Rail transport in India is an important mode of conveyance for people and goods in India. Indian Railways (IR) is the primary operator of rail operations throughout the country. IR is a state-owned organisation of the Ministry of Railways, which historically had its own government budget. Between 2019 and 2020, 22.15 million passengers used the Indian Railways network daily. In the same period, 3.32 million metric tons of freight was also shipped daily on the IR network.[1]

Railway Transport In India
Operation
National railwayIndian Railways
Statistics
Ridership8.086 billion[1]
Passenger km1.500 trillion [1]
Freight1.208 billion tonnes[1]
System length
Total
  • 68,043 km (42,280 mi) (route)[1]
  • 102,831 km (63,896 mi) (running track)[1]
  • 128,305 km (79,725 mi) (total track)[1]
  • as of March 2022
Double track
  • 37,551 km (23,333 mi) (route with multiple tracks) (2023)[1]
Electrified
  • 58,812 km (36,544 mi) (route) (2023)[2]
Track gauge
1,676 mm (5 ft 6 in) broad gauge68,043 km (42,280 mi) (2023)[1]
1,435 mm (4 ft 8+12 in) standard gauge1,225 km (761 mi) (2023)[1]
1,000 mm (3 ft 3+38 in) metre gauge1,080 km (670 mi) (2023)[1]
Two narrow gauges, 762 mm (2 ft 6 in) and 610 mm (2 ft)1,521 km (945 mi) (2023)[1]
Features
No. bridges160,000 (2020)[1]
No. stations7,325 (2023)[1]
Highest elevationCurrent: 2,257 m (7,405 ft). Future: 5,359 m (17,582 ft)
 atCurrent: Ghum on the Darjeeling Himalayan Railway. Future: Taglang La in Ladakh
Lowest elevation3 m (10 ft)
 atBurra Bazar and Honnavar

Other locally owned public corporations operate various suburban and urban railways throughout the country, such as Chennai Metro and the trams in Kolkata. Private sector operations currently exist only for freight trains and railroads, exclusively for non-passenger usage, but there were renewed efforts in 2020 to encourage private sector involvement in the running of passenger trains.[3]

In March 2022, the national rail network comprised total route length of 68,043 km (42,280 mi), running track length of 102,831 km (63,896 mi) and total track length of 128,305 km (79,725 mi) and 7,325 stations.[1] India's national rail network is the fourth-largest in the world (after those of the United States, China and Russia).[4] 36.83% of routes are double or multi-tracked.[1] As of April 2023, 58,812 km (36,544 mi) of all the routes have been electrified with 25 KV AC electric traction.[2] It is one of the busiest networks in the world, transporting 8.086 billion passengers and 1.208 billion tonnes of freight annually.[1] IR is the world's eighth largest employer, with more than 1.254 million employees as of March 2020.[1] As of March 2020, IR's rolling stock consisted of 293,077 freight wagons, 76,608 passenger coaches and 12,729 locomotives.[1]

The government has committed to electrifying India's entire rail network by 2023–24, and become a "net zero (carbon emissions) railway" by 2030.[5] India plays a supporting role in the improvement of rail infrastructure overseas. As of 2018, India has invested over $1 billion towards upgrading railways and trains in Sri Lanka using 'Make in India' technology.[6] As of 2020, only three rail connections to foreign countries were functioning, two to Nepal and three to Bangladesh, though an 18 km railway link to Bhutan is also under construction and there have been efforts to reinstate the historic Boat Mail train to Sri Lanka.[7][8]

History

1832–1852: Industrial railways

The first proposals for railways in India were made in Madras in 1832.[9] The first train in India ran from Red Hills to Chintadripet bridge in 1836–1837.[9] It was called the Red Hill Railway and used a rotary steam locomotive manufactured by William Avery. The railway was built by Sir Arthur Cotton and was mainly used for transporting granite stones for road-building work in Madras.[9] In 1845, Cotton built the Godavari Dam Construction Railway at Dowleswaram in Rajahmundry, used to supply stone for construction of a dam on the Godavari River.[9]

On 8 May 1845, the Madras Railway was incorporated, and the East Indian Railway Company (EIR) was incorporated the same year. On 1 August 1849, the Great Indian Peninsula Railway (GIPR) was incorporated by an Act of Parliament. A "guarantee system" providing free land and guaranteeing five-percent rates of return to private English companies building railways was finalised on 17 August 1849. In 1851, the Solani Aqueduct Railway was built in Roorkee; freight was hauled by a steam locomotive called Thomason, after a British officer. It was used for transporting construction materials for an aqueduct over the Solani river.[9] In 1852, the Madras Guaranteed Railway Company was incorporated.

1853–1924: Passenger railways and expansion

Thane railway viaducts
The smaller railway viaduct (top) and the longer railway viaduct (bottom) near Thane in 1855.

The first passenger train in India ran between Bombay (Bori Bunder) and Thane on 16 April 1853. The 14-carriage train was hauled by three steam locomotives  Sahib, Sindh and Sultan; it carried 400 people and ran on a line of 34 kilometres (21 mi) built and operated by the Great Indian Peninsula Railway.[10][11] This line was built in 1,676 mm (5 ft 6 in) broad gauge, which became the standard for railways in the country. In May 1854, the Bombay–Thane line was extended to Kalyan by India's first railway bridges, the Thane viaducts, over Thane Creek.[12] In Eastern India, the first passenger railway train ran from Howrah (near Calcutta) to Hoogly on 15 August 1854. The 39-kilometre (24 mi) line was built and operated by EIR.[13] In August 1855, the EIR Express and Fairy Queen steam locomotives started hauling trains.[14] The first passenger train in South India ran from Royapuram and Veyasarapady to Wallajah Road on 1 July 1856 on a 97-kilometre (60 mi) line built and operated by Madras Railway.[15]

On 24 February 1873, the first tramway, a 3.8-kilometre (2.4 mi) horse-drawn tramway, opened in Calcutta between Sealdah and Armenian Ghat Street.[16] On 9 May 1874 a horse-drawn tramway began operation in Bombay between Colaba and Parel. In 1880 Calcutta Tramways Company was incorporated.[17]

GIPR started its first workshops in Byculla in 1854 and Madras Railway set up their first workshop at Perambur in 1856. The railway boom continued with the incorporation of the Bombay, Baroda, and Central India Railway (BB&CI) in 1855,[18] Eastern Bengal Railway in 1858,[19] and the East Coast State Railway in 1890. The Great Southern of India Railway (GSIR) and the Carnatic Railway merged in 1874 to form the South Indian Railway.

In 1897, lighting in passenger coaches was introduced by many railway companies. In 1902, the Jodhpur Railway became the first to introduce electric lights as standard fixtures. In 1920, electric lighting of signals was introduced between Dadar and Currey Road in Bombay.

1925–1951: Electrification and further expansion

The first railway budget was presented in 1924. The Oudh and Rohilkhand Railway was merged with the East Indian Railway Company (EIR) in the same year.[20] In 1930, the route of the Grand Trunk Express was changed to Delhi–Madras.

On 3 February 1925, India's first electric passenger train ran between Victoria Terminus (VT) and Kurla on 1500 V DC overhead traction[21] with locomotives provided by the Cammell Laird and Waggonfabrik Uerdingen companies. Later that year the VT–Bandra section was electrified with an elevated platform at Sandhurst Road.[21] Kurla–Kalyan and lines to Poona and Igatpuri were electrified in 1926[21] and the Bandra–Virar section was electrified by January 1928. On 1 June 1930, the Deccan Queen began running, hauled by a WCP-1 (No. 20024, old No. EA/1 4006) with seven coaches, on the GIPR's electrified route from Bombay VT to Poona.[22]

The Frontier Mail made its inaugural run between Bombay VT and Peshawar in 1928.[23] In 1929, the Grand Trunk Express began running between Peshawar and Mangalore[24] and the Punjab Limited Express began running between Bombay and Lahore. Technical advancements led to automatic colour-light signals become operational on GIPR's lines between Bombay VT and Byculla in 1928.[25] This was extended to the Byculla–Kurla section in the following year.

1951–1983: Zonal re-organisation and further developments

The Rajdhani Express first launched in 1969.

India's railways were re-organised into regional zones beginning in 1951[26] with the creation of the Southern Railway on 14 April and the Central Railway and Western Railways on 5 November.[27] The post of Chief Commissioner of Railways was abolished and the Railway Board adopted the practice of making its senior-most member chairman.[27] In the same year, the government of West Bengal entered into an agreement with Calcutta Tramways Co. to take over its administrative functions. On 14 April 1952, the Northern Railway, the Eastern Railway and the North-Eastern Railway were created.[27] On 1 August 1955 the South-Eastern Railway was split from the Eastern Railway, and, the following year, divisional systems of administration were set up for the various regional zones. In 1958, the North-Eastern Railway split to form a new Northeast Frontier Railway.[27]

In 1952, fans and lights were mandated for all compartments in passenger accommodation and sleeping accommodation was introduced in coaches. In 1956 the first fully air-conditioned train was introduced between Howrah and Delhi.[28] In 1966 the first containerised freight services began, between Bombay and Ahmedabad.

In 1957 India Railways decided to adopt 25 kV AC electrification and chose the SNCF (French National Railway) as its technical consultant.[29] The Main Line Electrification Project was established in the same year.[30] Raj Kharswan–Dongoposi became the first section to be electrified with 25 kV AC traction,[29] with the first train running on 11 August 1960.[29] In 1966 electrification of several suburban tracks around Delhi, Madras and Calcutta was completed with the 25 kV AC system. In 1979 the Main Line Electrification Project was reconstituted into the Central Organisation for Railway Electrification (CORE).

