Kolkata Metro

The Kolkata Metro is a rapid transit system serving the city of Kolkata and the wider Kolkata Metropolitan Region in West Bengal, India. It is the first operational rapid transit system in India, and the second busiest metro network in India. As of January 2023 it has three operational lines: a 31.36 km (19.49 mi) line from Dakshineswar to Kavi Subhash, a 9.1 km (5.7 mi)[3] line from Salt Lake Sector V to Sealdah, and a 6.5 km (4.0 mi) line from Joka to Taratala, for a total of 46.96 km (29.18 mi).[4] Three other lines are in various phases of construction. The system has a mix of underground, at-grade and elevated stations using both broad-gauge and standard-gauge tracks. Trains operate between 06:55 and 22:30 IST and the fares range from ₹5 to ₹25.

Kolkata Metro
Overview
Native nameকলকাতা মেট্রো
Owner
Area servedKolkata Metropolitan Area
LocaleKolkata, West Bengal, India
Transit typeRapid Transit
Number of lines
  • 1 fully operational
  • 2 partly operational and partly under construction
  • 2 under construction
  • 1 planned
Line numberOperational: Under construction: Planned:
Number of stations40 (Operational)
42 (Under Construction)
16 (Planned)
Daily ridershipOver 700,000
Chief executive
  • P. Uday Kumar Reddy, GM (Metro Railway)
  • Harinath Jaiswal, MD (KMRC)
Headquarters
Website
Operation
Began operation24 October 1984 (1984-10-24)
Operator(s)Metro Railway, Kolkata
Infrastructure manager(s)Indian Railways
Number of vehiclesAround 45
Train length6 and 8 Coaches (Initially 4)
Headway5 minutes (Line 1)
10 minutes (Line 2)
40 minutes (Line 3)
Technical
System length46.96 km (29.18 mi)
Track gauge
  • 1,676 mm (5 ft 6 in) broad gauge (Blue & Purple Lines)
  • 1,435 mm (4 ft 8+12 in) standard gauge (Green Line)
Electrification750 V DC third rail
Average speed55–60 km/h (34.18–37.28 mph)
Top speed80 km/h (50 mph)

The Kolkata Metro was initially planned in the 1920s, but construction started in the 1970s. The first underground stretch, from Bhawanipore (now Netaji Bhawan) to Esplanade, opened in 1984. A truncated section of Line 2, or the East–West Corridor, from Salt Lake Sector V to Phoolbagan opened in 2020. Line 3, or the Joka-Esplanade Corridor (currently truncated in Taratala), opened in 2022. It is the fifth-longest operational metro network in India after the Delhi Metro, Namma Metro, Hyderabad Metro and Chennai Metro.

Metro Railway, Kolkata and Kolkata Metro Rail Corporation are the owners and operator of the system. On 29 December 2010, Metro Railway, Kolkata, became the 17th zone of the Indian Railways, completely owned and funded by the Ministry of Railways. It is the only metro in the country to be controlled by Indian Railways. There are around 300 daily train trips carrying more than 700,000 passengers.

History

Early attempts

In the September 1919 session of the Imperial Legislative Council at Shimla, a committee was set up by W. E. Crum that recommended a metro line for Kolkata (formerly Calcutta).[5] This line was supposed to connect Bagmari in the east to Benaras Road, Salkia, in Howrah in the west via a tunnel beneath Hooghly River. The estimated construction costs were £3,526,154, about 36.4 crore (equivalent to 70 billion or US$880 million in 2023) based on current exchange rates, and the proposed deadline was 1925–1926. The proposed line was 10.4 km (6.5 mi) long, about 4 km (2.5 mi) shorter than the current East-West Corridor, which would connect East Bengal Railway in Bagmari and East Indian Railway in Benaras Road. The tickets were priced at 3 annas ( 0.1875) for the full trip. Crum also mentioned a north–south corridor back then. An east–west metro railway connection, named the "East–West Tube Railway", was proposed for Kolkata in 1921 by Harley Dalrymple-Hay. All the reports can be found in his 1921 book Calcutta Tube Railways. However, in 1923, the proposal was not undertaken due to a lack of funds.[6][5][7]

Planning

The then Chief Minister of West Bengal, Bidhan Chandra Roy, reconceived the idea of an underground railway for Kolkata from 1949 to 1950. A survey was done by a team of French experts, but nothing concrete came of this. Efforts to solve problem traffic by augmenting the existing fleet of public transport vehicles hardly helped, since roads accounted for only 4.2 percent of the surface area in Kolkata, compared with 25 percent in Delhi and 30 percent in other cities. To find alternative solutions, the Metropolitan Transport Project (MTP) was set up in 1969. The MTP, with the help of Soviet specialists, Lenmetroproekt and East German engineers, prepared a master plan to provide five rapid-transit (metro) lines for the city of Kolkata, totaling a length of 97.5 km (60.6 mi), in 1971.[8] Three were selected for construction. These were:[9][10]

