pink Line has the highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres (77 ft 5 in), passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[109]
Magenta Line (Line 8)
The Magenta Line was the first new line operated from the Third Phase of the Delhi Metro. It was partially opened on 25 December 2017 between Botanical Garden and Kalkaji Mandir, and the entire length of the line was inaugurated on 28 May 2018.
It consists of 25 metro stations from Janakpuri West to Botanical Garden. The Magenta Line provide direct connectivity to Terminal 1D of Indira Gandhi International Airport. The Hauz Khas station on this line and the current Yellow Line is the deepest Metro station at a depth of 29 metres (95 ft), surpassing the record set by Chawri Bazaar station on the Yellow Line, at a depth of 25 metres (82 ft).[110] The Magenta line has interchanges with the Yellow Line at Hauz Khas, Blue Line at Janakpuri West and Botanical Garden, and Violet Line at Kalkaji Mandir of the Delhi Metro network.
India's first ever fully-automated driverless train service was started on Magenta line in December 2020.[111]
Grey Line (Line 9)
The Grey Line (also known as Line 9) is the shortest route in the system. It connects Dwarka to Dhansa Bus Stand in the western part of Delhi. It covers around 4.295 km (2.669 mi) and comprises four stations: Dhansa Bus Stand, Najafgarh, Nangli and Dwarka. The line has an interchange with Blue Line at Dwarka Station. The Najafgarh to Dwarka section was opened to the public on 4 October 2019. The extension to Dhansa Bus Stand was scheduled to open in December 2020, but construction got delayed due to the COVID-19 pandemic, and was subsequently inaugurated on 18 September 2021.[112]
Integration with RRTS (RapidX)
NCR Planning commission and NCRTC are building Regional Rapid Transport System (RRTS). Which will provide connectivity between Delhi and other important cities in NCR like - Meerut, Panipat, Alwar, Gurgaon, Ghaziabad, Hapur and others.
This will also provide connectivity within Delhi. Since, these train will have operational speed of upto 160 kms/hr.
These will be much faster mode of transport within and outside Delhi. Since, Delhi Metro have operational average speed of around 30 kms/hr.
The first RRTS (RapidX) system is currently under development between Meerut and New Delhi. Which will connect Sarai Kale Khan and Modipuram (Meerut) with travel time just under 1 hour. The project will cost ₹30,274 crore (US$3.8 billion) and will have 22 stations, and two Depots at Duhai and Modipuram.[113]
Stations and Overview
- Length of the corridor: 82 km (51 mi)
- No. of stations: 14
- Names of stations: Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai, Muradnagar, Modinagar South, Modinagar North, Meerut South, Shatabdi Nagar, Begumpul and Modipuram.
- Depots: 2
- Names of depots: Duhai and Modipuram.
Expansion
Phase IV
Delhi Metro was planned to be built in phases spread over approximately 20 years with each phase having a target of five years to be completed and the end of one phase marking the beginning of another. Phase I (65 km or 40 mi) and Phase II (125 km or 78 mi) were completed in 2006 and 2011, respectively. Phase-III, totaling 160.07 km (99.46 mi),[56] was mostly completed on 5 April 2019, except for a small section of the Pink Line between the Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations[114] as well as the Grey Line extension from Najafgarh to Dhansa Bus Stand,[115] which opened on 6 August 2021 and 18 September 2021, respectively.
Phase IV of the network with a length of 103 km (64 mi) and 6 lines was finalized by the Government of Delhi in December 2018.[116] Approval from Government of India was received for 3 priority corridors in March 2019.[117] Construction work on these 3 priority corridors having a length of 65.1 km (40.5 mi) commenced on 30 December 2019, with an expected completion date of 2025.[118] Therefore, at the end of Phase IV, the total length of the Delhi Metro will exceed 450 kilometres (280 mi),[119][41] which does not include other independently operated systems in the National Capital Region such as the 29.7 kilometres (18.5 mi) long Aqua Line of the Noida-Greater Noida Metro[120] and the 11.7 kilometres (7.3 mi) of the Rapid Metro Gurgaon that connect to the Delhi Metro.[121][122] This may make Delhi Metro the 7th longest metro system by route length after Shanghai metro, Beijing Subway, Guangzhou Metro, Shenzhen Metro, Chengdu Metro and Hangzhou Metro.
Phase 4 Network | ||||||||
---|---|---|---|---|---|---|---|---|
Line No. | Line Name | Stations | Length (km) | Terminals | Via | Status | Expected Date of Completion | |
8 | Magenta Line | 22 | 29.26 | Janakpuri West | RK Ashram Marg | Janakpuri West, Krishna Park Extension, Keshopur, Paschim Vihar, Peeragarhi, Mangolpuri, West Enclave, Pushpanjali, Deepali Chowk, Madhuban Chowk, Pitampura, Prashant Vihar, North Pitampura, Haiderpur Badli Mor, Bhalswa, Majlis Park, Azadpur, Ashok Vihar, Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim, RK Ashram Marg | Under Construction[123] | 2025 |
10 | Silver Line | 15 | 23.62 | Tughlakabad | Delhi Aerocity | Tughlakabad, Tughlakabad Railway Colony, Anandmayee Marg, Sangam Vihar - Tigri, Khanpur, Ambedkar Nagar, Saket G-Block, Neb Sarai, IGNOU, Chhatarpur Mandir, Chhatarpur, Kishangarh, Vasant Kunj Sector-D, Mahipalpur, Delhi Aerocity | ||
7 | Pink Line | 8 | 12.32 | Majlis Park | Maujpur - Babarpur | Majlis Park, Burari, Jharoda Majra, Jagatpur Village, Soorghat, Sonia Vihar, Khajuri Khas, Bhajanpura, Yamuna Vihar, Maujpur - Babarpur | ||
1 | Red Line | 19 | 21.73 | Rithala | Narela | Rithala, Rohini Sector 25, Rohini Sector 26, Rohini Sector 31, Rohini Sector 32, Rohini Sector 36, Rohini Sector 37, Barwala, Pooth Khurd, Bawana Industrial Area – 1, Bawana Industrial Area – 2, Bawana, Bawana JJ Colony, Sanoth, New Sanoth Colony, Sanoth Depot Station, Bhorgarh Village, Anaj Mandi Narela, DDA Sports Complex Narela, Narela | Pending Approval | |
3 | 4.86 | Narela | Nathupur | Narela, Sector 5, Kundli, Nathupur | ||||
11 | Indigo Line | 10 | 12.57 | Inderlok | Indraprastha | Inderlok, Daya Basti, Sarai Rohilla, Ajmal Khan Park, Nabi Karim, New Delhi, LNJP Hospital, Delhi Gate, Indira Gandhi Stadium, Indraprastha | ||
12 | Brown Line | 7 | 7.96 | Lajpat Nagar | Saket G-Block | Lajpat Nagar, Andrews Ganj, Greater Kailash-1, Chirag Delhi, Pushpa Bhawan, Saket District Centre, Pushp Vihar, Saket G-Block | ||
3 | Blue Line | 6 | 5.1[124] | Noida Electronic City | Sahibabad | Noida Electronic City, Indirapuram, Indirapuram Extension, Kinauni Village, Vasundhara Sector 5, Sahibabad | ||
4 | Blue Line Branch | 4 | 5.06 | Vaishali | Mohan Nagar | Vaishali, Vaishali Extension, Vasundhara Sector 16, Sahibabad, Mohan Nagar | ||
M1 | Metro Lite - I | 21 | 19.09 | Kirti Nagar | Bamnoli Village | Kirti Nagar, Saraswati Garden, Mayapuri Bus Depot, Mayapuri, Hari Nagar Block BE, Mayapuri Industrial Area, Mayapuri Industrial Area-II, Tihar Jail, Shivpuri, Dabri Village, Sitapuri Extension, Mahavir Enclave, Dwarka Sector 2, Dwarka Sector 7, Dwarka Sector 6, Dwarka Court, Dwarka Sector 20, Dwarka Sector 23, Dhul Siras Village, ECC Dwarka, Bamnoli Village | ||
Total | 115 | 141.21 |
Proposed Phase V
Former managing director of DMRC E. Sreedharan stated that by the time Phase IV is completed, the city will need Phase V to cope with the rising population and transport needs.[37] Planning work for Phase V has not started. However, the following corridors, while not specifically tied or approved to any expansion phase have been suggested to be constructed in the near future:
- Yamuna Bank – Loni Border: 12 kilometres (7.5 mi) long, dropped from Phase IV expansion.[125]
Haryana projects
- Gurugram Metro loop (from HUDA City Centre to Cyber City) - under construction, completion March 2027: The total length of the corridor shall be about 28.80 km (17.90 mi), consisting 27 elevated stations with six interchange stations. This link would start at HUDA City Centre and move towards Sector 45, Cyber Park, district shopping centre, Sector 47, Subhash Chowk, Sector 48, Sector 72 A, Hero Honda Chowk, Udyog Vihar Phase 6, Sector 10, Sector 37, Basai village, Sector 9, Sector 7, Sector 4, Sector 5, Ashok Vihar, Sector 3, Bajghera Road, Palam Vihar Extension, Palam Vihar, Sector 23 A, Sector 22, Udyog Vihar Phase 4, Udyog Vihar Phase 5 and finally merge in existing Metro network of Rapid Metro Gurgaon at Moulsari Avenue station near Cyber City.[126]
- Gurugram (from Rezang La Chowk in Palam Vihar to IGI Airport (IICC - Dwarka Sector 25 metro station)) - under construction: connect Gurugram Loop to IGI Airport by connecting Palam Vihar to Delhi Airport Metro Express (Orange Line) at existing IICC - Dwarka Sector 25 metro station (India International Convention and Expo Centre) which also connects to Blue Line at Dwarka Sector 21 metro station).[127] It will likely be a nearly 6 km extension of Orange Line from IICC Dwarka to Bamnoli Chowk (southeast end of IICC), Nykaa village, Bijwasan railway station (BWSN), Gurugram Sector-51 and connect to Gurugram metro network near Palam Vihar Halt railway station (PLVR).