1984–present: Rapid transit and later developments

The Tejas Express launched in 2017.
Vande Bharat Express, India's fastest train and India's first long-distance intercity trainset, launched in 2019

The Calcutta Metro became the first metro in the country[31] with the 24 October 1984 line between Esplanade and Bhowanipore.[32] In 1988 the first Shatabdi Express was introduced between New Delhi and Jhansi (later extended to Bhopal), and was the fastest train in India at the time.[33] In 1993, air-conditioned third-tier coaches were introduced as well as a sleeper class separate from second class. In 1999, the South East Central Railway zone was established. On 6 July 2002, the East Coast, South Western, South East Central, North Central, and West Central zones were created.[34] On 5 April 2016, Gatimaan Express, then India's fastest train with a maximum speed of 160 km/h (99 mph), made its first run from Delhi to Agra.[35]

India's first computerised ticketing and reservation was introduced in New Delhi in 1986. In 1990, the first self-printing ticket machine (SPTM) was introduced. In September 1996, the CONCERT computerised reservation system was fully deployed at New Delhi, Mumbai and Chennai. The project was completed nationwide on 18 April 1999. In 1998, coupon validating machines (CVMs) were introduced at Mumbai CST. Credit cards could be used to book tickets and reservations starting in 1999, and in February 2000, the Indian Railways launched its web site[36] and began taking online train reservations and ticketing on 3 August 2002, which was extended to many cities in December.[37] On 26 September 2013, the Tatkal system of ticketing extended to ordinary trains.

On 16 January 1995, the first regularly scheduled services using the 2 × 25 kV system of traction started on BinaKatni. On 5 February 2012, Western Railway switched completely to 25 kV AC traction, ending its use of 1.5 kV DC traction.[38] On 11 April 2016, Central Railway completed switching to 25 kV AC traction, ending the use of DC traction on the country's main-line rail network.[39] Indian Railways announced on 31 March 2017 that the entire rail network would be electrified by 2022.[40] Between the financial year 2022 to 2023, Indian Railways recorded a freight loading of 1512 million metric tonnes, which was Indian Railways' highest ever recorded freight loading.[41]

IR's Research Design and Standards Organisation (RDSO) undertakes research, design and standardisation. The railway has undertaken several initiatives to upgrade its ageing infrastructure and improve its quality of service. The Indian government plans to invest 9.05 trillion (US$110 billion) to upgrade IR by 2020.[42]

Infrastructure modernisation projects include high-speed rail, with the first Ahmedabad-Mumbai train in operation for 2022;[43][44][45] the redevelopment of 400 stations by monetizing 2,700 acres (11 km2) of spare railway land under a 1,070,000 crore (US$134 billion) plan;[46] doubling tracks to reduce congestion and delays while improving safety;[47] the refurbishing of 12- to 15-year-old coaches at the Carriage Rehabilitation Workshop in Bhopal to enhance passenger amenities and fire safety;[48][49] use of Global Positioning System (GPS)-enabled tracking of trains to improve safety and service;[50] Digital India-driven 3,500,000 million (equivalent to 4.9 trillion or US$61 billion in 2023) digitalisation of the railway to improve efficiency and reduce cost;[47] rainwater harvesting, with 1885 systems installed by December 2016;[51] and reforestation of railway land and along the tracks.[52]

All routes will be electrified to save on imported-fuel costs.[47] Off-the-grid solar-powered trains are planned with the installation of one gigawatt of solar and 130 megawatts of wind power between 2017 and 2022; India introduced the world's first solar-powered train and 50 coaches with rooftop solar farms in June 2017.[53][54][55] Initial assessments of this experiment have been positive.[56] Rooftop solar electricity is planned at stations to reduce long-term fuel costs and protect the environment.[57] and Sustainable LED lighting at all the stations was completed by March 2018 which saves Rs 500 million per annum in electricity bills.[58] Locomotive factories have been modernised, including two new factories in Bihar: an electric locomotive factory in Madhepura and a diesel locomotive factory in Marhaura, and 2,285 bio-toilets were introduced from April to July 2014.[59][60][61] A 200 billion (US$2.5 billion) partnership with Alstom to supply 800 electric locomotives from 2018 to 2028 was announced.[42]

All the unstaffed level crossings were eliminated by January 2019, and staffed level crossings are being progressively replaced by overbridges and underbridges.[62][47] Other safety projects include the extension of an automated fire alarm system, first introduced on Rajdhani Express trains in 2013, to all air-conditioned coaches;[63] and 6,095 GPS-enabled Fog Pilot Assistance System railway signalling devices (replacing the practice of placing firecrackers on tracks to alert train drivers) installed in 2017 in four zones: Northern, North Central, North Eastern and North Western; and replacing ICF coach with LHB coach.

Historical railway length

This table shows the length of the railway over time.

Year Route km Running track km Total track km
1950–51 53,596 59,315 77,609
1960–61 56,247 63,602 83,706
1970–71 59,790 71,669 98,546
1980–81 61,240 75,860 104,480
1990–91 62,367 78,607 108,858
2000–01 63,028 81,865 108,706
2010–11 64,173 87,114 114,037
2015–16 66,252 92,084 119,630
2016–17 66,918 93,902 121,407
2017–18 66,935 94,270 122,873
2018–19 67,415 95,981 123,542
2019–20[64] 67,956 99,235 126,366
2020–21[65] 68,103 100,866 126,611
2021–22[66] 68,043 102,831 128,305
2022–23[66] 80,529 107,043 130,844
2023–24[66] 92,952 111,255 132,444

Route km : The distance between two points on the railway irrespective of the number of lines connecting them, whether single line or multiple line.
Running track km: The length of all running tracks excluding tracks in sidings, yards and crossings.
Total track km: The length of all running tracks and tracks including tracks in sidings, yards and crossings.

Historical railway maps

Rolling stock

Locomotives

A passenger class WDP-4D class diesel locomotive developed in 2001.

Locomotives in India largely consist of electric and diesel locomotives. The world's first compressed natural gas (CNG) locomotives are also used.[67] Steam locomotives are used only in heritage trains.

In India, locomotives are classified according to their gauge, motive power, the work they are suited for and their power or model number. The class name, composed of four or five letters, encodes this information. The first letter denotes the track gauge; the second denotes their motive power, diesel or alternating current (electric); the third letter denotes the type of traffic for which they are suited (goods, passenger, multi or shunting). The fourth letter used to denote the chronological model number, but from 2002 it denotes the horsepower range for diesel locomotives. Electric locomotives are not covered by this scheme and not all diesels are covered; for these, the fourth letter denotes their chronological model number.

A locomotive may have a fifth letter in its class name which denotes a technical variant, subclass or subtype, indicating a variation in the basic model or series, possibly different motors or a different manufacturer. With the modern scheme for classifying diesel locomotives the fifth letter further refines the horsepower indication in 100 hp (75 kW) increments: 'A' for 100 hp, 'B' for 200 hp, 'C' for 300 hp, etc.

Under this scheme, a 'WDM-3A', for example, refers to a wide-gauge diesel multi-use 3100 hp locomotive, while a 'WDM-3D' would be a 3400 hp locomotive and 'WDM-3F' would be 3600 hp locomotive.[note 1]

Diesel locomotives are fitted with auxiliary power units which save nearly 88% of fuel while idling.[68]

Goods wagons

A covered wagon

A new wagon numbering system was adopted by Indian Railways in 2003.[69] Wagons are allocated 11 digits,[70] making identification easier and allowing for computerisation of a wagon's information. The first two digits indicate the type of wagon, the third and fourth digits indicate the owning railway, the fifth and sixth digits indicate the year of manufacture, the seventh through tenth digits indicate the Individual Wagon Number, and the last digit is a check digit.

IR's bulk requirement of wagons is met by wagon manufacturing units both in public and private sectors as well as other public sector units under the administrative control of Ministry of Railways.[1]

Passenger coaches

On long-distance routes and also on some shorter routes, IR uses two primary types of coach design types. ICF coach, in production from 1955 until January 2018,[71] constitute the bulk of the current stock. These coaches, considered to have inadequate safety features, are slowly being phased out. As of September 2017, around 40,000 coaches are still in operation.[72] These coaches are being replaced with LHB coach. Introduced in mid '90s, these coaches are lighter, safer and are capable of speeds up to 160 km/h (99 mph).[73]

IR has introduced new electric multiple unit (EMU) train sets for long-distance routes. One such, Train-18 is under operation and another, Train-20 is expected to run from 2023. These train sets are expected to replace locomotive-hauled trains on long-distance routes.[74]

On regional short-distance routes, IR runs Mainline electrical multiple unit (MEMU) or Diesel electrical multiple unit (DEMU) trains, depending on the traction available. These train sets are self-propelled with capability for faster acceleration or deceleration and are expected to reduce congestion on dense routes. Passenger locomotive-hauled trains, having frequent stops, are slowly being replaced with train sets across India.[75]

On suburban commuter routes around large urban centers, IR runs trains with normal electric multiple unit (EMU) coaches. These are popularly called "local trains" or simply "locals".[76]

EMUs are also used in metros. All train sets used in metros are air-conditioned.[77] Kolkata trams almost always consist of a single motor coach. A new twin coach tram was introduced in Kolkata in 2019.[78]

Manufacturing

The Chittaranjan Locomotive Works in Chittaranjan, Banaras Locomotive Works in Varanasi and Patiala Locomotive Works in Patiala make electric locomotives. The Integral Coach Factory in Perambur, Chennai, makes integral coaches. These have a monocoque construction, and the floor is an integral unit with the undercarriage. The Rail Coach Factory in Kapurthala and Modern Coach Factory in Raebareli also makes coaches. Companies like SRBWIPL, JWL, Texmaco Rail & Engg, Titagarh Wagons and many more build freight wagons. The Rail Wheel Factory at Yelahanka, Bangalore, and the Rail Wheel Plant, Bela, in Chhapra, Bihar, manufactures cast wheels and axles. Patiala Locomotive Works, Patiala also upgrades the diesel locomotives. Electric Locomotive Factory at Madhepura set up by the India Railways in joint venture with Alstom is used for production of WAG 12B.[79] Indian Railways joined hands with General Electric to set up Diesel Locomotive Factory at Marhaura in Bihar.[80] Some electric locomotives have been supplied by BHEL, and locomotive components are manufactured in several other plants around the country.[81] The consortium of Titagarh Wagons and Ramkrishna Forgings won the contract to manufacture and supply forged wheel for Indian Railways.[82] The demand of forged wheels for the railways is also met by SAIL-Durgapur Plant and RINL Forged Wheel Plant in Raebareli.[83][84]

Network

Indian Railways consists of 18 Zones, each having four to six Divisions and one Zonal Head Quarters. Mumbai and Kolkata are only cities having two Zonal Head Quarters.