  1. Dum DumTollygunge (Line 1. Presently operates from Dakshineswar to New Garia)
  2. BidhannagarRamrajatala (Line 2. Presently truncated till Howrah Maidan)
  3. DakshineswarThakurpukur (Divided into Line 1; Noapara to Dakshineswar and Line 3; Joka to Esplanade)

The highest priority was given to the busy north–south corridor between Dum Dum and Tollygunge over a length of 16.45 km (10.22 mi); work on this project was approved on 1 June 1972. A tentative deadline was fixed to complete all the corridors by 1991.[11]

Construction

Shyambazar-Belgachhia Section (Shield tunneling using compressed air and airlocks) using Hungarian expertise during its construction in the 1980s.[12]

Since it was India's first metro[12] and was constructed as a completely indigenous process, a traditional cut-and-cover method and driven shield tunneling was chosen and the Kolkata Metro was more of a trial-and-error affair, in contrast to the Delhi Metro, which saw the involvement of multiple international consultants. As a result, it took nearly 23 years to completely construct the 17 km (11 mi) underground railway.[10][13]

The foundation stone of the project was laid by Indira Gandhi, the Prime Minister of India, on 29 December 1972, and construction work started in 1973–74. Initially, cut and cover along with slurry wall construction to handle soft ground, was recommended by the Soviet Union consultants. Later, in 1977, it was decided to adopt both shield tunneling and cut and cover methods for construction under populated areas, sewer lines, water mains, electrical cables, telephone cables, tram lines, canals etc. The technology was provided by M/s NIKEX Hungarian Co., Budapest.[14] In the early days, the project was led by the Union Railway Minister from West Bengal, A. B. A. Ghani Khan Choudhury, often against the prevailing socio-political stance of his contemporaries in the West Bengal government. From the start of construction, the project had to contend with several problems including insufficient funds (until 1977–1978), a shifting of underground utilities, court injunctions, and an irregular supply of vital materials.[10][15] In 1977, an injunction for the allocation of new funding was passed by the newly elected Jyoti Basu government.[16]

Kolkata Metro BHEL 1000 metro rake.

Despite all the hurdles, services began on 24 October 1984, with the commissioning of a partial commercial service covering a distance of 3.40 km (2.11 mi) with five stations served between Esplanade and Bhowanipur (currently Netaji Bhavan).[8] The first metro was driven by Tapan Kumar Nath and Sanjoy Kumar Sil.[17] The service was quickly followed by commuter services on another 2.15 km (1.34 mi) stretch in the north between Dum Dum and Belgachhia on 12 November 1984. The commuter service was extended to Tollygunge on 29 April 1986, covering a further distance of 4.24 km (2.63 mi), making the service available over a distance of 9.79 km (6.08 mi) and covering 11 stations. However, the services on the north section were suspended starting 26 October 1992, as this small, isolated section was little used.[15] The Line 1 was almost entirely built by cut and cover method, while a small 1.09 km stretch between Belgachia and Shyambazar was built using shield tunneling with compressed air and air locks, since the alignment crossed a railway yard (now Kolkata railway station) and Circular Canal.[14][18][19]

Evolution of Kolkata Metro

After more than eight years, the 1.62 km (1.01 mi) BelgachhiaShyambazaar section, along with the Dum Dum–Belgachhia stretch, was opened on 13 August 1994. Another 0.71 km (0.44 mi) stretch from Esplanade to Chandni Chowk was commissioned shortly afterwards, on 2 October 1994. The Shyambazaar-ShobhabazarGirish Park (1.93 km [1.20 mi]) and Chandni ChowkCentral (0.60 km [0.37 mi]) sections were opened on 19 February 1995. Services on the entire stretch of the Metro were introduced from 27 September 1995 by bridging the 1.80 km (1.12 mi) gap with Mahatma Gandhi Road metro station in the middle.[20]

In 1999–2000, the extension of Line 1 along an elevated corridor from Tollygunge to New Garia, with six stations, was sanctioned at a cost of 907 crore (equivalent to 39 billion or US$490 million in 2023).[21] The section was constructed and opened in two phases, Mahanayak Uttam Kumar to Kavi Nazrul in 2009 and Kavi Nazrul to Kavi Subhash in 2010. In the north, the line was extended till Noapara from Dum Dum on 10 July 2013.[22] The latest extension opened was the 4.1 km (2.5 mi) stretch from Noapara to Dakshineswar on 23 February 2021.[10][15][23]