- Narela to Sonipat - approved: An extension of Red Line. In June 2017, the Government of Haryana's cabinet approved the investment of ₹968.20 crore (US$150 million), as its share on the 80:20 equity ratio with the Union Government, for the 4.86 kilometres (3.02 mi) extension of Delhi Metro from the existing Rithala metro station to Sonipat via Bawana with three elevated stations at Sector 5 of Narela in Delhi, on Delhi border at Kundli Industrial Area and Nathupur Industrial Area in Sonipat, which are planned to be built as part of Phase IV.[128]
- HUDA City Centre to Manesar City - approved: An extension of Yellow Line, included in the Gurgaon Masterplan 2031,[129][130] approved by the Haryana govt will go up to Panchgaon Chowk in Manesar,[131] where it will interchange with Delhi–Alwar Regional Rapid Transit System, Haryana Orbital Rail Corridor (Panchgaon), Western Peripheral Expressway's Multimodal Transit Centre and Jhajjar-Palwal rail line.
- Gurgaon – Faridabad metro - DPR ready: In May 2020, the Detailed Project Report (DPR) and survey for the 32 km (20 mi) long Gurgaon-Faridabad metro link from Vatika Chowk in Gururam to Bata Chowk in Faridabad was completed which will have 8 stations, of which the 28 km (17 mi) elevated stretch along the Gurgaon-Faridabad Road through eco-sensitive wildlife corridor will be elevated.[132]
- Bahadurgarh (Brigadier Hoshiyar Singh metro station) – Rohtak City: A Green Line extension. partially approved till Asaudha.[130] Bahadurgarh to Asaudha railway station section, to connect with Haryana Orbital Rail Corridor at Asaudha station, is covered in fy2023-24 budget of Haryana govt.[133]
- Dhansa Bus Stand – Jhajjar City: A Grey Line extension, proposed only and not yet approved.[134]
Uttar Pradesh (UP) projects
- Shiv Vihar – Loni: Proposed only, not approved.[135]
- Noida – Noida International Airport: a 35 kilometres (22 mi) long surface running line along the Yamuna Expressway serving the proposed new Noida International Airport. The line is envisioned to be completed by 2025 and will connect with the Noida Metro.[136][137]
Operations
The trains operate at a frequency of one to two minutes to five to ten minutes between 05:00 and 00:00, depending upon the peak and off-peak hours. Trains operating within the network typically travel at speed up to 75 km/h (47 mph) and stop for about 20 seconds at each station. Automated station announcements are recorded in Hindi and English. Many stations have services such as ATMs, food outlets, cafés, convenience stores and mobile recharge. Eating, drinking, smoking, and chewing gum are prohibited in the entire system. The Metro also has a sophisticated fire alarm system for advance warning in emergencies, and fire retardant material is used in trains as well as on the premises of stations.[138] Navigation information is available on Google Maps.[139] Since October 2010, the first coach of every train is reserved for women. However, last coaches are also reserved when the train changes tracks at the terminal stations in the Red, Green and Violet Lines.[140][141] To make travelling by metro a smoother experience, Delhi Metro has launched its own official mobile app Delhi Metro Rail for smartphone users,(iPhone and Android) that will provide information on various facilities like the location of the nearest metro station,[142] fare, parking availability, tourist spots near metro stations, security and emergency helpline numbers.[143]
Security
Security on the Delhi Metro is handled by CISF Unit DMRC of Central Industrial Security Force (CISF), who have been guarding the system ever since they took over from the Delhi Police in 2007.[144] Closed-circuit cameras are used to monitor trains and stations, and feed from these is monitored by both the CISF and Delhi Metro authorities at their respective control rooms.[145] Over 7000 CISF personnel have been deployed for security of metro and its installations in addition to metal detectors, X-ray baggage inspection systems, and dog squads which are used to secure the system. To deal with law and order issues in the system, 18 Delhi Metro Rail Police (A dedicated wing of Delhi Police) stations have been established. About 5,200 CCTV cameras have been installed. Each of the underground stations has about 45 to 50 cameras installed while the elevated stations have about 16 to 20 cameras each. The monitoring of these cameras is done by the CISF, which is in charge of the security of the Metro, as well as the Delhi Metro Rail Corporation.[146] Intercoms are provided in each train car for emergency communication between the passengers and the train operator.[147] Periodic security drills are carried out at stations and on trains to ensure the preparedness of security agencies in emergency situations.[148] DMRC is also looking at raising the station walls and railings for the safety of passengers.[149]
Ticketing and recharge
Delhi Metro's fares were last revised and went into effect on 10 October 2017 based on the recommendation of the 4th Fare Fixation Committee in May 2016.[150][151] For convenience, Delhi Metro commuters have five choices for ticket purchase.[152] These are:
- RFID token: RFID tokens are valid only for a single journey on the day of purchase and the value depends on the distance travelled, with fares for a single journey ranging from ₹10 (13¢ US) to ₹60 (75¢ US). Fares are calculated based on the distance between the origin and destination stations. They were last revised by DMRC in October 2017.[150]
- Smart card: Smart cards are available for longer durations and are the most convenient for frequent commuters. They are valid for ten years from the date of purchase or the date of the last recharge and are available in denominations of ₹200 (US$2.50) to ₹3,000 (US$37.60). A 10% discount is given on all travel made on it. An additional 10% discount is given to travel card holders for entering the metro system in off-peak hours i.e. From the start of revenue services to 800 hours, from 1200 hours to 1700 hours, and after 2100 hours to the end of metro service in the night. This additional discount is given only on Weekdays i.e. from Monday to Saturday.[153] A deposit of ₹50 (63¢ US) needs to be made to buy a new card which is refundable on the return of the card any time before its expiry if the card is not physically damaged.[154] For women commuters, Delhi government had proposed a fare exemption scheme, i.e., that women could ride free all across all of Delhi Metro's network.[155] However, this proposal was shot down by the DMRC.[156]
- A common ticketing facility that allowed commuters to use smart cards in both Delhi Transport Corporation (DTC) buses and the metro was rolled out on 28 August 2018, under the 'common mobility card' project.[157]
- Tourist card: Tourist cards can be used for unlimited travel on the Delhi Metro network over short periods of time. There are two kinds of tourist cards valid for one and three days respectively. The cost of a one-day card is ₹200 (US$2.50) and that of a three-day card is ₹500 (US$6.30), including a refundable deposit of ₹50 (63¢ US) that must be paid at the time of purchasing the card.[158]