The fastest train of India currently is 22435/22436 Varanasi - New Delhi - Varanasi Vande Bharat Express having 96 km/h (60 mph) average speed and can run up to speed of 180 km/h (110 mph). The longest railway platform of India and in the world currently is Hubballi with 1,505 metres (4,938 ft) length. Howrah Junction is the largest railway station of India having 24 Platforms. Mumbai Suburban Railway is one of the busiest in the world, Kolkata Suburban Railway is one the longest in the world and Delhi Metro is one the longest and busiest Metro Railways in the world. India has the Lowest Railway Line Density in the world with just 35.37 square kilometer area per 1 kilometer Railway track. India has 20 Types of Passenger Train Services, the most in the World as per Passenger Train Services Types. Percentage of Electrified Railway Line in India is at 90.52%, the highest among all Railway systems in the world.

Tracks

Comparison of gauges in India with the standard gauge

As of July 2023, IR network comprises of total route length of 68,043 km (42,280 mi), running track length of 102,831 km (63,896 mi) and total track length of 128,305 km (79,725 mi).[1] Track sections are rated for speeds ranging from 80 to 200 km/h (50 to 124 mph), though the maximum speed attained by passenger trains is 180 km/h (110 mph) during trial runs. The entire broad-gauge network is equipped with long-welded, high-tensile strength 52 kg/60 kg 90 UTS rails and pre-stressed concrete (PSC) sleepers with elastic fastenings.[1]

1,676 mm (5 ft 6 in) broad gauge is the gauge used by IR and spans almost the entire network, as of 31 March 2023. It is the broadest gauge in use across the world for regular passenger movement.

The 1,000 mm (3 ft 3+38 in) metre gauge tracks and 762 mm (2 ft 6 in) and 610 mm (2 ft) narrow gauge tracks are present only on the heritage routes as of 31 March 2023.

Urban rail transit systems in India mostly use standard gauge tracks. These systems are operated by metro/tram rail corporations which are independent of Indian Railways. Trams in Kolkata, the only remaining tram service in the country, uses standard gauge tracks. Line 1 of the Kolkata Metro and Delhi Metro use the same broad gauge tracks as main-line railways. All other metro lines  constructed, under construction and future  use standard gauge tracks.[85] Metro trains operate in Kolkata, Delhi, Bengaluru, Chennai, Mumbai, Hyderabad, Jaipur, Kochi, Nagpur, Ahmedabad and Lucknow. Gurgaon has a Metro system operated by a private organisation. Metro tracks are being constructed or planned in all million-plus cities in the country.

Electrification

As of 1 April 2023, IR has electrified 58,812 km (36,544 mi) of the total routes. India uses 25 kV 50 Hz AC traction on all its electrified tracks.[1][2]

Railway electrification in India began with the first electric train, between Chhatrapati Shivaji Terminus and Kurla on the Harbour Line, on 3 February 1925 on the Great Indian Peninsula Railway (GIPR) at 1500 V DC. Heavy gradients in the Western Ghats necessitated the introduction of electric traction on the GIPR to Igatpuri on the North East line and Pune on the South East line. On 5 January 1928, 1500 V DC traction was introduced on the suburban section of the Bombay, Baroda and Central India Railway between Colaba and Borivili, and between Madras Beach and Tambaram of the Madras and Southern Mahratta Railway on 11 May 1931, to meet growing traffic needs.[86] The 3000 V DC electrification of the Howrah-Burdwan section of the Eastern Railway was completed in 1958. The first 3000 V DC EMU service began on the Howrah-Sheoraphuli section on 14 December 1957.[86]

Research and trials in Europe, particularly on French Railways (SNCF), indicated that 25 kV AC was an economical electrification system. Indian Railways decided in 1957 to adopt 25 kV AC as its standard, with SNCF their consultant in the early stages. The first 25 kV AC section was Raj Kharswan–Dongoaposi on the South Eastern Railway in 1960. The first 25 kV AC EMUs, for Kolkata suburban service, began service in September 1962. For continuity, the Howrah–Burdwan section of the Eastern Railway and the Madras Beach–Tambaram section of the Southern Railway were converted to 25 kV AC by 1968. Because of limitations in the DC traction system, a decision was made to convert the electric traction system of the Mumbai suburban rail network of WR and CR from 1.5kV DC to 25 kV AC in 1996–97. The conversion from DC to AC traction was completed in 2012 by the Western Railway, and in 2016 by the Central Railway. Since then, the entire electrified mainline rail network in India uses 25 kV AC, and DC traction is used only for metros and trams.[86]

Indian Railways announced on 31 March 2017 that the country's entire rail network would be electrified by 2022.[87][88] Though not a new concept, the electrification in India has now been committed to with an investment of 35,000 crore (US$4.4 billion) to electrify the entire network and eliminate the cost of fuel for transportation, which will amount to a savings of 10,500 crore (US$1.3 billion) overall. These savings will allow the government channel funds to invest in the modernisation of the railway infrastructure.[89] Close to 30 billion units of electricity will be required for railway electrification on an annual basis by 2022, which will lead to opportunities for IPPs of conventional power.[88]

All metro routes, as well as the Kolkata tram, are electrified with DC traction. Many metro routes employ the third rail method for electric traction.[90]

Signaling and telecommunication

A railway signal

IR uses a range of signalling technologies and methods to manage its train operations based on traffic density and safety requirements.

As of March 2020, around 3,309 km (2,056 mi) of the route uses automatic block signalling for train operations – concentrated in high density routes, large cities and junctions.[1] Remaining routes are based on absolute block signalling with trains manually controlled by signalmen from the signal boxes typically located at stations. Few low density routes still use manual block signalling methods with communication on track clearance based on physical exchange of tokens.[91] In a few sections, intermediate block signalling is provided to further enhance line capacity with minimal investment. As of March 2020, 602 block sections have intermediate block signals on IR.[1]

IR primarily uses coloured signal lights, which replaced semaphores and disc-based signalling (dependent on position or colour).[92] IR uses two-aspect, three-aspect and four (or multiple) aspect colour signalling across its network.[93]

Signals at most stations are interlocked using panel interlocking, route-relay interlocking or electronic interlocking methods, which eliminate human error. IR uses track circuiting, and block proving axle counters for train detection. As of March 2017, 5,886 stations across IR have interlocked stations and multi-aspect signalling. Around 99% of key routes (A, B, C and D) have track circuitry or block proving axle counters for automated train detection. IR has about 59,105 route kilometers of optical fiber cable network across India, that is used for train control, voice and data communication. Around 3,445 km (2,141 mi) of the route is covered by GSM-R based Mobile Train Radio Communication.[1]

In December 2017, IR announced that it will implement ETCS Level 2 system for signalling and control on key routes with an investment of 12,000 crore (US$1.5 billion).[94] Currently IR uses Centralised Traffic Control (CTC) on the busy Ghaziabad – Kanpur route and real-time train monitoring systems on Mumbai and Kolkata suburban routes.[1]

International connections

Rail links between India and neighbouring countries are not well developed.

Bangladesh

Bangladesh is connected by the five days a week Maitree Express, which runs from Kolkata railway station to Dhaka Cantonment, the Bandhan Express, which began running commercial trips between Kolkata railway station and Khulna railway station[95][96] and Mitali Express connecting New Jalpaiguri railway station with Dhaka Cantonment railway station which started commercial services from 1 June 2022.[97]

Indian and Bangladeshi governments planned to start work by January 2015 on a new rail link to ease surface transport.[98] India will build a 15-kilometre (9.3 mi) railway linking Tripura's capital Agartala with Bangladesh's southeastern city of Akhaura, an important railway junction connected to Chittagong port, resource-rich Sylhet and Dhaka.[99] An agreement to implement the railway project was signed between India's former Prime Minister Manmohan Singh and Bangladeshi Prime Minister Sheikh Hasina during her visit to India in January 2010.[100] The total cost of the proposed project is estimated at 252 crore (2.5 billion). The Indian Railway Construction Company (IRCON) would lay the new railway tracks on both sides of the border. Of the 15 kilometres (9.3 mi) rail line, 5 kilometres (3.1 mi) of tracks fall in Indian territory.[101][102] The Northeast Frontier Railways (NFR) is laying tracks to connect Tripura's southernmost border town, Sabroom, 135 km (84 mi) south of here. From Sabroom, the Chittagong international sea port is 72 km (45 mi).[103]

Bhutan

An 18-kilometre (11 mi) railway link with Bhutan is being constructed from Hasimara in West Bengal to Toribari in Bhutan.

Myanmar

No rail link exists with Myanmar but a railway line is to be built from Jiribam (in Manipur) to Tamu through Imphal and Moreh.[104] The construction of this missing link, as per the feasibility study conducted by the Ministry of External Affairs through RITES Ltd, is estimated to cost 29.41 billion (US$370 million).[105]

Nepal

Two rail links to Nepal exist: A passenger service between Jainagar and Janakpur which is run and operated by Nepal Railways and freight services between Raxaul and Birganj.[106]

Pakistan

Two trains were operated to Pakistan: the Samjhauta Express between Delhi and Lahore, and the Thar Express between Jodhpur and Karachi. Since 2019, both services have been shut down.[107][108]

Services

Station categories

From December 2017, stations are categorised into the Non-Suburban Group NSG1 to NSG6, the Suburban Group SG1 to SG3, and the Halt Group HG1 to HG3 based on the earnings, passenger footfall and strategic importance.[109]

Before December 2017, stations were classified into A1, A, B, C, D, E and F categories, based only on the passenger earnings from the sales of platform tickets, thus limiting the ability of IR to better focus its investments in passenger amenities.[109]

Interior of a Vistadome Coach.
Interior of an Anubhuti (EA) coach in the Shatabdi Express
Interior of an AC Chair Car (CC) coach in the Jan Shatabdi Express

Travel classes

Interior of an AC first class (1A) coach in the Rajdhani Express
Interior of an AC three tier (3A) coach in the Dakshin Express
Interior of an AC Chair Car (CC) coach in the Vande Bharat Express
Interior of a Sleeper (SL) coach
Interior of a Second seater (2S) coach

IR has several classes of travel  with or without air conditioning; a train may include just one or several of these. Slow passenger trains have only unreserved seating class whereas Rajdhani, Duronto, Shatabdi, Garib Rath and Yuva trains only have air-conditioned classes. The fares are different for each class, with unreserved seating class being the cheapest. The fare of Rajdhani, Duronto and Shatabdi trains includes food served in the train, but for other trains food has to be bought separately. In September 2016, the IR introduced dynamic fares for all accommodation classes for Rajdhani, Duronto and Shatabdi trains (except 1AC and EC classes) to shore up revenue.[110] In long-distance trains a pantry car is usually included and the food is served at the berth or seat itself. Luxury trains such as Palace on Wheels have separate dining cars but fares are comparable to a five-star hotel.