East–West metro

The master-plan of the metro corridor was made in 1971 along with the North–South Corridor, connecting the office district of Bidhannagar with the twin city and transportation hub Howrah via another transport hub of the city, Sealdah, and the central business district Esplanade by an underwater metro line. It is a 4,874.6 crore (equivalent to 140 billion or US$1.7 billion in 2023) project, sanctioned in 2008 by Prime Minister Manmohan Singh. The foundation stone was laid on 22 February 2009 and construction started in March 2009.[24] The autonomous Kolkata Metro Rail Corporation (KMRC) was formed to implement the project. The Government of India (Ministry of Urban Development) and Government of West Bengal each had a half-share in it. Later, the Government of West Bengal pulled out from it, and the shares were transferred to the Ministry of Railways.[25]

Route realignment

Under construction Howrah metro station, the deepest metro station in India[26]
East West Metro Tunnel under the Hooghly River is the biggest underwater metro tunnel in India.[27]

The realignment led to many other issues and delays. Some of the biggest issues were the H-piles under Esplanade metro station and the Bowbazar mishap. As per the 1971 master plan, the East-West Corridor was supposed to pass under Central metro station, so the square foundational beams in Esplanade were not removed. Since the Tunnel Boring Machines (TBMs) cannot cut through steel, another small tunnel was dug using New Austrian tunnelling method (NATM) and the H-piles were cut manually. This extended the tunnelling process by one and a half months.[28][29][30] In September 2019, during the construction of the eastbound tunnel (from Esplanade to Sealdah), a TBM hit an aquifer under Bowbazar, causing a major collapse in the area, delaying work in that section for several months. Around 80 houses were damaged and many buildings were declared unsafe, affecting more than 600 people. Later subsidence in the area was checked using grouting.[31][32][33]

Expansion planning

By 2011–2012, the Railway Ministry had announced plans for the construction of five new metro lines and an extension of the existing north–south corridor. These were:[34][35]

  1. Salt LakeHowrah Maidan (Line 2 or East–West Metro Corridor)
  2. JokaB.B.D. Bagh (Line 3. Later truncated till Esplanade)
  3. Noapara–Barasat (Line 4, via airport)
  4. BaranagarBarrackpore (Line 5)
  5. New Garia – Dum Dum Airport (Line 6)

Major modifications

A new four-platform interchange station was constructed at Noapara. This will act as an interchange station between Line 1 and Line 4. For the time being, only two platforms are in use, but once Line 4 is running, all four platforms will be operational.[22][36] The existing Esplanade metro station is being upgraded and a subway is being constructed to the new metro station to provide an interchange among Line 1, Line 2 and Line 3.[37][38] In 2009–2010, Line 1 underwent upgrades of services and amenities and many stations were renamed after famous personalities by then Minister of Railways Mamata Banerjee.[39]

Network

Operational

Line no. Line colour First run Last extension Stations Length (km) Orientation Terminals Rolling stock Track gauge (mm) Power Avg. freq. (min)
1 Blue Line 24 October 1984[40] 22 February 2021 26 31.36 North–South Dakshineswar Kavi Subhash ICF, CRRC Dalian 1,676 mm (5 ft 6 in) 750 V DC 5
2 Green Line 13 February 2020[41] 11 July 2022 8 9.1 East–West Salt Lake Sector V Sealdah BEML 1,435 mm (4 ft 8+12 in)[42] 750 V DC 10
3 Purple Line 30 December 2022[43] - 6 6.5 Centre-South Joka Taratala ICF 1,676 mm (5 ft 6 in) 750 V DC 40
Total 40 46.96

Under construction/planned

Line no. Line name Expected first run Stations Length
(km)
Orientation Terminals Track gauge Power Executing agency Notes
4 Yellow Line2024 (NoaparaBiman Bandar)[35]1016.88[44] Central – North East NoaparaBarasat 1,676 mm (5 ft 6 in) 750 V DC Metro Railway, Kolkata Also called Barasat metro
5 Pink LinePlanned1112.40[44] Central – North Baranagar Barrackpore Rail Vikas Nigam Limited Also called Barrackpore metro
6 Orange Line2024(Kavi SubhashHemanta Mukherjee)[35]2429.87[44] South – North Kavi SubhashJai Hind Rail Vikas Nigam Limited[45] Also called Airport metro
Total 5459.15
Grand Total 94[lower-alpha 1]137.79

Lines

Blue line (Line 1)