- National Common Mobility Card: Part of the 'One Nation, One Card' policy of the Government of India, the National Common Mobility Card is an inter-operable transport card that enables the user to pay for travel, toll duties (toll tax), retail shopping and withdraw money. It is enabled through the RuPay card mechanism. The NCMC was commissioned on the Delhi Metro network on 28 December 2020 and currently, can only be used to pay fares on the Airport Express Line.[159] The DMRC plans to makes the entire Delhi Metro network NCMC compliant by June 2023.[160]
- QR code based ticketing: A Delhi Metro QR ticket is a mobile-based ticket that allows people to travel from one destination to another, just like the conventional token or recharge card.[161][162] The ticket can be bought online using the RIDLR app. For entry and exit, the QR ticket has to be scanned at the QR scanner of the AFC gates. Similar to mobile-based tickets, there are also paper-based QR tickets that can be bought from the station itself. For entry and exit, the QR ticket has to be scanned at the QR scanner of the AFC gates.[163][164][165]
Problems
As the network has expanded, high ridership in new trains has led to increasing instances of overcrowding and delays on the Delhi Metro.[167][168] To alleviate the problem, 8 coach trains have been introduced in Yellow line and Blue line and an increase in the frequency of trains has been proposed.[167] Infrequent, overcrowded and erratic feeder bus services connecting stations to nearby localities have also been reported as an area of concern.[169][170] While the quality and the cleanliness of the Delhi Metro was lauded, the rising cost of fares have been routinely criticized, with fares being much more expensive compared to the bus services the metro replaced.[19] One recent study has named the fares of the Delhi Metro as one of the world's most unaffordable among the metros that charge more than US$0.5 per ride.[171] Another study finds that Delhi Metro may also have a low ridership problem compared to its size and may not be generating the amount of traffic a metro system generates.[172]
Feeder buses
DMRC operates around 291 electric feeder buses on 42 routes connecting 54 metro stations in Delhi. Around two hundred thousand people use the feeder bus service on a daily basis. Timings of Feeder Bus operation are 08:00 Hours to 20:00 Hours at a frequency of 10 to 15 minutes depending upon Road Traffic density. However, if an operator wishes he can operate before/beyond these hours. At present Metro, Feeder Bus Depots are located at Shastri Park, Kohat Enclave, Janakpuri West, Dwarka Sector-9, Chhatarpur, Yamuna Bank, Azadpur.[173]
Ridership
Delhi Metro had a continuous increase in ridership since its inception up to FY 2016–17. When Metro services were introduced in 2002, the average ridership was 80,000 passengers per day.[174] In FY 2016–17, average daily ridership rose to 28 lakh (2.8 million).[32] Ridership declined in 2017-18 and marginally increased in 2018-19, following fare increases.[32] The highest number of passengers in a single day was reached on 30 July 2019, with 51.6 lakh (5.16 million) trips[lower-alpha 2] on the network.[175] In FY 2019–20, the average daily ridership was 27.8 lakhs (2.78 million).[176]
Delhi Metro was suspended on 25 March 2020 due to COVID-19 pandemic,[177] and operations were restarted on 12 September 2020,[178] resulting in a decline in average daily ridership to 8.78 lakhs (0.88 million) in FY 2020–21.[32]
Year | Ridership |
---|---|
2004–05 | 124,000 |
2005–06 | 268,000 |
2006–07 | 484,000 |
2007–08 | 625,000 |
2008–09 | 722,000 |
2009–10 | 919,000 |
2010–11 | 1,259,000 |
2011–12 | 1,660,000 |
2012–13 | 1,926,000 |
2013–14 | 2,205,000 |
2014–15 | 2,403,000 |
2015–16 | 2,615,000 |
2016–17 | 2,800,000 |
2017–18 | 2,587,000 |
2018–19 | 2,593,000 |
2019–20* | 2,780,000 |
2020–21* | 878,000 |
2021–22 | 2,516,000 |
* Including Rapid Metro Gurgaon
Finances
Summary financials
Source:[182][183][184][185][186][187][188][189][190]
[191][192][193][194][195][196][197][198]
Delhi Metro has been operating with a loss on an EBT (earnings before taxes) basis since 2010, although the loss has reduced after 2015–16. EBITDA (earnings before interest, taxes, depreciation, and amortization) margin declined from 73% in Fiscal 2007 to 27% in Fiscal 2016–17 before improving to 30% in 2017–18. In 2014, Delhi Metro started a semi-naming policy of metro stations, awarded through an open e-tendering process, to generate non-fare revenues.[199][200][201]
Funding and capitalisation
DMRC is owned equally by the Government of National Capital Territory of Delhi and the Government of India.
As of March 2016, total debt stood at ₹291.5 billion (US$3.7 billion), while equity capital was ₹239.9 billion (US$3.0 billion). The cost of the debt is 0% for Union Government and Delhi Government loans and between 0.01% and 2.3% for Japan International Cooperation Agency (JICA) loans. Of the equity capital as of 31 March 2016, ₹193.1 billion (US$2.4 billion) is paid-up capital, and the rest is reserves and surplus.[191]
Depots
Delhi Metro currently has 15 operational depots.
Line | Line name | Number of depots | Location | Opening date |
---|---|---|---|---|
1 | Red Line | 1 | Shastri Park | 25 December 2002 |
Narela Depot | 2024 | |||
2 | Yellow Line | 3 | Siraspur Depot | August 2019 |
Khyber Pass | 20 December 2004 | |||
Sultanpur | 21 June 2010 | |||
3 / 4 | Blue Line | 2 | Yamuna Bank | 10 May 2009 |
Najafgarh | 21 December 2005 | |||
5 | Green Line | 2 | Mundka (First Standard gauge Depot of India) | 2 April 2010 |
Modern Industrial Estate (MIE) | 2021 | |||
6 | Violet Line | 2 | Sarita Vihar | 3 October 2010 |
Neelam Chowk Ajronda | 6 September 2015 | |||
Airport Express | 1 | Dwarka Sector 21 | 23 February 2011 | |
7 | Pink Line | 2 | Mukundpur | 14 March 2018 |
Vinod Nagar - Ghazipur | 31 October 2018 | |||
8 | Magenta Line | 2 | Kalindi Kunj - Jasola Vihar Shaheen Bagh | 25 December 2017 |
Mangolpuri | 2024 | |||
9 | Grey Line | 1 | Najafgarh | August 2019 |
Some Depots such as Shastri Park and Yamuna Bank Depots are located within the vicinity of their respective at-grade station complexes, whereas others such as Sarita Vihar and Mundka are joined to the main line indirectly. Najafgarh Depot is unique as it houses trains from the Blue Line as well as the Grey Line, something which the Sarita Vihar Depot will also have in the future(Violet Line and Silver Line). Phase III Depots (Kalindi Kunj and Vinod Nagar) have been built very differently owing to land acquisition issues. Kalindi Kunj Depot has been made in such a way that an extra elevated Stabling Yard has been built adjacent to the Jasola Vihar - Shaheen Bagh Station; and Vinod Nagar consists of two sub-depots, where one has two floors to hold the trains.
In addition to these, a separate elevated Stabling Yard has also been built just off the Noida Electronic City Station, but it is not considered as a Depot.
In the future, Mukundpur Depot may also be augmented to hold Magenta Line trains, when the line extends to this part of Delhi in Phase IV.