A standard passenger train has four unreserved (also called "general") coaches, two at the front and two at the end, of which one may be exclusively for women. The number of other coaches varies according to the demand and route. A luggage coach may be included at the front or end. In some mail trains, a separate mail coach is attached. Lavatories are communal and feature both the Indian style as well as the Western style.

The following table lists the classes in operation. A train may not include all of these classes.

Class[111] Description[112][113]
Saloon IR has started to operate saloon coaches to give hotel ambience on trains. These coaches operate on charter basis i.e. booking is required. They have a master bedroom, a normal bedroom, a kitchen and window trailing. Four to six extra beds are given to accommodate more people.[114] The first of these coach was attached to the Jammu Mail.[115]
1A AC first class  the most luxurious and expensive class of Indian Railways, with fares almost at a par with airfares. There are eight cabins (including two coupes) in full AC first class coach and three cabins (including one coupe) in the half AC first class coach. The coach has an attendant, and bedding is included in the fare. This air-conditioned coach, present only on popular routes, can carry 18 (full coach) or 10 passengers (half coach).
2A AC two tier  these air-conditioned coaches have sleeping berths across eight bays. Berths are usually arranged in two tiers in bays of six: four across the width of the coach and two lengthwise across the corridor, with curtains along the corridor. Bedding is included in the fare. A coach can carry 48 (full coach) or 20 passengers (half coach).
3A AC three tier  air-conditioned coaches with 64 sleeping berths. Berths are similar to 2A, but with three tiers across the width and two lengthwise for eight bays of eight. They are slightly less well-appointed, usually with no reading lights or curtains. Bedding is included in the fare.
3E AC three tier (economy)  air-conditioned coaches with sleeping berths on the Garib Rath Express. Berths are usually arranged as in 3A, but with three tiers across the width and three lengthwise. Appointments are similar to 3A, and bedding is not included. These coaches are also present in some Duronto Express trains as well.
Vistadome IR operates Vistadome glass roof coaches on some tourist routes. These include Araku Valley, the Konkan Railway, the Kalka-Shimla Railway, the Kashmir Valley, the Kangra Valley, Bengaluru-Mangaluru, Neral-Matheran, New Jalpaiguri-Alipurduar & Guwahati-Haflong routes. These coaches' fares are equivalent to an AC Executive Chair Car. IR also has plans to start Vistadome on the Nilgiri Mountain Railway.[116]
EA Anubhuthi  air-conditioned top-end class of the Shatabdi Express. These coaches were introduced in January 2018. The first train to get these coaches was the Chennai Central–Mysuru Shatabdi Express
EC Executive chair car  an air-conditioned coach with spacious seats and legroom. With four seats in a row, it is used for intercity day travel and is available on the Tejas and the Shatabdi Express.
CC AC chair car  an air-conditioned coach with five seats in a row, used for intercity day travel. Air-conditioned double-deck coaches are used on the Double Decker Express.
SL Sleeper class  the sleeper class is the most common coach on IR, with ten or more SL coaches attached to a train rake. They are sleeping coaches with three berths across the width and two lengthwise, without air-conditioning. They carry 72 passengers per coach.
2S Second seater  similar to CC, without air-conditioning. Double-deck second seaters are used on the Flying Ranee.
UR/GEN Unreserved/General  the least-expensive accommodation, with a seat not guaranteed. Tickets are valid on any train on a route if used within 24 hours of purchase.

At the rear of the train is a special compartment known as the guard's cabin. It is fitted with a transceiver and is where the guard usually gives the all-clear signal before the train departs.

Train types

Trains are sorted into categories which dictate the number of stops on a route, their priority on the network and their fare structure. Each express train is identified by a five-digit number. If the first digit is one or two, they are long-distance express trains. If the first digit is zero, the train is a special train which will operate for a limited period of time with a different fare structure. A first digit of five denotes a passenger train.

The second digit indicates the zone operating the train. However, for high-speed trains, the second digit is either zero or two (the first remains one or two).[117] The third digit denotes the division within the zone which is responsible for maintenance and cleanliness, and the last two digits are the train's serial number.[117] The train numbering system was changed from four digits from December 2010,[118] to accommodate an increasing number of trains.

Trains traveling in opposite directions along the same route are usually labelled with consecutive numbers.[117] However, there is considerable variation in train numbers; some zones, such as the Central Railway, have a less-systematic method of numbering trains.[117]

Trains are classified by average speed.[119] A faster train has fewer stops (halts) than a slower one, and is usually used for long-distance travel. Most express trains have special names to identify them easily. The names of the trains usually denote the regions they connect; the routes they traverse; a famous person; or a tourist spot connected with the train.[120][121]

Train types Description
Vande Bharat Express A semi-high-speed, air-conditioned day time journey train with facilities such as Wi-Fi, snack tables, CCTV cameras, hydraulic-pressure doors and a fire and smoke detection and extinguishing system. It can run at a speed of 180 km/h (110 mph), but due to speed limit of railway track of routes used by Vande Bharat Express, the actual top operating speed is only 130 km/h.[122] It is the first semi-high speed (EMU) train set made in India. It was flagged off on 15 February 2019 by Prime Minister Narendra Modi.
Tejas Express A semi-high-speed, air-conditioned train which had its inaugural run on 24 May 2017, covering 551.7 kilometres (343 mi) in eight hours, 30 minutes. Coaches have bio-vacuum toilets, water-level indicators, tap sensors, hand dryers, integrated Braille displays, an LED TV for each passenger with a phone jack, local cuisine, Wi-Fi, tea and coffee vending machines, magazines, snack tables, CCTV cameras and a fire and smoke detection and extinguishing system. It can run at a speed of 130 km/h (81 mph).
Gatimaan Express The first semi-high-speed, air-conditioned train running between Delhi and Jhansi with a top speed of 160 km/h (99 mph), it is India's fastest train at present.
Shatabdi Express Air-conditioned, intercity trains for daytime travel. Unlike the Rajdhani or the Duronto Expresses, the Shatabdi Express makes a round trip on the same day. The Bhopal Shatabdi Express (train number 12001/12002) is India's second-fastest train between New Delhi and Agra, with an average speed of 90 km/h (56 mph) and a top speed of 150 kilometres per hour (93 mph). The limited-stop trains have Wi-Fi.
Rajdhani Express Limited-stop, air-conditioned trains linking state capital to national capital, they have a top speed of 130–140 km/h (81–87 mph). The 2014 railway budget proposed increasing the Rajdhani and Shatabdi Expresses to 180 km/h (110 mph).
Duronto Express Non-stop (except for technical halts) service introduced in 2009. In January 2016, it became possible to book tickets from those technical stops. They connect India's metros and major state capitals, and were introduced to equal (or exceed) the speed of the Rajdhani Express. With air-conditioned one-, two- and three-tier seating, some have non-air-conditioned sleeper-class accommodations.
Humsafar Express Air-conditioned, three-tier coach trains with LED screens displaying information about stations and train speed, a PA system, vending machines for tea and coffee, charging ports for electronic devices, bio-toilets, smoke alarms, CCTV cameras, curtains and heating and refrigeration facilities for food. Inaugural run was between Gorakhpur to the Anand Vihar Terminal.
AC Express Air-conditioned, limited-stop trains linking major cities, with a speed of about 130 km/h (81 mph).
Double Decker Express Air-conditioned, limited-stop, two-tier express trains for daytime travel
Uday Express Air-conditioned double decker train for overnight travel.
Garib Rath Express Air-conditioned, economy, three-tier trains with a top speed of 130 km/h (81 mph)
Yuva Express Introduced with the Duronto Express to provide air-conditioned travel to young Indians, 60 percent of its seats were reserved for passengers between 18 and 45 years of age. The trains were unsuccessful, and operate only on the Delhi-Howrah and Delhi-Mumbai routes.
Jan Shatabdi Express A more-economical version of the Shatabdi Express, with air-conditioned and non-air-conditioned classes and a top speed of 110 km/h (68 mph)
Sampark Kranti Express Express service to New Delhi
Mahamana Express Superfast train with Indian Railways ModelRake coaches.
Intercity Express Introduced to connect major cities on short routes with high and semi-high speeds. Trains include the Deccan Queen, the Flying Ranee and the Bilaspur Nagpur Intercity Express.
Antyodaya Express Non-reserved, high-speed LHB coach on peak routes to ease congestion.
Jan Sadharan Express Non-reserved express trains on peak routes to ease congestion.
Suvidha Express High priority trains with dynamic pricing on high demand routes.
Superfast Express Trains with a max speed greater than 100–110 km/h (62–68 mph), average speed greater than 55 km/h (34 mph), whose tickets have a super fast surcharge, with stops at very few stations.
Express Trains with a maximum speed greater than 100 km/h (62 mph), average speed greater than 36 km/h (22 mph), with stops at few stations.
Mail These trains earlier had separate mail coaches. Nowadays, mail is carried in luggage coaches like all other trains.
Passenger Slow, economical trains which stop at every (or almost every) station on a route. With generally-unreserved seating. The trains travel at about 40–80 km/h (25–50 mph).
Suburban These trains operate in Mumbai, Delhi, Kolkata, Chennai, Hyderabad, Ahmedabad, Vadodara, Surat, Bengaluru, Pune and between Kanpur and Lucknow, usually stop at every station, and have unreserved seating.
Metro Designed for urban transport, the first metro was the Kolkata Metro. Now the Delhi Metro is becoming largest metro network in the country.
Mountain Railways Three of the lines were declared a World Heritage site as Mountain Railways of India by UNESCO.[123]

Tourism

There are several train services which run for tourists:

Ticketing

An Indian Railway ticket from Bangalore to Pune on Lokmanya Tilak Terminus – Coimbatore Express

India has some of the lowest train fares in the world. Basic passenger traffic is heavily subsidised by more-expensive higher-class fares.[131] Until the late 1980s, Indian Railways ticket reservations were done manually. In 1987 the Railways started using a computerised ticketing system. The entire ticketing system went online in 1995 to provide up-to-date information on status and availability. The ticketing network is computerised to a large extent, with the exception of some remote places. Computerised tickets can be booked for any two points in the country, through the Internet and via mobile phones, though this method carries an additional surcharge.