Kolkata metro at Dakshineswar metro station on Line 1

Line 1, or the Blue line, of Kolkata Metro (Bengali: কলকাতা নগরীরেল) has a total length of 31.365 kilometres (19.489 mi) serving 26 stations, of which 15 are underground, 9 are elevated and 2 at-grade. It uses the 5 ft 6 in (1,676 mm) broad gauge tracks. It was the first underground railway to be built in India, with the first trains running in October 1984 and the full stretch that had been initially planned completed and operational by February 1995. The southward extension of Blue line to an elevated corridor from Tollygunge to New Garia was constructed and opened in two phases, Mahanayak Uttam Kumar to Kavi Nazrul in 2009 and Kavi Nazrul to Kavi Subhash in 2010. Another extension constructed was the 2.59 km (1.61 mi) elevated corridor from Dum Dum to Noapara in 2013.[15][46][47] The last 4.13 km (2.57 mi) extension from Noapara to Dakshineswar opened in 2021, thus completing the Blue line.[48]

A northward extension from Dum Dum to Dakshineswar (6.20 km [3.85 mi]) was sanctioned and included in the 2010–2011 budget at a cost of 227.53 crore (equivalent to 510 crore or US$64 million in 2023). The commercial operations for Dum Dum to Noapara (2.09 km [1.30 mi]) was commissioned in March 2013, and construction from Noapara to Dakshineswar with an interchange with Line 5 at Baranagar (2.38 km [1.48 mi]) is being executed by RVNL. This section is opened on 23 February 2021 for general public [49] with a projected ridership of 55,000 by 2030.[50]

Baranagar Metro Station on Kolkata metro line 1

An upgrade of the existing signalling system from Indian Railways Signalling to Communication Based Train Control was proposed by Metro Railway, Kolkata, at a cost of 467 crore (equivalent to 550 crore or US$69 million in 2023), and was sent to Indian Railways. This could decrease the time interval between trains to just 90 seconds from 5 minutes. Indian Railways approved the proposal, and installation work is expected to be completed within 2–3 years.[51]

Green line (Line 2)

Green Line or Line 2, is the second metro corridor to connect Kolkata with Howrah by an underwater metro line below the Hooghly River. The length was supposed to be 14.67 km (9.12 mi), 8.9 km (5.5 mi) underground and 5.77 km (3.59 mi) elevated. However, the project was stalled several times due to land acquisition and slum relocation issues. A major route realignment in 2013 increased the length to 16.55 km (10.28 mi). The elevated stretch is 5.77 km (3.59 mi) long while the underground stretch is 10.81 km (6.72 mi). The planned intersection with Blue line at Central was re-aligned to Esplanade (interchange with Blue line and Purple line). In September 2019, during the construction of the eastbound tunnel (from Esplanade to Sealdah), a TBM hit an aquifer under Bowbazar, causing a major collapse in the area, delaying work on that section for several months.[52] These issues have caused massive delays to the project, and foreign currency losses had led to an 80 percent cost escalation of the project to nearly 8,996.96 crore (equivalent to 130 billion or US$1.6 billion in 2023).[53][54]

Between Mahakaran and Howrah Station, the metro will run under the Hooghly River – the biggest underwater metro in India.[27] Transfer stations with railways will be located at Sealdah and Howrah. A new elevated extension from Salt Lake Sector V to VIP Road/Teghoria (Haldiram) was sanctioned, a distance of 5.5 km (3.4 mi) at a budget of 674 crore (equivalent to 969 crore or US$120 million in 2023) in 2016.[55] From VIP Road/Teghoria (Haldiram), passengers can take the Orange Line metro (VIP Road Station) to Biman Bandar.[44]

The line from Salt Lake Sector V to Salt Lake Stadium was inaugurated on 13 February 2020 by the then Minister of Railways Piyush Goyal after 11 years of construction.[56][57] Services to Phoolbagan metro station, the first underground station of the line, were extended on 4 October 2020. It was also the first underground station inaugurated in Kolkata after 25 years, since the Mahatma Gandhi Road metro station of Blue line was the last to open in 1995.[58][59] The extension added 1.66 km (1.03 mi) to the existing line.[3] On July 11, 2022, this line was extended till Sealdah.