Rolling stock
The Delhi Metro uses the rolling stock of two different gauges. Phase I lines use 5 ft 6 in (1,676 mm) broad gauge rolling stock, while three Phase II lines use 1,435 mm (4 ft 8+1⁄2 in) rolling stock.[203] Trains are maintained at seven depots at Khyber Pass and Sultanpur for the Yellow Line, Mundka for the Green Line, Najafgarh and Yamuna Bank for the Blue Line, Shastri Park for the Red Line, and Sarita Vihar for the Violet Line.[204][205]
Maglev trains were initially considered for some lines of Phase 3, but DMRC decided to continue with conventional rail in August 2012.[206]
As on 31 March 2015, the company has a total of 1,306 coaches (220 trains). Apart from extensions on various existing lines, two new lines viz. Lines 7 & 8 are proposed in Phase III. 486 coaches (81 six-car trains) being procured for these two new lines will have an advanced feature in Unattended Train Operation (UTO). Additional 258 broad gauge (BG) coaches for Lines 1 to 4 and 138 standard gauge (SG) coaches for Lines 5 & 6 are proposed to be procured for augmentation/extensions to cater to the increased traffic. Resultantly, at the end of Phase III, there would be 2,188 coaches (333 trains). Barring a few 4-car trains on Line 5, 93% of the trains would operate either in 6-car or 8-car configuration at the end of Phase III.[190]
Broad gauge
The rolling stock is manufactured by two major suppliers. For Phase I, the rolling stock was supplied by a consortium of companies comprising Hyundai Rotem, Mitsubishi Corporation, and MELCO. The coaches have a very similar look to MTR Rotem EMU, but there are only 4 doors and sliding doors are used instead of plug doors. The coaches were initially built in South Korea by ROTEM,[205] then in Bangalore by BEML through a technology transfer arrangement.[207] These trains consist of four 3.2-metre-wide (10 ft 6 in) stainless steel lightweight coaches with vestibules permitting movement throughout their length and can carry up to 1,500 passengers,[208] with 50 seated and 330 standing passengers per coach.[209] The coaches are fully air-conditioned, equipped with automatic doors, microprocessor-controlled brakes and secondary air suspension,[210] and are capable of maintaining an average speed of 32 km/h (20 mph) over a distance of 1.1 km (0.68 mi).[209] The system is extensible up to eight coaches, and platforms have been designed accordingly.[208]
The rolling stock for Phase II is being supplied by Bombardier Transportation, which has received an order for 614 cars worth approximately US$1.1 Billion.[211] While initial trains were made in Görlitz, Germany and Sweden, the remainder will be built at Bombardier's factory in Savli, near Vadodara.[212] These trains are a mix of four-car and six-car consists, capable of accommodating 1,178 and 1,792 commuters per train respectively. The coaches possess several improved features like Closed Circuit Television (CCTV) cameras with eight-hour backup for added security, charging points in all coaches for cell phones and laptops, improved air conditioning to provide a temperature of 25 °C (77 °F) even in packed conditions and heaters for winter.[213]
Standard gauge
The standard gauge rolling stock is manufactured by BEML at its factory in Bangalore. Most of these trains are supplied to BEML by Hyundai Rotem. The trains are four-car consists with a capacity of 1,506 commuters per train,[214] accommodating 50 seated and 292 standing passengers in each coach.[209] These trains will have CCTV cameras in and outside the coaches, power supply connections inside coaches to charge mobiles and laptops, better humidity control, microprocessor-controlled disc brakes,[215] and will be capable of maintaining an average speed of 34 km/h (21 mph) over a distance of 1.1 km (0.68 mi).[209]
Airport Express
Eight 6-car trains supplied by CAF Beasain were imported from Spain.[216] CAF held 5% equity in the DAME project, and Reliance Infrastructure held the remaining 95%[217] before DMRC took over the operations. The trains on this line are of a premium standard compared to the existing metro trains and have inbuilt noise reduction and padded fabric seats. The coaches are equipped with LCD screens for the entertainment of the passengers and also provide flight information for the convenience of air travellers. The trains are fitted with an event recorder which can withstand high levels of temperature and impact and the wheels have a flange lubrication system for less noise and better riding comfort.[140]
Signalling and telecommunication
The Delhi Metro uses cab signalling along with a centralised automatic train control system consisting of automatic operation, protection and signalling modules.[218] A 380 MHz digital trunked TETRA radio communication system from Motorola Solutions is used on all lines to carry both voice and data information.[219] For the Blue Line, Siemens supplied the electronic interlocking Sicas, the operation control system Vicos OC 500 and the automation control system LZB 700 M.[220] An integrated system comprising optical fibre cable, on-train radio, CCTV, and a centralised clock and public address system is used for telecommunication during train operations as well as emergencies.[221] For Red and Yellow lines ALSTOM has supplied signalling system and for the Green and Violet lines, Bombardier Transportation supplied its CITYFLO 350 signalling system.
The Airport Express line introduced WiFi services at all stations along the route on 13 January 2012.[222] Connectivity inside metro trains travelling on the route is expected in the future. The WiFi service is provided by YOU Broadband and Cable India Limited.[223] In August 2017, Wifi service was launched at all the 50 stations under Blue Line.[224]
A fully automated, operator-less train system has been offered to Delhi Metro by the French defense and civilian technologies major Thales.[225]
Environment and aesthetics
The Delhi Metro has won awards for environmentally friendly practices from organisations including the United Nations,[226] RINA,[227] and the International Organization for Standardization,[227] becoming the second metro in the world, after the New York City Subway, to be ISO 14001 certified for environmentally friendly construction.[228] Most of the Metro stations on the Blue Line conduct rainwater harvesting as an environmental protection measure.[229] It is also the first railway project in the world to earn carbon credits after being registered with the United Nations under the Clean Development Mechanism,[230] and has so far earned 400,000 carbon credits by saving energy through the use of regenerative braking systems on its trains.[231] To reduce its dependence on non-renewable sources of energy, DMRC is looking forward to harnessing solar energy and install solar panels at the Karkarduma, Noida Sector-21, Anand Vihar and Pragati Maidan Metro stations and DMRC's residential complex at Pushp Vihar.[232][233] As of March 2017, the DMRC has commissioned 20 MWp (megawatt peak) of solar power plants across 21 locations on the metro network. This is planned to increase to 31 MWp by March 2018, and 50 MWp by 2021.[234] 60% of the system's daytime power demand is met by the Rewa Ultra Mega Solar park.[235]
The Metro has been promoted as an integral part of community infrastructure, and community artwork depicting the local way of life has been put on display at stations.[19]: 284 Students of local art colleges have also designed decorative murals at Metro stations,[236] while pillars of the viaduct on some elevated sections have been decorated with mosaic murals created by local schoolchildren.[237] The Metro station at INA Colony has a gallery showcasing artwork and handicrafts from across India,[238] while all stations on the Central Secretariat – Qutub Minar section of the Yellow Line have panels installed on the monumental architectural heritage of Delhi.[239] The Nobel Memorial Wall at Rajiv Chowk has portraits of the seven Nobel Laureates from India: Rabindranath Tagore, CV Raman, Hargobind Khorana, Mother Teresa, Subrahmanyan Chandrasekhar, Amartya Sen and Venkatraman Ramakrishnan and provide details about their contribution to society with separate panels on Alfred Nobel and the Nobel Prizes.
Awards
- Delhi Metro Rail Corporation won the Golden Peacock Environment Management Award 2005.[240]
- Delhi Metro Rail Corporation became the first Indian company to bag the World Green Building Council award for demonstrating "Industry Leadership in Sustainability".[241]
- Delhi Metro Rail Corporation won the PSU of the Year Award from the All India Management Association (AIMA), in 2016.[242]
- Delhi Metro Rail Corporation won the Japan International Cooperation Agency (JICA) President's Award 2012.[243]
In popular culture
Many films have been shot in Delhi Metro.[244][245] The first-ever movie to be shot in Delhi metro was Bewafaa in November 2003.[246] Later, Delhi-6, Love Aaj Kal, PK, Paa were few popular films that had sequences shot inside Delhi metro trains and station premises.[247][248] In March 2014, the shooting of Hrithik Roshan and Katrina Kaif starrer film Bang Bang! was done near Mayur Vihar Extension metro station.[249][250] In 2019, Hrithik Roshan and Tiger Shroff starrer film War was one of the most recent films to be shot in Delhi metro.[251]
See also
Notes
- Transfer stations are counted more than once. There are 24 transfer stations. If transfer stations are counted only once, the result will be 231 stations. Ashok Park Main station, where the two diverging branches of Green Line share tracks/platforms, is anyway counted as a single station. Stations of Noida Metro and Gurgaon Metro are not counted. If stations of Noida Metro and Gurgaon Metro are counted, the result will be 288 stations.[11][1][6]
- Based on line utilisation which counts over transit lines used for a single journey.
- The total length of Delhi Metro is 350.42 kilometres (217.74 mi). The operations & maintenance of Gurgaon Metro and Noida Metro is currently undertaken by DMRC, so the total length operated by DMRC is 392.44 kilometres (243.85 mi).[11][6]
- Does not include Dwarka Sector 21 – IICC - Dwarka Sector 25 corridor
References
- "Present Network". www.delhimetrorail.com. Retrieved 16 April 2022.
- "Economic Survey of Delhi 2022–23" (PDF). p. 209. Archived from the original (PDF) on 1 October 2023. Retrieved 30 March 2023.
- Ashish Chandrorkar (19 February 2021). "A comprehensive report on Metro rail systems in India" (PDF). Archived (PDF) from the original on 31 August 2021.
- "Board of Directors of DMRC". www.delhimetrorail.com. Retrieved 2 April 2022.
- "Delhi Metro adding 120 more coaches to upgrade remaining fleet of 6-coach trains". Hindustan Times. 4 April 2021. Retrieved 10 April 2022.
- "Introduction | DMRC". www.delhimetrorail.com. Retrieved 16 April 2022.
- "VROOM! Delhi metro top speed increased! Now, IGI Airport to New Delhi Railway Station in just". 22 March 2023.
- "Delhi airport metro line, now running at 100 KMPH". 23 March 2023.
- "Delhi Metro increases speed to 120kmph on Airport Line. Know how long will it take to reach Delhi airport". 16 September 2023.
- Dua, Tanya (24 November 2018). "After 5 years of riding the New York City subway, I tried the Delhi Metro at the busiest time of the year – and it showed me exactly what I'm missing". Business Insider. Retrieved 24 February 2019.
- "Route map". www.delhimetrorail.com. Retrieved 16 April 2022.
- https://www.delhimetrorail.com/pages/en/pressrelease_details/dmrc-services-update-5.
{{cite web}}
: Missing or empty|title=
(help) - Roy, Sidharatha (25 December 2017). "Delhi Metro: It all started 15 Xmas days ago". The Times of India. New Delhi. Archived from the original on 7 January 2018. Retrieved 16 January 2018.
- "DMRC's remarkable growth: Delhi Metro surpasses 390 kms, becomes India's longest metro network".
- "Project Update an Janakpuri West – R. K. Ashram Marg corridor".