Discounted tickets are available for senior citizens (above 60 years) and some other categories of passengers including the disabled, students, athletes, persons affected by serious diseases, or persons appearing for competitive examinations. One compartment of the lowest class of accommodation is reserved for women in every passenger-carrying train. Some berths or seats in sleeper class and second class are also reserved for women.[132] Season tickets permitting unlimited travel on specific sections or specific trains for a specific time period may also be available. Foreign tourists can buy an Indrail Pass,[133] which is modelled on the Eurail Pass, permitting unlimited travel in India for a specific time period.

For long-distance travel, reservation of a berth can be made up to 120 days before departure.[132] Details such as name, age and concession (if eligible) are required and are recorded on the ticket. The ticket price usually includes the base fare, which depends on the classification of the train (example: super-fast surcharge if the train is classified as super-fast), the class in which one wishes to travel and the reservation charge for overnight journeys.

If a seat is not available then the ticket is given a waitlist number; otherwise the ticket is confirmed and a berth number is printed on the ticket. A person receiving a wait-listed ticket may be able to obtain a confirmed ticket if there are sufficient cancellations.[132][133] Some of the tickets are assigned to the Reservation against Cancellation (RAC), which is between the waiting list and the confirmed list.[132][133] These allow the ticket holder to board the train and obtain an allotted seat decided by a ticket collector, after the ticket collector has ascertained that a seat is vacant.

Reserved railway tickets can be booked through the website of Indian Railway Catering and Tourism Corporation (IRCTC)[134] and also through mobile phones via SMS. Tickets booked through this site are categorised into iTickets and eTickets. iTickets are booked by a passenger and then printed and delivered to the passenger. eTickets are printed by the passenger and carried while travelling. While travelling on an eTicket, one must carry an authorised valid photo identity card. Cancellation of eTickets is done online, without the requirement for the passenger to go to any counter. Unreserved tickets are available for purchase on the platform at any time before departure. An unreserved-ticket holder may only board the general-compartment class. All suburban networks issue unreserved tickets valid for a limited time. For frequent commuters, a season pass (monthly or quarterly) guarantees unlimited travel between two stops.

Freight service

The Car Carrier freight train

In the freight segment, IR ferries various commodities and fuels in industrial, consumer, and agricultural segments across India. IR has historically subsidised the passenger segment with income from the freight business. As a result, freight services are unable to compete with other modes of transport on both cost and speed of delivery, leading to continuous erosion of market share.[135] To counter this downward trend, IR has started new initiatives in freight segments including the upgrade of existing goods sheds, attracting private capital to build multi-commodity multi-modal logistics terminals, changing container sizes, operating time-tabled freight trains, and tweaking with the freight pricing/product mix.[136] Also, end-to-end integrated transport solutions such as roll-on, roll-off (RORO) service, a road-rail system pioneered by Konkan Railway Corporation in 1999 to carry trucks on flatbed trailers,[137] is now being extended to other routes across India.

A potential game-changer for IR in the freight segment are the new dedicated freight corridors that are expected to be completed by 2020. When fully implemented, the new corridors, spanning around 3,300 km (2,100 mi), could support hauling of trains up to 1.5 km in length with 32.5 ton axle-load at speeds of 100 kilometres per hour (62 mph). They will also free-up capacity on dense passenger routes and allow IR to run more trains at higher speeds. Additional corridors are being planned to augment the freight infrastructure in the country.

Yearwise Freight Load

[138][139][140][141][142]

Year Freight loading (million tonnes)
1950–51 73.2
1960–61 119.8
1970–71 167.9
1980–81 195.9
1990–91 318.4
2000–01 473.5
2003–04 557
2004–05 601.89
2006–07 727.75
2007–08 793.89
2008–09 833.39
2009–10 887.79
2010–11 921.73
2011–12 969.05
2012–13 1008.09
2013–14 1051.64
2014–15 1097.58
2015–16 1104.17
2016–17 1111
2017–18 1161
2018–19 1223
2019–20 1210
2020–21 1233
2021–22 1418
2022–23 1512

Urban rail

The urban rail transit in India consists of systems such as rapid transit (Metro), suburban rail (operated by Indian railways), light rail (Metrolite), tram, regional rail and monorail. India has one of the largest and busiest urban transit systems in the world. As of 2022, the combined length of 822.038 kilometres (510.791 miles) of metro systems in India makes it the fourth longest in operation in the world.[143]

The administration of Urban rail in India falls under the Ministry of Urban Development's Urban Transport wing which is the nodal division for coordination, appraisal and approval of Urban Transport matters including urban rail Projects at the central level since the National Urban Transport Policy in 2006.[144]

Northern Region

Delhi NCR

System Information Currently operational Currently under construction Map Website

Delhi Metro
Locale Delhi

 1   2   3   4   5   6   7   8   9   Airport Express 

Phase 4
 7  Western extension (Maujpur)
 8  Western extension (RK Ashram)
New Lines
 10 

DMRCL
Began operation 24 December 2002 (24 December 2002)
Lines in operation 9
No. of stations 255
Network length 348.12 km (216 mi)
Ridership 1.79 billion (2019)

Delhi Suburban Railway
Locale Delhi

 Ring Line 

Delhi EMU
Began operation 1975 (1975)
Lines in operation 1
No. of stations 21
Network length 35 km (22 mi)
Ridership 44,400 (2019)

Delhi Regional Rapid Transit
Locale National Capital Region

 Delhi–Meerut 

NCRTC
Began operation 2023 (2023)
Lines in operation 0 (1 UC)
No. of stations 51
Network length 349 km (217 mi)
Ridership NA

Noida Metro
Locale Noida

 Aqua Line 

NMRC
Began operation 29 December 2019 (29 December 2019)
Lines in operation 1
No. of stations 21
Network length 29.7 km (18 mi)
Ridership 0.58 million(2022)

Rapid Metro Gurgaon
Locale Gurgaon

 1 

Kol Metro
Began operation 14 November 2013 (14 November 2013)
Lines in operation 1
No. of stations 11
Network length 12.85 km (8 mi)
Ridership 0.19 million(2018)

Rajasthan

System Information Currently operational Currently under construction Map Website

Jaipur Metro
Locale Jaipur

 1 

JMRC
Began operation 3 June 2015 (3 June 2015)
Lines in operation 1
No. of stations 21
Network length 11.97 km (7 mi)
Ridership 7.5 million

Uttar Pradesh

System Information Currently operational Currently under construction Map Website

Lucknow Metro
Locale Lucknow

 1 

UPMRC
Began operation 5 September 2017 (5 September 2017)
Lines in operation 1
No. of stations 21
Network length 22.878 km (14 mi)
Ridership 22 million

Lucknow–Kanpur Suburban Railway
Locale Uttar Pradesh

 Lucknow–Kanpur   Kanpur–Lucknow 

Began operation 1867 (1867)
Lines in operation 1
No. of stations 16
Network length

37 km (23 mi)

Ridership

Barabanki–Lucknow Suburban Railway
Locale Uttar Pradesh

 Barabanki–Lucknow   Lucknow–Barabanki 

Began operation 30 June 2013 (30 June 2013)
Lines in operation 1
No. of stations 10
Network length

72 km (45 mi)

Ridership

Kanpur Metro
Locale Kanpur

 1 

Expansion

 1  Eastern extension (Naubasta)

UPMRC
Began operation 28 December 2021 (28 December 2021)
Lines in operation 1
No. of stations 9
Network length 8.98 km (6 mi)
Ridership -

Western Region

Gujarat

System Information Currently operational Currently under construction Map Website

Ahmedabad Metro
Locale Ahmedabad

 1   2 

Expansion
 1  Eastern extension (Thaltej Gam)
 2  Northern extension (Mahatma Mandir)

GMRC
Began operation 4 March 2019 (4 March 2019)
Lines in operation 2
No. of stations 29
Network length 38.63 km (24 mi)
Ridership

Maharashtra

System Information Currently operational Currently under construction Map Website






Mumbai Metro
Locale Mumbai Metropolitan Region

 1   2   7 

Expansion
 7  Southern extension (CSMIA)
 2  Southern extension (Mankhurd)
New Lines
 3   4   5   6   9 

MMRDA
Began operation 8 June 2014 (8 June 2014)
Lines in operation 3
No. of stations 43
Network length 46.4 km (29 mi)
Ridership 0.54 million (2019)

Mumbai Suburban Railway
Locale Mumbai Metropolitan Region

 Central   Harbour   Nerul–Uran   Trans-Harbour   Vasai Road–Roha   Western 

Central Railway
Western Railway
Began operation 16 April 1853 (16 April 1853)
Lines in operation 7
No. of stations 150
Network length 427.5 km (266 mi)
Ridership 2.92 billion (2019)

Mumbai Monorail
Locale Mumbai

 1 

MMRDA
Began operation 2 February 2014 (2 February 2014)
Lines in operation 1
No. of stations 27
Network length 19.54 km (12 mi)
Ridership

Pune Metro
Locale Pune Metropolitan Region

 1   2 

Expansion
 1  Southern extension (Swargate)
 2  Eastern extension (Ramwadi)
New Line
 3 

PMR
Began operation 6 March 2022 (6 March 2022)
Lines in operation 1
No. of stations 27
Network length

19.54 km (12 mi)

Ridership

Pune Suburban Railway
Locale Pune Metropolitan Region

 Pune–Lonavala   Pune–Daund–Baramati 

Began operation 11 March 1978 (11 March 1978)
Lines in operation 2
No. of stations 37
Network length

63 km (39 mi)