Purple line (Line 3)

ICF Medha Rake MR-418 on the day of Inauguration of Line 3 at Joka metro station

Previously, the stretch from Thakurpukur to Majerhat was surveyed as a branch line of the circular railway, and a metro line from Majerhat to Dakshineswar via Sealdah (interchange with Green line) was planned.[9] This plan was scrapped and a new metro line from further south in Joka to BBD Bagh was sanctioned in 2010–2011 with a total length of 17.22 km (10.70 mi) at an anticipated cost of 2,619.02 crore (equivalent to 59 billion or US$740 million in 2023). Later the route was truncated to Esplanade. The corridor runs along Diamond Harbour Road, Khidirpur Road and Jawaharlal Nehru Road, major arterial roads of Kolkata, and has passenger interchange facilities with Blue line at Esplanade. The proposed Esplanade station will not be the same as that of Blue line but a different station which will also serve Green line. The line now has a new depot in Joka. Due to land acquisition problems[60] and objections from the Ministry of Defence, construction has been delayed several times since the beginning.[61] Defence Ministry objected that the elevated corridor would overlook the Eastern Command headquarters at Fort William, Ordinance Depot at Mominpore. The change in alignment from elevated to underground increased the construction cost of the stretch from 139 crore (equivalent to 164 crore or US$20 million in 2023) to 3,000 crore (equivalent to 35 billion or US$440 million in 2023).[62] The work resumed in several phases and new bids were invited by Rail Vikas Nigam Limited (RVNL) in April 2020.[63][64][65] It is India's first metro line to run on indigenous head hardened rails, manufactured by Jindal Steel & Power.[66][67] The extension of this line to IIM and Diamond Park for 2 km (1.2 mi) was sanctioned in the 2012–2013 Budget at a cost of 294.49 crore (equivalent to 555 crore or US$70 million in 2023). The work is being executed by RVNL.[68][34][44]

The line has 3 phases:

  1. Joka to Taratala (Phase 1)
  2. Majerhat to Esplanade (Phase 2)
  3. Joka to Diamond Park (Phase 3)

The Mominpur metro station was planned to build across a 2500 sq. m area. However, the Ministry of Defence objected to the elevated structure, saying that it would overlook the Ordnance depot. This forced RVNL to stall the entire project, and RVNL almost dropped the station from the plan even though it alone would have a projected 20,000 passengers during peak hours. Underground Mominpur station was also not possible due to the sharp gradient from Taratala metro station.[69] After a series of discussions and consultations with the Ministry of Defence and Government of West Bengal in 2016, it was decided to shift the station around 1 km (0.62 mi) northward, near the Alipore Bodyguard Lines.[70] But, after a year Defence Ministry approved the Mominpur metro station in its original location as the change in alignment would have delayed the project and budget overrun. It will be the last elevated station of the corridor.[69][71] Now, the proposed underground Khidirpur metro station is planned at the Alipore Bodyguard Lines.[72] There were also hurdles regarding clearance for tunneling under defence lands.[70] In 2020, Defence Ministry eased out the process as lease rent wasn't required anymore for tunneling until overground ownership of the land does not change.[62]

Yellow line (Line 4)

The work of integrating the Circular Railway from Dum Dum to Biman Bandar into a 6.249 km (3.883 mi) new metro line from Dum Dum to Netaji Subhash Chandra Bose International Airport was sanctioned in the 2010–2011 budget.[44] The cost of the project is 184.83 crore (equivalent to 415 crore or US$52 million in 2023). An eastward extension from Biman Bandar to Barasat over 10.627 km (6.603 mi)[44] was also sanctioned and included in the 2010–2011 budget. The cost of the project is 2,397.72 crore (equivalent to 49 billion or US$620 million in 2023). The work on this project from Noapara to Barasat is being executed by Metro Railway, Kolkata.[73] Due to multiple delays and hurdles, the total cost of the project had grown to 4,829.57 crore (equivalent to 65 billion or US$810 million in 2023).[74]

Following an objection from the Airports Authority of India (AAI), the route was further reworked. Instead of using the Circular Line's Jessore Road and Biman Bandar railway station, Jessore Road and Jai Hind metro station were planned at-grade and underground, respectively. This stretch will continue underground till Barasat after Prime Minister Narendra Modi's nod,[75] which was till New Barrackpore earlier.recent new is that the construction work is started from airport to new barrackpore underground link and soon the bidding of new Barackpore to Barasat line extension will start

Pink line (Line 5)

The Pink Line is the northward extension from Baranagar to Barrackpore [12.45 km (7.74 mi)]. It was sanctioned at a cost of 2,069.6 crore (equivalent to 46 billion or US$580 million in 2023) in the 2010–2011 budget. This line was meant to enable a quick commute from the northernmost suburbs to South Kolkata. The work corridor is being executed by RVNL. As of May 2021, no physical construction has commenced, and the project has been stalled as metro construction would affect the water pipelines along Barrackpore Trunk Road.[76] To avoid this, another proposal was made to continue this line through the Kalyani Expressway. Eleven metro stations were planned on this route.[34]

Orange line (Line 6)