- "Delhi Metro to join global club of metro networks having span of over 300 km". The Times of India. 29 October 2018.
- "PM inaugurates KMP expressway, Ballabhgarh-Mujesar Metro rail link".
- "Delhi Metro takes over operations of Gurgaon Rapid Metro". mint. 23 October 2019. Retrieved 16 April 2022.
- Siemiatycki, Matti (June 2006). "Message in a Metro: Building Urban Rail Infrastructure and Image in Delhi, India". International Journal of Urban and Regional Research. 30 (2): 277–292. doi:10.1111/j.1468-2427.2006.00664.x.
- "History of Delhi Metro". DMRC. Archived from the original on 25 September 2010. Retrieved 17 September 2009.
- Pucher, John; Nisha Korattyswaroopam; Neenu Ittyerah (2004). "The Crisis of Public Transport in India". Journal of Public Transportation. 7 (4): 1–20. doi:10.5038/2375-0901.7.4.1.
- "The derailment of E Sreedharan". TOI. 2 March 2021. Retrieved 4 March 2021.
- "Structure of Delhi Metro". DMRC. Archived from the original on 16 September 2010. Retrieved 17 September 2009.
- "Delhi metro rail work begins but without fanfare". The Indian Express. Archived from the original on 18 April 2008.
- "Delhi Metro showcases public sector success". The Indian Express. 13 April 2007. Archived from the original on 25 December 2008. Retrieved 10 September 2009.
- "二零零一度" (PDF). MTR Corporation. Retrieved 3 August 2017.
- "Delhi Metro Rail to adopt BG system". Business Line. New Delhi: The Hindu. 7 August 2000. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
- "Indian PM launches Delhi metro". BBC News. 24 December 2002. Archived from the original on 22 April 2012. Retrieved 22 April 2010.
- "The Tribune, Chandigarh, India – Delhi and neighbourhood". The Tribune. Archived from the original on 12 March 2016. Retrieved 12 February 2017.
- "The Tribune – Magazine section – Saturday Extra". The Tribune. Archived from the original on 16 July 2007. Retrieved 12 February 2017.
- Nandini Lakshman (19 March 2007). "The Miracle-Worker of the Delhi Metro". Bloomberg BusinessWeek. Archived from the original on 25 December 2008. Retrieved 10 September 2009.
- "Economic Survey of Delhi 2021–22" (PDF). pp. 217–219, 229. Archived from the original (PDF) on 31 May 2022. Retrieved 30 April 2022.
- "Funding". delhimetrorail.com. Delhi Metro Rail Corporation. 5 April 2019. Retrieved 12 January 2022.
Phase III: The total estimated expenditure for Phase III expansion is Rs. 41,079 crores.
- "Delhi Metro rings in the New Year under new chief". Jagran Post. New Delhi: Dainik Jagran. 1 January 2012. Archived from the original on 2 July 2017. Retrieved 16 January 2018.
- "PM flags off Red Line extension". The Hindu. 8 March 2019. ISSN 0971-751X. Retrieved 25 April 2022.
- "Blue Line Metro: PM Modi inaugurates Delhi Metro's Blue Line extension | Noida News". The Times of India. 9 March 2019.
- "Metro to cover whole of Delhi by 2012". The Economic Times. 11 December 2011. Archived from the original on 13 June 2015. Retrieved 8 April 2012.
- "Jung wants better access to all Metro stations". The Indian Express. 23 April 2014. Archived from the original on 24 April 2014. Retrieved 24 April 2014.
- "Phase 3 Corridors" (Press release). DMRC. Archived from the original on 6 June 2017. Retrieved 4 June 2017.
- "Tunnelling work starts for Metro's Phase III". The Economic Times. 31 January 2012. Archived from the original on 5 March 2016. Retrieved 8 April 2012.
- Will not let funding row derail Phase-IV: Government Archived 7 July 2017 at the Wayback Machine, The Economic Times, 4 July 2017.
- Prasad, Nikita (17 September 2021). "Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow". NDTV. Retrieved 12 January 2022.
- "Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 station". The Times of India. 17 September 2023. ISSN 0971-8257. Retrieved 1 October 2023.
- Bedi, Aneesa (28 December 2020). "PM Modi launches India's first driverless metro train in Delhi. Here's all you need to know". The Print. Retrieved 12 January 2022.
- "Driverless train operations on Pink Line flagged off". Money Control. 25 November 2021. Retrieved 12 January 2022.
- Chitlangia, Risha (3 December 2021). "Delhi Metro ridership only half of the figure projected by DMRC: CAG report". Hindustan Times. Retrieved 12 January 2022.
The CAG report said pointed out that the DMRC had projected an average daily ridership in the entire network (phases I, II and III) would rise to 53.47 lakh in 2019-20 but the actual ridership was only around 27.79 lakh (51.97% of the projected figure). The report also claimed that DMRC had projected daily ridership of around 20.89 lakhs in the four Phase-III corridors in 2019-20 but the actual ridership was just 4.38 lakh.
- "Report No.11 of 2021 - Performance Audit on Implementation of Phase-III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs" (PDF). cag.gov.in. Comptroller and Auditor General of India. 2 December 2021. p. 16. Retrieved 12 January 2022.
- "Delhi metro average train frequency during peak and off-peak hours ( As on 31.12.2021)". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 12 January 2022.
- "Report No.11 of 2021 - Performance Audit on Implementation of Phase-III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs" (PDF). cag.gov.in. Comptroller and Auditor General of India. 2 December 2021. p. 12. Retrieved 12 January 2022.
- "Delhi Metro bridge collapses; 1 dead". IBN Live. CNN-IBN. 19 October 2008. Retrieved 19 October 2008.
- "A chronology of Delhi Metro accidents". Hindustan Times. 12 July 2009. Archived from the original on 7 January 2018. Retrieved 22 January 2018.
- Suri, Megha (14 July 2009). "Day 2: 3 cranes fall, Metro image takes beating". The Times of India. New Delhi. Archived from the original on 27 June 2014. Retrieved 22 January 2018.
- "Labourer dies at Delhi Metro construction site". Central Chronicle. 22 July 2009. Archived from the original on 8 July 2011. Retrieved 22 April 2010.
- Mathur, Atul (7 December 2009). "City's nightmare on wheels". Hindustan Times. Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
- "Five injured as iron girder falls off Metro structure in Ghaziabad". Hindustan Times. 23 April 2018. Archived from the original on 23 April 2018.
- "Network". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
- "Underground network in Phase 1 is 13 km". The Economic Times. Retrieved 25 April 2022.
- "Phase 1 complete, Pragati Maidan now on Metro map". Express India. 27 October 2006. Archived from the original on 31 December 2020. Retrieved 18 April 2010.
- Ramachandran, Smriti Kak (17 September 2007). "Delhi Metro confident of meeting deadline". The Hindu. New Delhi. Archived from the original on 3 March 2018. Retrieved 10 September 2009.
- Ramnani, Vandana (6 August 2021). "Delhi's 59-km Pink Line Metro now fully operational; becomes longest operational corridor". Money Control. Retrieved 11 January 2022.
- Prasad, Nikita (17 September 2021). "Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow". NDTV. Retrieved 11 January 2022.
- "APPROVED-PHASE-IV-CORRIDORS-AS-ON-19.08.2021.pdf" (PDF). delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
- "Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC". Hindustan Times. 20 June 2021. Retrieved 11 January 2022.
"DMRC is currently engaged in the construction of 65 kilometers of new lines across three priority corridors as part of its Phase 4 expansion. These corridors are expected to be completed by 2025. However, given the fact that the Covid-19 scenario is still evolving, the completion targets shall be reviewed accordingly," said Anuj Dayal, executive director, corporate communications, DMRC.
- "Monthly average of trains/coaches run in delhi metro - (updated as on 31.12.2021)". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 11 January 2022.
- "Delhi Metro Red Line". Archived from the original on 5 October 2016. Retrieved 20 September 2016.
- "On May 2, Metro to cross the Yamuna again". The Times of India. New Delhi. 24 April 2009. Archived from the original on 3 February 2015. Retrieved 16 January 2018.
- "Prime Minister inaugurates Metro Rail services between Tis Hazari and Shahdara" (Press release). Press Information Bureau, Government of India. 24 December 2002. Archived from the original on 21 July 2011. Retrieved 29 March 2010.
- "Passengers swamp Delhi's new metro". The Sydney Morning Herald. 27 December 2002. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
- "70,000 travel by Tri Nagar-Tis Hazari Metro rail". The Times of India. New Delhi. 5 October 2003. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
- "Metro Station Information". DMRC. Archived from the original on 18 September 2010. Retrieved 29 March 2009.
- "DMRC to introduce six-coach trains on Dilshad Garden-Rithala line on Sunday". The Times of India. New Delhi. 23 November 2013. Archived from the original on 4 February 2015. Retrieved 16 January 2018.