Ridership

Nagpur Metro
Locale Nagpur

 1   2 

metrorailnagpur
Began operation 8 March 2019 (8 March 2019)
Lines in operation 2
No. of stations 36
Network length

40 km (25 mi)

Ridership 0.73 (million)

Eastern Region

West Bengal

System Information Currently operational Currently under construction Map Website




Kolkata Metro
Locale Kolkata metropolitan area

 1   2   3 

Expansion
 2  Western extension (Howrah Maidan)
 3  Northern extension (Esplanade)
New Lines
 4   6 

KMRC
Began operation 24 October 1984 (24 October 1984)
Lines in operation 3
No. of stations 40
Network length 46.96 km (29 mi)
Ridership 1.11 billion

Kolkata Suburban Railway
Locale Kolkata metropolitan area

 Chord link   Circular   Eastern   South Eastern   Sealdah South 

South Eastern Railway
Eastern Railway
Began operation 15 August 1854 (15 August 1854)
Lines in operation 5
No. of stations 458
Network length

1,501 km (933 mi)

Ridership 2.1 billion (2019)
Heritage streetcar
Trams in Kolkata
Locale Kolkata

 Tollygunge – Ballygunge   Gariahat – Esplanade   Shyambazar – Esplanade   Shyambazar – Howrah   Rajabazar – Howrah  15 Routes non operational due to ongoing  2  construction

Began operation 24 February 1873 (24 February 1873)
Lines in operation 5
No. of stations  ?
Network length

33.63 km (21 mi)

Ridership 10 million

Southern Region

Karnataka

System Information Currently operational Currently under construction Map Website


Namma Metro
Locale Bengaluru

 1   2 

Expansion
 2  Western extension (Madavara)
New Lines
 3   4   5 

BMRC
Began operation 20 October 2011 (20 October 2011)
Lines in operation 2
No. of stations 64
Network length 73.81 km (46 mi)
Ridership 1 billion (2020)

Kerala

System Information Currently operational Currently under construction Map Website

Kochi Metro
Locale Kochi

 1 

KMRC
Began operation 17 June 2017 (17 June 2017)
Lines in operation 1
No. of stations 24
Network length 27.4 km (17 mi)
Ridership 20 million

Tamil Nadu

System Information Currently operational Currently under construction Map Website

Chennai Metro
Locale Chennai

 1   2 

Expansion
 1  Southern extension (Kilambakkam)
New Lines
 3   4   5 

Chennaimetrorail
Began operation 29 June 2015 (29 June 2015)
Lines in operation 2
No. of stations 42
Network length 54.65 km (34 mi)
Ridership 0.8 billion

Chennai MRTS
Locale Chennai

 Chennai Beach- Thirumayilai   Thirumayilai- Velachery 

New Lines
 Velachery-St. Thomas Mount 

CMDA
Began operation 1 November 1995 (1 November 1995)
Lines in operation 2
No. of stations 18
Network length

19.34 km (12 mi)

Ridership 164.25 million

Chennai Suburban Railway
Locale Chennai

 North Line   West Line   South Line   West North Line   South West Line   West South Line   Chennai MRTS   Circular Line 

SR
Began operation 1931 (1931)
Lines in operation 8
No. of stations 300+
Network length

1,200 km (746 mi)

Ridership 912.57 million

Private railways

Though state-owned companies like Indian Railways and the various metro companies enjoy a near monopoly in India, a few private railways do exist. These private railway lines are used exclusively for freight.

There are railway lines owned and operated by companies including plantations, sugar mills, collieries and other mines, dams, harbours and ports. Private railways are operated by the Mumbai Port Trust, the Kolkata Port Trust, the Chennai Port Trust,[145] the Visakhapatnam Port Trust and the Bhilai Steel Plant.[145] The Tata Group operate funicular railways at Bhira and at Bhivpuri Road (as well as the Kamshet–Shirawta Dam railway line). The Pipavav Rail Corporation holds a 33-year concession for building and operating a railway line from Pipavav to Surendranagar.[145] The Kutch Railway Company, a joint venture of the Gujarat state government and private parties, is involved (alongside the Kandla Port Trust and the Gujarat Adani Port) to build the GandhidhamPalanpur line.[145]

UNESCO World Heritage Sites

There are two UNESCO World Heritage Sites on Indian Railways, the Chhatrapati Shivaji Maharaj Terminus[146] and the Mountain Railways of India.[147] The latter consists of three separate railway lines located in different parts of India: the Darjeeling Himalayan Railway, a 610 mm (2 ft) narrow gauge railway in Lesser Himalayas in the state of West Bengal, the Nilgiri Mountain Railway, a 1,000 mm (3 ft 3+38 in) metre gauge rack railway in the Nilgiri Hills in the state of Tamil Nadu and the Kalka–Shimla Railway, a 762 mm (2 ft 6 in) narrow gauge railway in the Siwalik Hills in the state of Himachal Pradesh.[147]

Accidents and incidents

According to the India's National Crime Records Bureau, in 2021, more than 16,000 people were killed in almost 18,000 railway accidents across India. 67.7 percent of the railway accidents were due to falls from trains and collisions between trains and people on the track. In the same year, almost 2000 people were killed in around 1500 rail-road crossing accidents across India.[148]

See also

Rail transport
Other

Notes

  1. This classification system does not apply to heritage steam locomotives which retain their historical class names such as M class or WP class.'