A connection between New Garia and Netaji Subhas Chandra Bose International Airport (29.87 km [18.56 mi])[44] via EM Bypass, Salt Lake and Rajarhat-New Town was sanctioned to reduce travel time between the southern fringes of Kolkata and the airport. Work on this line was inaugurated by the then Railway Minister Mamata Banerjee on 7 February 2011 with a project deadline of six years.[77] The link between Kavi Subhash and Jai Hind, to be set up at a cost of 4,259.50 crore (equivalent to 50 billion or US$630 million in 2023),[78] will have 24 stations with the terminal Jai Hind metro station being an underground one. The work is executed by Rail Vikas Nigam Limited.[45] Jai Hind metro station will also have a stabling yard, and will be the largest underground facility in the country.[79] This line will have interchanges at Kavi Subhash (with Blue line); Salt Lake Sector V (with Green line) and Teghoria/VIP Road (again with Green line).[34][44] In July 2020, bids were invited by RVNL to complete the sections left due to various reasons and hurdles.[80][81]

Initially, the Jai Hind metro station was planned to be elevated. However, the AAI objected that the elevated stretch up to the airport might pose a threat to aircraft, so the route was further reworked and the station was shifted underground, 150 m from the Airport terminal building.[82][83] As per another revised plan, this line will continue till Barasat and the Yellow line would terminate at Jai Hind. There are also possibilities that Jai Hind metro station would serve as a junction of three lines, i.e. Noapara–Jai Hind, Kavi Subhash–Jai Hind and Jai Hind–Barasat.[82][83]

Proposed expansions

In 2012, RITES, surveyed 16 new routes for connecting the suburban areas to the city. The key routes were:[84]

  1. Majerhat to Ruby via Kalighat and Ballygunge
  2. Joka to Mahanayak Uttam Kumar via Thakurpukur
  3. Basirhat to Mahanayak Uttam Kumar, Kavi Subhash via Haroa and Bhangar
  4. Kavi Subhash to Canning via Rajpur-Baruipur & Uttarbhag along with EM Bypass
  5. Joka to Diamond Harbour along Diamond Harbour Road (Line 3 extension)
  6. Barasat to Barrackpore via State Highway 2 (Line 4 extension)
  7. Barrackpore to Kalyani via Kalyani Expressway (Line 4/ Line 5 extension)
  8. Madhyamgram to Barrackpore via Sodepur Road and Kalyani Expressway
  9. Branch line of Line 2 from Karunamoyee to Kolkata station
  10. Howrah MaidanShalimarSantragachi via Kona Expressway and Foreshore Road[85][86] (Line 2 extension)
  11. Santragachi to Dhulagarh (Line 2 extension)
  12. Howrah Maidan to Dankuni via Ichapur Road and Benaras Road
  13. Howrah Maidan to Srirampore and Chandannagar via Dankuni, National Highway 2
  14. Howrah Maidan to Belur

Owners and operators

Since the formation of the Metropolitan Transport Project (MTP) in 1969, Kolkata Metro has always been under the Indian Railways, directly or indirectly. It is the only metro in the country to be controlled by Indian Railways. On 29 December 2010, Metro Railway, Kolkata, became the 17th zone of the Indian Railways, completely owned and funded by the Ministry of Railways. Although Kolkata Metro Rail Corporation was formed with 50-50 shares of the Government of West Bengal and the Government of India, as the implementing agency of the East–West Corridor, later majority shares were transferred to Indian Railways. In July 2019, the operation of Green line was handed over to Metro Railway, Kolkata.[25][87][88]

Owner Operator
Metro Railway, Kolkata Ministry of Railways (India) Blue Line, Purple line
Kolkata Metro Rail Corporation Ministry of Railways (India) Green Line

Services

Operations

Map showing the whole route
Display showing upcoming station details and ETA
Display on platforms

Originally, There are a total of 358 services every day.[89] But, the services and timings were changed due to the COVID-19 pandemic and as of July 2022, it operates between 06:55 and 22:30 IST.[90] Trains operate at an average speed of 55–60 km/h (34.18–37.28 mph) and stop for about 10 to 20 seconds at each station, depending on the crowd.[91] All stations have display boards showing the terminating station, current time, scheduled time of arrival and estimated time of arrival of trains in Bangla, Hindi and English. Digital countdown clocks are also present in the stations.[92][93] The coaches have line route-maps and speakers and displays, which provide details of upcoming stations in the three languages.[94][95][96] Navigation information is available on Google Maps.[97] Kolkata Metro has launched its own official mobile app Metro Railway, Kolkata for android smartphone users which provides information regarding station, train timing, fare and has online smart card recharge facility.[98]

Seat reservation

In 2008, the Kolkata Metro Railway experimented with the practice of reserving two entire compartments for women. This system was found to be ineffective and caused inconvenience for a lot of commuters (including women) and the plan was dropped.[99]