- "Eight-coach trains introduced on Red line: Delhi Metro". The Times of India. 8 November 2022.
- "A subterranean journey begins". The Times of India. New Delhi. 20 December 2004. Archived from the original on 3 March 2018. Retrieved 22 January 2018.
- "Delhi Metro Museum Celebrates 3rd Anniversary". RailNews Media India Ltd. Archived from the original on 11 September 2014.
- "Hauz Khas set to get deepest underground metro station by March 2016". The Indian Express. New Delhi. 16 September 2014. Archived from the original on 16 January 2018. Retrieved 22 January 2018.
- "Chhattarpur Metro Station To Become Operational From Tomorrow" (Press release). New Delhi: Delhi Metro Rail Corporation. 25 August 2010. Archived from the original on 7 November 2017. Retrieved 22 January 2018.
- "Chattarpur station to open today". The Times of India. New Delhi. 26 August 2010. Archived from the original on 3 March 2018. Retrieved 22 January 2018.
- "Gurgaon gets a lifeline as CST-Qutub corridor opens". Sify News. 8 September 2010. Archived from the original on 16 November 2017. Retrieved 22 January 2018.
- "The Jahangirpuri- Samaypur Badli section (Extension of Line-2)". Delhi Metro. Archived from the original on 13 November 2015. Retrieved 9 November 2015.
- Sharma, Nidhi (29 June 2005). "New Delhi Metro station, your connect with National rail". The Times of India. New Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
- "Secretariat to DU in 18 minutes flat". The Hindu. 1 July 2005. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
- "Metro Museum". museum.delhimetrorail.com. Retrieved 21 July 2022.
- "Metro enters Noida, set to change travelling habits of people". Daily News and Analysis. 12 November 2009. Archived from the original on 1 April 2012. Retrieved 12 January 2009.
- "Metro to travel underground and overhead". The Times of India. 28 December 2005. Archived from the original on 26 January 2013. Retrieved 4 April 2010.
- Gaurav Vivek Bhatnagar (12 November 2006). "Delhi Metro just got bigger and better". The Hindu. Archived from the original on 29 June 2011. Retrieved 4 April 2010.
- "Delhi Anand Vihar Metro line opens for public". The Economic Times. 7 January 2010. Archived from the original on 10 January 2010. Retrieved 8 January 2010.
- "Anand Vihar – Vaishali Section To Open For Passenger Services From 14th July 2011" (Press release). DMRC. 13 July 2011. Archived from the original on 27 July 2011.
- "Press Release: DMRC Extends Metro Services To Dwarka Sector 21 on Line-3" (Press release). DMRC. 30 October 2010. Archived from the original on 23 November 2010. Retrieved 30 October 2010.
- "PM Modi flags off Noida City Centre-Noida Electronic City section of Delhi Metro 's Blue Line | Business News". timesnownews.com. 9 March 2019. Retrieved 20 March 2019.
- "40000 Footfalls at Anand Vihar Metro on Day 1". Outlook India. 7 January 2010. Archived from the original on 17 January 2010. Retrieved 4 April 2010.
- "Metro gets first standard gauge depot". The Hindu. New Delhi. 23 February 2010. Retrieved 16 January 2018.
- "Metro from Central Secretariat to Sarita Vihar too". Yahoo! News. New Delhi. 3 October 2010. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
- Suri, Megha (16 October 2010). "Train services on Delhi Metro's Central Secretariat to Sarita Vihar section will start one hour late (from 7 am) from October 17 to October 24 for integration of the section with the extension to Badarpur". The Times of India. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
- "DMRC opens Sarita Vihar–Badarpur section". Hindustan Times. 14 January 2011. Archived from the original on 20 October 2012. Retrieved 14 January 2011.
- "Janpath to Faridabad: On Sunday morning, a Metro ride for PM Modi". Hindustan Times. Press Trust of India. 6 September 2015. Archived from the original on 6 September 2015. Retrieved 6 September 2015.
- "Faridabad Metro Stations get highest Green Building Rating". delhimetrorail.com. Archived from the original on 8 December 2015.
- Ray, Subhendu (23 January 2012). "NCR's longest Metro line in Faridabad". Hindustan Times. Delhi. Archived from the original on 3 March 2018. Retrieved 16 January 2018.
- "Delhi: Kashmere Gate set to become biggest interchange station". The Indian Express. New Delhi. 26 May 2017. Archived from the original on 25 August 2017. Retrieved 15 January 2018.
- Singh, Megha Suri (17 August 2010). "Hawk-eyed vigil on airport metro line". The Times of India. New Delhi. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
- "Delhi Airport Express rail link opens". Railway Gazette International. Archived from the original on 3 December 2019. Retrieved 27 April 2022.
- "Airport Express Link: Metro gives a preview". The Indian Express. New Delhi. 6 November 2009. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
- "Airport Metro misses CWG deadline". NDTV. 3 October 2010. Archived from the original on 6 October 2010. Retrieved 9 November 2010.
- "Cities / Delhi : Airport to be 20 minutes from Connaught Place from Wednesday". The Hindu. 21 February 2011. Archived from the original on 28 September 2011. Retrieved 24 October 2011.
- "Delhi Airport Metro Express back on track". Livemint. New Delhi: HT Media Ltd. 22 January 2013. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
- "Delhi Metro takes over operations of Airport Express Line". The Hindu. 1 July 2013. Archived from the original on 4 July 2013. Retrieved 5 July 2013.
- "Airport Metro sees 30% rise in ridership after fare reduction". Business Standard. 1 January 2015. Archived from the original on 7 January 2015. Retrieved 19 January 2015.
- "DMRC to reduce Airport line fares". The Times of India. 15 September 2015. Archived from the original on 18 September 2015. Retrieved 15 September 2015.
- "PM Modi Inaugurates Delhi Metro Airport Express Line Extension, Takes Ride To YashoBhoomi". Zee News. Retrieved 17 September 2023.
- "New high for Metro with the track at 24m". The Indian Express. 26 September 2014.
- Gulati, Sumegha (16 September 2014). "Hauz Khas set to get deepest underground metro station". The Indian Express. Retrieved 30 April 2022.
- "First driverless metro in Delhi: All you need to know about Magenta line". India Today. 28 December 2020. Retrieved 30 September 2021.
- "Grey Line's Najafgarh- Dhansa Bus Stand Section Opens: How It Will Benefit Commuters". NDTV.com. Retrieved 19 September 2021.
- "1st phase of Delhi-Meerut RRTS to open in March – The Financial Express – NCRTC". Retrieved 3 October 2023.
- Ramnani, Vandana (6 August 2021). "Delhi's 59-km Pink Line Metro now fully operational; becomes longest operational corridor". Money Control. Retrieved 11 January 2022.
- Prasad, Nikita (17 September 2021). "Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow". NDTV. Retrieved 11 January 2022.
- "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 16 May 2022.
- "Delhi Metro: Cabinet approves three corridors of Delhi Metro Phase IV". The Economic Times. Retrieved 16 May 2022.
- "Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC". Hindustan Times. 20 June 2021. Retrieved 11 January 2022.
"DMRC is currently engaged in the construction of 65 kilometers of new lines across three priority corridors as part of its Phase 4 expansion. These corridors are expected to be completed by 2025. However, given the fact that the Covid-19 scenario is still evolving, the completion targets shall be reviewed accordingly," said Anuj Dayal, executive director, of corporate communications, DMRC.
- Delhi Metro Phase-4 gets government nod Archived 9 July 2017 at the Wayback Machine, The Times of India, 6 January 2017.
- Gaurav Vivek Bhatnagar (25 December 2006). "Delhi Metro map to cover Greater Noida". The Hindu. Archived from the original on 1 June 2009. Retrieved 10 September 2009.
- Megha Suri (30 January 2010). "Pvt metro link to get Central nod soon". The Times of India. Archived from the original on 5 November 2012. Retrieved 2 February 2010.
- Delhi Metro: DMRC to come up with elevated road network below these 3 new lines, The Financial Express, 21 December 2018.
- "Work begins on Delhi Metro Phase-IV". The Hindu. 31 December 2019. ISSN 0971-751X. Retrieved 31 December 2019.
- "DMRC submits plan to extend metro from Noida to Ghaziabad". The Times of India. Retrieved 4 August 2018.
- "Delhi Metro to come up with eight new corridors in Phase IV". India Today. Retrieved 4 August 2018.
- "Gurgaon Metro News: Haryana govt clears final DPR of Metro Rail Connection from HUDA City Centre to other parts of Gurugram | Gurgaon News - Times of India". The Times of India. 13 August 2020. Retrieved 16 September 2021.
- Joy after long wait as Gurgaon Metro gets central green light, Times of India, 8 June 2023.