    References

    1. "Indian Railways Year Book 2020–21" (PDF).
    2. "Railway Electrification as on 01_04_23" (PDF). indianrailways.gov.in. Retrieved 22 April 2023.
    3. Das, Mamuni (17 January 2020). "Private train operators will pay hefty fines for under-reporting revenues". @businessline. Archived from the original on 14 June 2020. Retrieved 13 June 2020.
    4. "CIA — The World Factbook – Country Comparison :: Railways". CIA. Archived from the original on 26 December 2018. Retrieved 8 July 2009.
    5. "Thumbs up! Indian Railways to go eco-friendly by becoming world's 1st 100% electrified and 'Net-Zero' railway". TheFinancial Express. 16 October 2019. Retrieved 20 November 2019.
    6. "Sri Lanka gets India-funded world-class 'Make in India' passenger train; check features of new service". The Financial Express. 28 January 2019. Archived from the original on 14 June 2020. Retrieved 14 June 2020.
    7. John, Ekatha Ann (18 August 2017). "Tamil Nadu pushes for ferry service with Sri Lanka". The Times of India. Archived from the original on 13 July 2020. Retrieved 29 June 2020.
    8. Saqaf, Syed Muthahar (11 June 2010). "'Boat Mail' to run on main line from August 1". The Hindu. ISSN 0971-751X. Archived from the original on 30 June 2020. Retrieved 29 June 2020.
    9. "[IRFCA] India's First Railways". irfca.org. Archived from the original on 21 February 2018. Retrieved 24 July 2017.
    10. "164 Years Ago On This Day, India's First Train Ran From Mumbai To Thane". 16 April 2017. Archived from the original on 29 July 2017. Retrieved 24 July 2017.
    11. "India's 1st train: When Sahib, Sindh & Sultan blew steam – Times of India". The Times of India. 25 April 2013. Archived from the original on 8 August 2017. Retrieved 24 July 2017.
    12. "Extracts from the Railway Times". Railway Times. 1854. Archived from the original on 23 August 2020. Retrieved 1 January 2019.
    13. "[IRFCA] Indian Railways FAQ: IR History: Early Days – 1". irfca.org. Archived from the original on 7 March 2005. Retrieved 16 August 2007.
    14. "Fairy Queen". irctctourism.com. Archived from the original on 21 April 2018. Retrieved 25 January 2019.
    15. "Legacy of First Railway Station of South India". RailNews Media India Ltd. Archived from the original on 29 July 2017. Retrieved 24 July 2017.
    16. "Kolkata's trams – A ride through history". 2 March 2016. Archived from the original on 29 July 2017. Retrieved 24 July 2017.
    17. "History – The Calcutta Tramways Company [1978] Ltd". calcuttatramways.com. Archived from the original on 4 December 2020. Retrieved 24 July 2017.
    18. "Western Railway". wr.indianrailways.gov.in. Archived from the original on 2 April 2019. Retrieved 24 July 2017.
    19. "Eastern Bengal Railway – Graces Guide". gracesguide.co.uk. Archived from the original on 11 July 2020. Retrieved 24 July 2017.
    20. "History of Indian Railway Budget". Archived from the original on 25 February 2021. Retrieved 24 July 2017.
    21. "Welcome to Official Website of CORE". core.indianrailways.gov.in. Archived from the original on 7 August 2017. Retrieved 24 July 2017.
    22. "Deccan Queen Facts – General Knowledge for Kids – Mocomi". 26 January 2012. Archived from the original on 24 February 2021. Retrieved 24 July 2017.
    23. "Frontier Mail". iaslic1955.org. Archived from the original on 24 February 2021. Retrieved 24 July 2017.
    24. "The Grand Trunk Express". iaslic1955.org. Archived from the original on 24 February 2021. Retrieved 24 July 2017.
    25. "Signalling in India – Past and Present". signalbox.org. Archived from the original on 30 March 2019. Retrieved 24 July 2017.
    26. "History of Railways". kportal.indianrailways.gov.in. Archived from the original on 21 July 2017. Retrieved 25 January 2019.
    27. "Zones" (PDF). indianrail.gov.in. Archived (PDF) from the original on 19 March 2015. Retrieved 18 July 2020.
    28. "160 years of Indian Railways: Here's how AC trains were kept cool". 2 April 2013. Archived from the original on 8 August 2020. Retrieved 24 July 2017.
    29. "Welcome to Official Website of CORE". core.indianrailways.gov.in. Archived from the original on 26 September 2015. Retrieved 1 November 2016.
    30. "Welcome to Official Website of CORE". core.indianrailways.gov.in. Archived from the original on 31 March 2016.
    31. "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Archived from the original on 19 August 2013. Retrieved 24 July 2017.
    32. "History of Kolkata Metro Rail Corporation – KMRC". 4 December 2015. Archived from the original on 30 December 2019. Retrieved 24 July 2017.
    33. "Shatabdi Express – Shatabdi Express Train, Shatabadi Express Timetable, Shatabadi Express Schedule Booking India". iloveindia.com. Archived from the original on 15 July 2017. Retrieved 24 July 2017.
    34. "North Central Railways / Indian Railways Portal". ncr.indianrailways.gov.in. Archived from the original on 21 January 2016. Retrieved 24 July 2017.
    35. "Gatimaan Express reaches Agra within targeted 100 minutes". India Today. 5 April 2016. Archived from the original on 31 May 2020. Retrieved 20 June 2020.
    36. "Indian Railway". indianrailways.gov.in. Archived from the original on 24 July 2017. Retrieved 24 July 2017.
    37. "IRCTC Next Generation eTicketing System". irctc.co.in. Archived from the original on 24 July 2017. Retrieved 24 July 2017.
    38. "Mumbai switches from DC to AC". Archived from the original on 11 July 2020. Retrieved 24 July 2017.
    39. "End of an era: Mumbai bids goodbye to last DC local". 11 April 2016. Archived from the original on 8 November 2020. Retrieved 24 July 2017.
    40. "48 per cent rail tracks electrified, aim to double it in 5 years: Govt". 31 March 2017. Archived from the original on 18 July 2017. Retrieved 24 July 2017.
    41. ANI (3 April 2023). "India Railways records best ever freight business in 2022-23". ANI. Retrieved 23 May 2023.
    42. "GE, Alstom land $5.6-billion deals to supply locomotives for railways". Economic Times. 10 November 2015. Archived from the original on 12 November 2015. Retrieved 13 November 2015.
    43. "Diamond quadrilateral of high-speed trains – A Dastidar, Indian Express, 10 June 2014". Archived from the original on 13 August 2017. Retrieved 22 June 2017.
    44. "India to sign deal with Japan to get first bullet train – The Hindu". The Hindu. Archived from the original on 2 August 2017. Retrieved 22 June 2017.
    45. "India Said to Pick Japan for High-Speed Rail Project – WSJ". Archived from the original on 18 May 2017. Retrieved 22 June 2017.
    46. Railways appoints IRSDC as nodal agency for station redevelopment Archived 23 December 2017 at the Wayback Machine, Livemint, 5 December 2017.
    47. Indian Railways orders conversion to Broad Gauge Archived 23 December 2017 at the Wayback Machine, Rail Digest, 12 April 2017.
    48. "Indian Railways gets first model rake of luxury 'Make in India' coaches". The Economic Times. Bennett, Coleman & Co. Ltd. 11 January 2016. Archived from the original on 14 January 2016. Retrieved 13 January 2016.
    49. "Indian Railways unveils 'Make in India' train coaches with new look". The Financial Express. The Indian Express Group. 13 January 2016. Archived from the original on 15 January 2016. Retrieved 13 January 2016.
    50. "Just like your cabs, you can soon track trains in real time via GPS". DNA India. 30 November 2017. Archived from the original on 2 December 2017. Retrieved 30 November 2017.
    51. Rain Water Harvesting System In Indian Railway Archived 23 December 2017 at the Wayback Machine, 7 December 2016.
    52. India Plants 50 Million Trees in One Day, Smashing World Record Archived 23 December 2017 at the Wayback Machine, National Geographic, July 2016.
    53. "India's first solar-powered DEMU train launched". The Hindu. Archived from the original on 26 July 2018. Retrieved 23 July 2017.
    54. Railways, IIT-Madras tie up to power AC coaches with solar energy. The Times of India (5 August 2013). Retrieved on 17 August 2013.
    55. India's new solar-powered train is the first in the world Archived 23 December 2017 at the Wayback Machine, June 2017
    56. "Rail coaches with rooftop solar". Archived from the original on 26 July 2018. Retrieved 26 July 2018.
    57. "NORTHERN RAILWAYS TO INSTALL 5 MW ROOFTOP SOLAR IN FOUR OF ITS STATIONS". Archived from the original on 3 March 2017. Retrieved 3 March 2017.
    58. "Target of installing LED lights at all stations achieved, says Railways". Business Standard India. Press Trust of India. 31 March 2018. Archived from the original on 22 June 2020. Retrieved 20 June 2020 via Business Standard.
    59. "Locomotive Factories in Bihar: In cold storage for years, two Railway projects to start soon". Indian Express. 30 October 2015. Archived from the original on 31 October 2015. Retrieved 31 October 2015.
    60. "GE Gets $2.6 Billion Indian Railways Contract". Wall Street Journal. 9 November 2015. Archived from the original on 9 November 2015. Retrieved 9 November 2015.
    61. "Rail ministry awards Rs 14,656-cr Marhowra locomotive project to GE". Business Standard. 9 November 2015. Archived from the original on 12 November 2015. Retrieved 9 November 2015.
    62. All unmanned level crossings (UMLCs) on Broad Gauge (BG) have been eliminated on 31st Jan 2019. Archived 11 June 2016 at the Wayback Machine, 12 May 2016.
    63. "Indian Railways develops Automatic Fire and Smoke Detection System". Archived from the original on 8 September 2013. Retrieved 5 September 2013.
    64. Cite web|url=https://indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/pdf/2021/AnnualSS_Book.pdf
    65. Cite web|url=https://indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/pdf/2022/Year%20Book%202020-21-English.pdf
    66. Cite web|url=https://indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/2023/PDF%20Year%20Book%202021-22-English.pdf
    67. "India's first CNG train flagged off". Rediff. Archived from the original on 31 May 2020. Retrieved 20 June 2020.
    68. "New Technology allows Railways to save Rs 20 Lakhs Diesel per Engine". Archived from the original on 8 September 2013. Retrieved 6 September 2013.
    69. "Circular by Ministry of Railways" (PDF). 4 July 2003. Archived (PDF) from the original on 23 December 2018. Retrieved 20 June 2020 via Railway Board.
    70. "Guards Documents". Archived from the original on 21 June 2020. Retrieved 20 June 2020.
    71. @railminindia (25 January 2018). "End of an Era – The historic last ICF coach was flagged off by Senior Techcnician Shri Bhaskar P in the presence of Railway Board Chairman Shri @AshwaniLohani. The 1st ICF coach had been flagged by Prime Minister Shri Lal Bahadur Shastri on 2 October, 1955.pic.twitter.com/qCfl8tVrQy" (Tweet). Archived from the original on 26 July 2018. Retrieved 27 February 2018 via Twitter.
    72. "After spate of accidents, Indian Railways speeds up safety plan; check out the massive task and big numbers involved". The Financial Express. 7 September 2017. Archived from the original on 28 February 2018. Retrieved 27 February 2018.
    73. "Indian Railways Passenger Coaches: Safety Features and Technologies Adopted" (PDF). International Journal of Engineering Technology Science and Research. April 2017. Archived (PDF) from the original on 28 February 2018. Retrieved 27 February 2018.
    74. "At 176 Kmph, These Two Upcoming Trains May Be India's Fastest Ever!". The Better India. 22 January 2018. Archived from the original on 28 February 2018. Retrieved 27 February 2018.
    75. "Loco hauled commuter trains to be replaced with DEMU/MEMU – Times of India". The Times of India. Archived from the original on 26 February 2018. Retrieved 25 February 2018.
    76. "Mumbai local passengers cheer! Indian Railways introduces swanky new 'Uttam' rake; know features". 6 November 2019. Archived from the original on 21 June 2020. Retrieved 20 June 2020.
    77. "Navi Mumbai Metro gets two new swanky rakes, nears 2020 deadline". 11 March 2019. Archived from the original on 21 June 2020. Retrieved 20 June 2020.
    78. "Kolkata tram turns into cool, new-age transport | Kolkata News – Times of India". The Times of India. 30 May 2019. Archived from the original on 13 September 2020. Retrieved 20 June 2020.
    79. Saluja, Nishtha (30 April 2021). "Alstom rolls out 100th e-locomotive from its Madhepura factory in Bihar". The Economic Times. ISSN 0013-0389. Retrieved 7 June 2023.
    80. "Marhaura Rail Engine Factory Delivers 300th Diesel Train Engine to Railways". News18. 29 September 2021. Retrieved 7 June 2023.
    81. "Locomotives — General Information – I". IRFCA.org. Indian Railways Fan Club. Archived from the original on 12 November 2020. Retrieved 4 June 2007.
    82. "Ramakrishna Forging: Titagarh Wagons emerge lowest bidder in forged wheels project". The Times of India. 15 March 2023. ISSN 0971-8257. Retrieved 7 June 2023.
    83. "RINL aims to make 55,000 wheels in FY24 to meet Railways' demand: CMD Atul Bhatt". The Economic Times. 10 April 2023. ISSN 0013-0389. Retrieved 7 June 2023.
    84. "A Game Changer in Production of Wheels at SAIL, Durgapur Steel Plant". pib.gov.in. Retrieved 7 June 2023.
    85. "Railways opts for standard gauge first time in 160 yrs – Latest News & Updates at Daily News & Analysis". 3 June 2013. Archived from the original on 14 February 2021. Retrieved 14 June 2017.
    86. "Brief on Railway Electrification". Archived from the original on 26 September 2015. Retrieved 1 November 2016.
    87. "Uttar Pradesh govt gets DPRs for Meerut, Agra". indianexpress.com. 1 July 2016. Archived from the original on 6 February 2017. Retrieved 22 June 2017.
    88. "Railway Electrification Market in India 2018". Enincon. 20 February 2018. Archived from the original on 20 March 2018. Retrieved 20 March 2018.
    89. "Railway Electrification Market in India 2018" (PDF). Enincon. 20 February 2018. Archived (PDF) from the original on 20 March 2018. Retrieved 20 March 2018.
    90. "Kochi Metro coaches arrive at Muttom Yard". The Economic Times.
    91. "Art of the token exchange". Railscapes. 25 July 2017. Archived from the original on 28 February 2018. Retrieved 28 February 2018.
    92. "Signalling System". IRFCA.org. Indian Railways Fan Club. Archived from the original on 8 August 2020. Retrieved 4 June 2007.
    93. "[IRFCA] Indian Railways FAQ: Signal Aspects and Indications – Principal Running Signals". irfca.org. Archived from the original on 9 August 2020. Retrieved 28 February 2018.
    94. "Indian Railways clears proposal to equip electric locomotives with European train protection systems". Tech2. Archived from the original on 3 February 2018. Retrieved 28 February 2018.
    95. "Bandhan Express, New Train Between Bengal And Bangladesh: 10 Facts". NDTV.com. Archived from the original on 16 November 2017. Retrieved 16 November 2017.
    96. "Bandhan Express makes its first commercial run between Kolkata and Khulna today". The Indian Express. 16 November 2017. Archived from the original on 16 November 2017. Retrieved 16 November 2017.
    97. "mitali express: New Jalpaiguri-Dhaka Mitali Express flagged off". The Times of India. 1 June 2022. Retrieved 9 June 2022.
    98. Koushik Das. "Construction Work Of New India-Bangladesh Railway Link To Begin In 2015". InSerbia News. Archived from the original on 9 September 2014. Retrieved 14 June 2017.
    99. "Work on new India-Bangladesh railway link from 2015-INews – IBNLive Mobile". IBNlive. 18 June 2014. Archived from the original on 6 October 2014. Retrieved 14 June 2017.
    100. "Indian Railway to build a 15-km track linking Agartala with Bangladesh". Archived from the original on 6 October 2014. Retrieved 14 June 2017.
    101. "Work on Agartala-Akhaura rail link to commence soon". The Times of India. Archived from the original on 6 October 2014. Retrieved 14 June 2017.
    102. "Work on new India-Bangladesh railway link from 2015". The Times of India. Archived from the original on 18 July 2014. Retrieved 14 June 2017.
    103. "India, Bangladesh align rail link in Tripura". Meghalaya Times. Archived from the original on 6 October 2014. Retrieved 25 January 2019.
    104. "India's rail-building challenge". By Sudha Ramachandran. Asia Times. 3 January 2007. p. 2. Archived from the original on 3 March 2016. Retrieved 16 April 2009.
    105. "India signs trans-Asian railways pact". Indo-Asian News Service. 2 July 2007. p. 1. Retrieved 16 April 2009.
    106. "Brief on the matter relating to Nepal" (PDF). Official webpage of Indian Railways. Retrieved 1 June 2009.
    107. "India cancels Samjhauta Express after Pakistan's suspension". Mint. 11 August 2019.
    108. "India suspends Thar Link Express amid tensions with Pakistan over Kashmir". The Indian Express. 16 August 2019.
    109. Railways revise station categories to improve services Archived 17 March 2018 at the Wayback Machine, Economic Times, 28 December 2017.
    110. "Premium railway fares hiked up to 50 per cent in new dynamic pricing model". 8 September 2016. Archived from the original on 9 September 2016. Retrieved 8 September 2016.
    111. "Accommodation Classes in Indian Railways". Indian Railways. Archived from the original on 26 April 2017. Retrieved 15 November 2016.
    112. "General Information on travelling by IR". IRFCA.org. Indian Railways Fan Club. Archived from the original on 9 August 2020. Retrieved 3 June 2007.
    113. "Class of Travel". indiarail.co.uk. S.D. Enterprises Ltd. Archived from the original on 13 May 2007. Retrieved 3 June 2007.
    114. "Home on Wheels – Luxury Train Travel in an Exclusive Railway Saloon". indianluxurytrains.com. Archived from the original on 16 February 2021. Retrieved 21 March 2019.
    115. "Ready to shell out more! Now you can travel in Railways' luxury saloons – Jammu Mail". The Economic Times. Archived from the original on 21 October 2020. Retrieved 21 March 2019.
    116. "Vistadome on Nilgiri Mountain Railway". Archived from the original on 31 May 2020. Retrieved 21 March 2019.
    117. "The system of train numbers". IRFCA.org. Indian Railways Fan Club. Archived from the original on 9 August 2020. Retrieved 3 June 2007.
    118. "New Train Number Enquiry". Indian Railways Passenger Reservation Inquiry. Centre For Railway Information Systems. Archived from the original on 24 November 2010. Retrieved 5 February 2011.
    119. "railway operations — I". IRFCA.org. Indian Railways Fan Club. Archived from the original on 19 May 2011. Retrieved 11 June 2007.
    120. "Train names". IRFCA.org. Indian Railways Fan Club. Archived from the original on 1 April 2019. Retrieved 3 June 2007.
    121. Sekhsaria, Pankaj (24 June 2005). "What's in a Train Name?". The Hindu Business Line. Archived from the original on 8 June 2007. Retrieved 4 June 2007.
    122. "Vande Bharat Express achieves 130 kmph speed during inaugural run". Business Standard India. 15 February 2019. Retrieved 1 April 2021.
    123. "Toy Trains of India". Our Trips – Royal Train Tours. India Calling Tours (P) Limited. Archived from the original on 8 August 2007. Retrieved 12 May 2007.
    124. "NPalace on wheels – Exclusive Indian train was originally used by royalty". Times of India. 13 October 2012. Archived from the original on 17 October 2012.
    125. "Royal Rajasthan on Wheels Itinerary | Tour Program for 2014–15". Royalsrajasthanonwheels.com. Archived from the original on 31 March 2014. Retrieved 27 April 2014.
    126. "The Maharajas' Express Train Journeys Season 2014–2015". The-maharajas.com. Archived from the original on 28 February 2014. Retrieved 27 April 2014.
    127. "Ministry of Railways (Railway Board)". Archived from the original on 5 November 2013. Retrieved 26 January 2014.
    128. "Tour Itinerary – Tour Itinerary of Golden Chariot Train, Itinerary of Golden Chariot Train". Goldenchariottrain.com. Archived from the original on 14 April 2014. Retrieved 27 April 2014.
    129. "Southern Splendour Tour – South India Tour and South India Tour Package". Goldenchariottrain.com. Archived from the original on 14 April 2014. Retrieved 27 April 2014.
    130. "Ministry of Railways (Railway Board)". Indianrailways.gov.in. Archived from the original on 10 April 2014. Retrieved 27 April 2014.
    131. Joshi, V; I. M. D. Little (17 October 1996). "Industrial Policy and Factor Markets". India's Economic Reforms, 1991–2001. USA: Oxford University Press. p. 184. ISBN 0-19-829078-0. Retrieved 25 June 2007.
    132. "Reservation Rules". Indian Railways. Archived from the original on 24 June 2007. Retrieved 25 June 2007.
    133. "General Information on travelling by IR". Travelling by Train in India, IRFCA.org. Indian Railways Fan Club. Archived from the original on 9 August 2020. Retrieved 11 June 2007.
    134. "Indian Railway Catering and Tourism Corporation Limited". www.irctc.co.in. Archived from the original on 3 March 2007. Retrieved 3 June 2007.
    135. "Indian Railways White Paper 2016" (PDF). 25 February 2018. Archived (PDF) from the original on 26 February 2018.
    136. "INDIAN RAILWAYS 2017–2019 VISION & PLANS" (PDF). 25 February 2018. Archived (PDF) from the original on 18 November 2017.
    137. "Road-Rail Synergy System". Press release, Press Information Bureau, dated 2004-20-05. Archived from the original on 5 June 2011. Retrieved 22 December 2008.
    138. https://indianrailways.gov.in/railwayboard/uploads/directorate/planning/downloads/1-c-Foreword%20.pdf
    139. https://indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Previous%20Budget%20Speeches/2005-06.pdf
    140. https://indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Previous%20Budget%20Speeches/2006-07.pdf
    141. https://indianrailways.gov.in/railwayboard/uploads/directorate/finance_budget/Previous%20Budget%20Speeches/2008-09.pdf
    142. https://indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/Stat_0910/Year%20Book%202009-10-Sml_size_English.pdf
    143. "India overtakes Japan in length of metrorail projects: Union minister". 30 September 2022.
    144. "Urban Transport". Ministry of Housing and Urban Affairs.
    145. "Railways other than IR in India". IRFCA.org. Indian Railways Fan Club. Archived from the original on 24 May 2007. Retrieved 18 June 2007.
    146. "Chhatrapati Shivaji Maharaj Terminus (formerly Victoria Terminus)". World Heritage List. World Heritage Committee. 2004. Archived from the original on 27 November 2018. Retrieved 5 January 2009.
    147. "Mountain Railways of India". World Heritage List. World Heritage Committee. 1999. Archived from the original on 19 December 2008. Retrieved 5 January 2009.
    148. https://ncrb.gov.in/sites/default/files/ADSI-2021/adsi2021_Snapshots.pdf