Now, certain sections of seats in each compartment are reserved for women, senior citizens and the physically challenged. The four-seat sections at each end of a coach are reserved for senior citizens and the physically challenged, and the two middle seat sections, between the general seat sections on each side, are reserved for women.[100][101][102]

Fare

The fare is based on the predetermined distance formulas. Kolkata Metro has the lowest starting fare in the country of 5 (equivalent to 6.00 or 7.5¢ US in 2023). For Blue Line, the fare ranges from 5 (equivalent to 6.00 or 7.5¢ US in 2023) to 25 (equivalent to 29 or 36¢ US in 2023),for Green Line , its 5 (equivalent to 6.00 or 7.5¢ US in 2023) to 30 (equivalent to 35 or 44¢ US in 2023) and for Purple Line, the fare ranges from 5 (equivalent to 6.00 or 7.5¢ US in 2023) to 20 (equivalent to 24 or 30¢ US in 2023).[103]

Tickets

After using the magnetic ticketing strip system from 1984 to 2011, Kolkata Metro introduced Radio-Frequency Identification (RFID) tokens by Centre for Railway Information Systems (CRIS) in partnership with Keltron in August 2011. The old magnetic strip reader gates were replaced with new RFID readers.[104][105] The gates are AFC types of gates. These tokens are touched on the machine to enter the station, while to exit from the destination station, it is required to submit the token into the machine. The current tokens are coin shaped and made of plastic.

Metro token

Smart Card

After introducing RFID tokens, Kolkata metro introduced a Smart Card service provided by CRIS.[104] Earlier, four different types of smart cards were used: Minimum Multi Ride (MMR), Limited Multi Ride (LMR), General Multi Ride (GMR) and Extended Multi Ride (EMR). They were withdrawn on 7 November 2013 and a single type of Smart Card (General Smart Card) was introduced. Two new types of Tourist Smart Cards were also introduced (Tourist Smart Card – I and Tourist Smart Card – II). There is a compulsory refundable security deposit of 60 (equivalent to 71 or 89¢ US in 2023). The card is common for both Blue line and Green line.[106][107][108] Online smart card recharge facility was launched on 1 July 2020.[109][110] These smart cards are not required to be submitted to the AFC gates at the arriving station and can be carried by the passengers. These cards are required to be recharged if the previously recharged money is already spend.

Tourist Smart Card

Two new types of Tourist Smart Cards were also introduced (Tourist Smart Card – I and Tourist Smart Card – II). This type of smart card is for tourists and have unlimited rides. They cost 250 (equivalent to 290 or US$3.70 in 2023), valid for a day and 550 (equivalent to 650 or US$8.10 in 2023), valid for three days. A security deposit of 60 (equivalent to 71 or 89¢ US in 2023) is also charged.[107]

Durga Puja special services

The metro railway runs special night-long services during Durga Puja (Maha Saptami to Maha Navami) to help people travel faster and more conveniently for pandal-hopping. The services start at 13:00 and operate till 04:00 the next day. Pre-puja services are also run.[111][112][113]

Security

Platform screen door at Salt Lake Stadium metro station

All stations are equipped with closed-circuit cameras, metal detectors and baggage scanners. The Railway Protection Force provides security in the premises.[114][115] Smoking is strictly prohibited in the metro premises. All stations in the Green line have half-height and full-height platform screen doors for elevated and underground stations, respectively.[25]

Other facilities

All stations have televisions which telecast news and songs.[116] WiFi was introduced at Park Street and Maidan metro station in 2016. Gradually, it was expanded to all the stations. The service is provided by Reliance Jio.[117][118]

Most stations have services such as ATMs, food outlets and chemist stalls. To ease crowding for recharging smart cards, two Automatic Card recharge machines were installed at Dum Dum.[119] On account of the Swacchota–i–Seba (in English, Cleanliness is service), a nationwide awareness and mobilization campaign on cleanliness, plastic bottle crushers were placed at multiple stations.[120]

Ridership

Kolkata Metro is the 2nd busiest metro system in India. 2,465 travel by every Metro train in Kolkata against 1,110 in Delhi. Kolkata Metro carries around 7,00,000 people daily.[121] The daily and annual ridership has consistently risen since 1984. After the completion of the whole corridor from Dum Dum to Mahanayak Uttam Kumar in 1995, there was a huge leap in ridership. Low fares and fast and convenient travel have contributed to the high ridership figures. During the 2019 Durga Puja, there was a record ridership of 922,000.[122][47]

The Green Line sees around 40,000 people daily, with the Sealdah extension being operational from July 14, 2022.[123]

Average daily ridership[132]
Year Ridership
1985–86
7,600
1995–96
118,600
2001–02
166,000
2002–03
211,926
2003–04
248,090
2004–05
267,293
2005–06
295,542
2006–07
314,666
2009–10
375,268
2010–11
435,792
2013–14
520,000
2018–19
660,000
2019–20[lower-alpha 2]
633,000
2020–21[lower-alpha 3]
151,857
2021–22[lower-alpha 4]
405,596

The Purple Line sees around 2,000 people daily, being operational from January 2, 2023.