- "Delhi Metro to be extended till Sonepat in Haryana". Zee News. 1 June 2017. Retrieved 4 August 2018.
- "TCP department realigns metro route linking Gurgaon to Manesar". The Times of India. Retrieved 4 August 2018.
- Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda Archived 26 October 2016 at the Wayback Machine, DNA India News, September 2015.
- Route alignment of Manesar metro changed, The Times of India, Nov 2018.
- "Survey complete for Gurugram-Faridabad metro link | Gurgaon News - Times of India". The Times of India. 10 September 2020. Retrieved 16 September 2021.
- NCR news: New Metro link from Gurugram’s Rezang La Chowk to Delhi IGI Airport, two more proposed, DNA, 24 Feb 2023.
- "Haryana CM announces extension of Delhi Metro up to Jhajjar town – RailNews Media India Ltd". railnews.in. Retrieved 6 August 2018.
- "Ghaziabad looks to extend three Metro lines, seeks DPRs". Hindustan Times. 1 January 2020. Retrieved 16 September 2021.
- YEIDA revives proposal for Greater Noida-Jewar airport Metro Archived 9 May 2017 at the Wayback Machine, The Economic Times, 25 April 2017.
- "Delhi-Jewar international airport to be connected via metro! Check details". Times Now. 23 February 2019. Retrieved 23 February 2019.
- "Measures to Ensure Safe Passage for Metro Train Passengers" (Press release). Press Information Bureau, Government of India. 27 August 2010. Archived from the original on 27 February 2014. Retrieved 27 April 2022.
- "Delhi Metro routes now on Google Maps". The Economic Times. 5 March 2010. Archived from the original on 7 March 2010. Retrieved 11 March 2010.
- "Delhi Metro to reserve coach for women from October 2". The Times of India. 26 September 2010. Archived from the original on 28 September 2010. Retrieved 27 September 2010.
- "Women get exclusive coach in Delhi Metro". Hindustan Times. 2 October 2010. Archived from the original on 16 December 2014. Retrieved 2 October 2010.
- "Delhi Metro launches new app with additional features". livemint.com. 24 July 2018.
- "DMRC launches smartphone app". The Hindu. New Delhi. 23 August 2013. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
- "CISF to take over Delhi Metro security". The Times of India. 7 March 2007. Archived from the original on 3 November 2012. Retrieved 15 April 2010.
- "Delhi metro parking areas to be bought under CCTV cameras". Daily News and Analysis. 21 March 2010. Archived from the original on 26 August 2010. Retrieved 15 April 2010.
- Megha Suri Singh (30 March 2010). "Moscow blasts put Metro security in alert mode". The Times of India. Archived from the original on 3 November 2012. Retrieved 15 April 2010.
- "Commuters Guide to Security on Delhi Metro" (PDF). DMRC. Retrieved 27 April 2022.
- "Mock drills at 4 Metro stations". The Times of India. 26 March 2010. Archived from the original on 3 November 2012. Retrieved 15 April 2010.
- "Metro to raise height of walls at stations". The Times of India. 9 May 2012. Archived from the original on 15 July 2013. Retrieved 9 May 2012.
- "Delhi Metro fare hike chart: DMRC raises ticket prices". financialexpress.com. 10 October 2017. Retrieved 25 April 2022.
- "Delhi Metro fares revised: Here's all you need to know about the fare hike and fare slabs | India.com". www.india.com. 10 May 2017. Retrieved 25 April 2022.
- "Ticket". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- "Smart Cards". DMRC. Retrieved 25 April 2022.
- "Information on Delhi metro's tokens and smart cards". India Today. 1 October 2019. Retrieved 25 April 2022.
- Nag, Devanjana (11 June 2019). "Delhi Metro free rides for women: Travelling from Delhi to NCR and vice-versa? Here's the proposed rule". The Financial Express.
- Bedi, Aneesha (6 November 2019). "Delhi Metro chief says free rides for women not possible until tech updated to check misuse". ThePrint. Retrieved 25 April 2022.
- Dixit, Manas (24 August 2018). "Common Mobility Card for DTC bus, metro". ED Times. Retrieved 27 April 2022.
- "Tourist Card". delhimetrorail.com. Retrieved 25 April 2022.
- "Delhi Metro: National Common Mobility Card facility introduced on Airport Express Line; see features". The Financial Express. 28 December 2020. Retrieved 9 October 2021.
- www.ETTravelWorld.com. "Delhi Metro network to be fully NCMC-compliant by Jun 2023: DMRC - ET TravelWorld". ETTravelWorld.com. Retrieved 26 March 2022.
- "App based QR- Ticketing System". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- Singh, Ramneek (9 March 2022). "Delhi Metro QR ticket: How to book Delhi Metro ticket using QR code via Android mobile phone and iPhone". 91 Mobiles. Retrieved 25 April 2022.
- "Paper QR Ticket". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- Prashar, Sakshi (16 February 2021). "Delhi Metro to introduce QR code-based ticketing system in a bid to go contactless - The Economic Times". The Economic Times. Retrieved 25 April 2022.
- Chitlangia, Risha (15 February 2021). "Delhi Metro to go contactless as DMRC pushes for QR code, RuPay-based ticketing". The Hindustan Times. Retrieved 25 April 2022.
- "Noise barriers not enough, residents want speed of Metro trains to be slowed". Hindustan Times. 2011. Retrieved 14 July 2018.
- Dutta, Sweta (16 November 2009). "Widening reach, Metro looks at ways to ease rush". The Indian Express. New Delhi. Archived from the original on 28 June 2017. Retrieved 15 January 2018.
- Atul Mathur (19 November 2009). "Crowded stations, slow trains". Hindustan Times. Archived from the original on 22 November 2009. Retrieved 21 November 2009.
- Atul Mathur (8 December 2009). "Feeder service or the lack of it". Hindustan Times. Archived from the original on 11 July 2011. Retrieved 8 December 2009.
- "Parking, feeder bus woes on Metros Noida line". Retrieved 12 February 2017.
- "Delhi Metro is second-most unaffordable in world: CSE". The Times of India. Retrieved 6 September 2018.
- Roy, Shubho; Shah, Ajay (December 2018). "Concerns with Delhi Metro". The Leap Blog. Retrieved 21 January 2019.
- "Last Mile Connectivity". delhimetrorail.com. Retrieved 17 July 2020.
Metro Feeder Buses - Service Availability, Routes, Fares & Timings
- "Delhi Metro Rail Corporation - Case study" (PDF). Wifi-Soft.
- "DMRC claims surge in ridership of Delhi Metro". The New Indian Express. 1 August 2019. Retrieved 27 January 2020.
- "Metro ridership was 27.79 lakh, not estimated 53.47 lakh, finds CAG". The New Indian Express. 3 December 2021. Retrieved 8 January 2022.
- "PM calls for a complete lockdown of the entire nation for 21 days". Press Information Bureau. 24 March 2020. Retrieved 11 January 2022.
- "Delhi Metro resumes full services from today. 5 facts you should know". mint. 12 September 2020. Retrieved 16 September 2022.
- "Delhi Metro's Cumulative Ridership for the financial year 2016–2017 crosses one billion (100 crores)". DMRC. Archived from the original (pdf) on 16 April 2017. Retrieved 25 February 2015.
- "Average daily ridership 2004- 14" (PDF). p. 30. Retrieved 25 April 2022.
- "Economic Survey of Delhi 2020–21 - Transport" (PDF). p. 226. Archived from the original (PDF) on 7 April 2023.
- "Annual Report 2006–07" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 26 April 2022. Retrieved 18 May 2022.
- "Annual Report 2007–08" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 26 April 2022. Retrieved 18 May 2022.
- "Annual Report 2008–09" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 26 April 2022. Retrieved 18 May 2022.
- "Annual Report 2009–10" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 26 April 2022. Retrieved 18 May 2022.
- "Annual Report 2010–11" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 26 April 2022. Retrieved 18 May 2022.
- "Annual Report 2011–12" (PDF). Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- "Annual Report 2012-13" (PDF). Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- "Annual Report 2013–14" (PDF). Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- "Annual Report 2014–15" (PDF). Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- "Annual Report 2015-16" (PDF). Delhi Metro Rail Corporation. Retrieved 25 April 2022.
- Singh, Sudheer Pal (31 May 2016). "Delhi Metro Rail finances in the red". Business Standard. New Delhi. Archived from the original on 30 September 2017. Retrieved 22 January 2018.
- "Annual Accounts And Directors Report 2016–17" (PDF). Delhi Metro Rail Corporation. p. 32. Retrieved 25 April 2022.
- "Annual Accounts And Directors Report 2017–18" (PDF). Delhi Metro Rail Corporation. p. 32. Retrieved 25 April 2022.