    Further reading

    • Aguiar, Marian. Tracking Modernity: India's Railway and the Culture of Mobility (University of Minnesota Press; 2011) 226 pages; draws on literature, film, and other realms to explore the role of the railway in the Indian imagination. excerpt and text search
    • Bear, Linda. Lines of the Nation: Indian Railway Workers, Bureaucracy, and the Intimate Historical Self (2007) excerpt and text search
    • Donaldson, Dave. "Railroads of the Raj: Estimating the impact of transportation infrastructure." American Economic Review 108.4–5 (2018): 899–934. online, econometric study
    • Kerr, Ian J. Railways in Modern India (2001) excerpt and text search
    • Kerr, Ian J. Engines of Change: The Railroads That Made India (2006)
    • Kerr, Ian J. Building the Railways of the Raj, 1850–1900. (New Delhi: Oxford University Press, 1995).
    • Kumar, Sudhir, and Shagun Mehrotra. Bankruptcy to Billions: How the Indian Railways Transformed Itself (2009)
    • "IRFCA : FAQ – Table of Contents". Indian Railways Fan Club. Retrieved 19 June 2005.
    • "IRCTC". Indian Railways. Retrieved 19 June 2005.
    • "New IRCTC Ticket Booking Guidelines". ixigo. Retrieved 15 June 2020.
    • Pradhan, Rudra P., and Tapan P. Bagchi. "Effect of transportation infrastructure on economic growth in India: The VECM approach." Research in Transportation economics 38.1 (2013): 139–148.
    • Singh, Sanjay K. "Review of urban transportation in India." Journal of public transportation 8.1 (2005): 5+. online
    • Saha, Arnab (21 February 2021). "আজও স্মৃতিপথে এই ট্রেনের আসা-যাওয়া" [The coming and going of this train is still remembered today]. anandabazar.com (in Bengali). Kolkata: Anandabazar Patrika. Archived from the original on 21 February 2021. Retrieved 1 February 2023.


    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.