- "Annual Report 2018-19" (PDF). Delhi Metro Rail Corporation. p. 30.
- "Annual Report 2019-20" (PDF). Delhi Metro Rail Corporation. p. 30.
- "Annual Report 2020-21" (PDF). Delhi Metro Rail Corporation. p. 30.
- "Annual Report 2021-22" (PDF). p. 35.
- "Delhi: Station naming rights pushing up metro income | Delhi News - Times of India". The Times of India. Retrieved 15 February 2022.
- "43 and counting… station branding is doing wonders for Delhi Metro revenue". The Indian Express. 3 May 2018. Retrieved 15 February 2022.
- "IIT Delhi: How a premier IIT fought and won a brand war at Delhi's metro station". The Economic Times. Retrieved 15 February 2022.
- Reuters – Hyundai Rotem gets m order to supply trains. In.reuters.com. Retrieved 24 October 2011.
- "Delhi Metro gets standard gauge train". Business Line. New Delhi: The Hindu. 18 March 2009. Archived from the original on 11 August 2011. Retrieved 22 January 2018.
- "Metro gets first standard gauge depot". The Hindu. 23 February 2010. Retrieved 22 January 2018.
- "Delhi Metro, India". Railway-Technology.com. Archived from the original on 28 February 2018. Retrieved 12 May 2014.
- "Delhi Metro says no to Maglev technology". The Indian Express. New Delhi. 8 August 2012. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
- P. Manoj (25 August 2005). "BEML to rake in big money from proposed metro projects". The Hindu. Archived from the original on 28 March 2008. Retrieved 26 September 2009.
- "Second Metro rail arrives in Delhi". The Times of India. 15 October 2002. Archived from the original on 9 July 2011. Retrieved 26 September 2009.
- "Rolling Stock: Ensuring Passenger Comfort, Safety and Reliability". DMRC. Archived from the original (jpg) on 21 October 2010. Retrieved 27 September 2010.
- "Metro Rail gets first train". The Hindu. 27 July 2002. Archived from the original on 8 July 2011. Retrieved 26 September 2009.
{{cite news}}
: CS1 maint: unfit URL (link) - "Bombardier to Deliver Further 76 MOVIA Metro Cars to Delhi Metro from Savli India Site". Press Release. Bombardier. 5 September 2011. Archived from the original on 16 November 2011. Retrieved 3 November 2011.
- "Bombardier to supply coaches to Delhi Metro". projectsmonitor.com. Archived from the original on 14 January 2010.
- "Metro to get swankier, bigger coaches". The Times of India. 17 September 2009. Archived from the original on 5 November 2012. Retrieved 26 September 2009.
- "BEML delivers India's 1st standard gauge metro car". The Economic Times. New Delhi. 11 September 2009. Archived from the original on 15 January 2018. Retrieved 15 January 2018.
- Ramachandran, Smriti Kak (30 July 2009). "Trial run begins on first standard gauge Metro line". The Hindu. Archived from the original on 3 March 2018. Retrieved 15 January 2018.
- "Airport line handed over to Reliance Infra". The Indian Express. 20 May 2010. Archived from the original on 5 September 2010. Retrieved 5 June 2010.
- "Delhi Airport line contracts finalised" (PDF). Construcciones y Auxiliar de Ferrocarriles. Archived from the original (PDF) on 18 July 2011.
- "Technical Notes: Signalling". DMRC. Archived from the original on 12 March 2008. Retrieved 23 November 2009.
- "Delhi Metro Railway Corporation, India" (PDF). Motorola Electronics. Retrieved 3 January 2010.
- "Metro Line 3, New Delhi, India". Siemens. Archived from the original on 11 December 2008. Retrieved 6 July 2008.
- "Technical Notes: Telecommunication". DMRC. Archived from the original on 26 December 2007. Retrieved 23 November 2009.
- "Delhi Airport Metro Express". Delhi metro times. Archived from the original on 20 January 2015. Retrieved 4 August 2012.
- "Reliance Metro Airport Express, WiFi-enabled, EVS Chakravarthy, CEO YOU Broadband". Business Wire India. Archived from the original on 22 August 2018. Retrieved 22 August 2018.
- "Delhi Metro launches WiFi on Blue Line stations". The Economic Times. 25 August 2017. Retrieved 22 August 2018.
- "Delhi Metro offered fully-automated, driverless train system". Archived from the original on 21 July 2012. Retrieved 25 May 2012.
- "Delhi Metro gets UN certificate for preventing carbon emission". The Times of India. New Delhi. 22 February 2009. Archived from the original on 17 May 2014. Retrieved 15 January 2018.
- "Delhi Metro gets OHSAS 18001". DMRC. Archived from the original on 7 June 2008. Retrieved 10 September 2009.
- "Press Release: Delhi Metro Receives ISO 14001 For Eco-friendly Systems". USAID. 24 December 2002. Archived from the original on 13 September 2009. Retrieved 27 September 2010.
- "Delhi Metro shows the way with water harvesting units". The Times of India. 26 September 2005. Archived from the original on 5 November 2012. Retrieved 27 September 2010.
- "Delhi Metro is first rail project to earn carbon credits". The Economic Times. New Delhi. 5 January 2008. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
- Sinha, Neha (20 December 2009). "Delhi Metro on track to earn carbon credits". The Indian Express. Archived from the original on 23 January 2018. Retrieved 22 January 2018.
- "Metro mulls solar panels at stations to go green". The Times of India. New Delhi. 5 June 2012. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
- "Delhi Metro to install three new solar power plants". Biharprabha. 3 July 2014. Archived from the original on 15 July 2014. Retrieved 22 January 2018.
- Shaikh, Ateeq (23 March 2017). "Airports, hospitals light up 40 gw rooftop solar plan". Daily News and Analysis. Archived from the original on 15 January 2018. Retrieved 22 January 2018.
- "60% of Delhi Metro now powered by solar energy from Madhya Pradesh". World Bank. Retrieved 5 February 2023.
- Mukherjee, Anuradha (13 December 2002). "Vibrant murals bring cheer". The Times of India. New Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
- Preeti Jha (10 October 2007). "Murals by Salwan Public School students decorate Metro pillars on Pusa Road". The Indian Express. Archived from the original on 14 October 2012. Retrieved 2 February 2010.
- "At INA Metro station, a gallery for traditional art, crafts". The Indian Express. New Delhi. 2 September 2010. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
- Smriti Kak Ramachandran (2 September 2010). "Delhi metro gets a handicrafts gallery". The Hindu. Archived from the original on 29 June 2011. Retrieved 21 September 2010.
- "Delhi airport bags Golden Peacock National Quality Award". The Times of India. Retrieved 1 March 2019.
- "Delhi airport, Metro feted for green initiatives". Hindustan Times. 6 October 2016. Retrieved 1 March 2019.
- "DMRC receives Outstanding PSU of year award". India Today. P. T. I. 21 September 2016. Retrieved 1 March 2019.
- "Japanese award to DMRC". Deccan Herald. 30 October 2012. Archived from the original on 2 March 2019. Retrieved 26 April 2022.
- Sharma, Garima. "Delhi Metro in Bollywood films". The Times of India. ISSN 0971-8257. Retrieved 7 April 2023.
- Lal, Niharika. "From 5-6 per year, films shot in Metro down to 1". The Times of India. ISSN 0971-8257. Retrieved 7 April 2023.
- "Delhi Metro's fleeting 15 minutes of fame". The Hindu. 26 March 2016. ISSN 0971-751X. Retrieved 7 April 2023.
- "Delhi Metro finds many takers in film world". Hindustan Times. 21 July 2014. Retrieved 7 April 2023.
- "Amitabh, Abhishek shoot for Paa in Delhi Metro". India Today. Retrieved 7 April 2023.
- "Hrithik-Katrina film shoot creates traffic mess". The Times of India. 3 March 2014. ISSN 0971-8257. Retrieved 7 April 2023.
- "Hrithik Roshan, Katrina Kaif's Bang Bang shoot halts Delhi traffic". Hindustan Times. 2 March 2014. Retrieved 7 April 2023.
- "War is entertaining and worth every penny". The Sunday Guardian Live. 5 October 2019. Retrieved 7 April 2023.
Further reading
- Rashmi Sadana (30 May – 2 June 2012). "Metrocity Journal: Up, Up and Away". The Wall Street Journal.
- Rashmi Sadana (13 November 2010). "On the Delhi Metro: An Ethnographic View". Economic and Political Weekly. 45 (46): 77–83.
- G. S. Dhillon (29 January 2004). "Trenchless tunnelling". The Tribune.
- A dream revisited: an archival journey into the making of the Delhi Metro Rail. DMRC. 2003. OCLC 54073649.
- A journey to remember. DMRC. 2008. p. 94. OCLC 300027063.