Infrastructure

Rolling stock

Second rake of Kolkata Metro (Green Line)

The rolling stock of Blue line uses 5 ft 6 in (1,676 mm) broad gauge, a broad gauge track manufactured by Integral Coach Factory, Chennai (ICF), and the electrical components are manufactured by NGEF, Bengaluru. Initially, the rolling stock fleet was composed of four-car rakes. Over the years there has been considerable expansion to the network, both underground and on elevated sections. With the increase in traffic, an eight-car rake formation has become standard.[133]

Depots and yards

There are four operational depots. The Noapara, Tollygunge and New Garia depots serve the Blue line, while the Central Park depot serves the Green line.[134][135][136] A depot at Joka for Purple line and a yard at Airport for Yellow line are under construction.[137][82][138]

Netaji metro station and the third rail electrification

Stations and electrification

Kolkata Metro has 40 stations, of which 17 are underground, 21 are elevated and 2 are at grade. Currently, Noapara is the largest metro station in the system and it will be the interchange station for Blue line and Yellow line. The under-construction Howrah metro station is the deepest metro station in India.[37] The standard length of platforms in Kolkata Metro is 170 m. The metro stations of Gitanjali and Netaji have the shortest platforms of 163 m.[139] The average length between any two stations is 1.14 km (0.71 mi). The shortest distance is 0.597 km (0.371 mi) between Central and Chandni Chowk, and the longest distance is 2.38 km (1.48 mi) between Noapara and Baranagar. Since the Kolkata Metro has 750 V DC third rail electrification, electricity substations were built in Jatin Das Park, Central and Shyambazar. The tracks are ballastless with M1A track fittings.[99]

Signalling and telecommunication

Trains operate on typical Indian Railways automatic signalling technology. A Route Relay Interlocking System has been provided at New Garia depot and Tollygunge depot and Electronic Interlocking has been provided at Noapara depot to facilitate the prompt withdrawal and injection of rakes and to perform shunting operations inside the car shed for maintenance purposes. The Train Protection and Warning System (TPWS) is provided throughout the Metro Railway. It is designed to prevent collisions caused by human (operator) error.[140] A Train Describer System and Auto Train Charting are used to help the operation control centre monitor and plan train movement on a real-time basis. An Integrated Power Supply System and Microprocessor based Data Logger System have also been provided.[141] An integrated system of STM-1 and STM-4 optical fibre cable is used for all telecommunication, signalling, SCADA and other circuits in Blue line. The service is provided by RailTel.[142]

An upgrade of the existing signalling system of the North-South corridor from Indian Railways Signalling to Communication Based Train Control was planned by Metro Railway, Kolkata, at 467 crore (equivalent to 550 crore or US$69 million in 2023) and the proposal was sent to Indian Railways, so that time interval between trains can be decreased to just 90 seconds from 5 minutes. In August 2019, Indian Railways gave a go-ahead to the proposal, and installation work is supposed to be complete within 2–3 years.[51]

Unlike the previous line, the Green line adopted the more advanced Communications Based Train Control system. It has cab signalling and a centralised automatic train control system consisting of automatic operation, protection and signalling modules. The signalling system is provided by Italy-based company Ansaldo STS. The other signalling equipment includes an integrated system with fibre optic cable, SCADA, radios, and a public-address system.[143][144][145][146]

Public address system

PA systems are present at all stations and their premises. A station master can make a necessary announcement to the passengers and staff, overriding the ongoing local announcement. Train PA systems are controlled by the motormen for announcements to passengers on the particular train.[147]

Issues

Since Kolkata Metro was constructed in the 1970s, there were some technical limitations. Due to the tunnel dimensions, and being under Indian Railways, Kolkata Metro opted for Indian metre gauge shell (2.7 m width) mounted upon 1,676 mm (5 ft 6 in) broad gauge bogies. The rakes have to be custom built and require a special assembly line involving additional costs thus limiting the options for rake manufacturers for Blue line.[148] From its inception, the coaches were manufactured by ICF, which lacked the pre-requisite knowledge for manufactured non-air-conditioning rakes. The 3000 and 4000 series rakes were faulty and delivered without any trials. In addition, Indian Railways signalling is used instead of European signalling. All of these factors have led to snags, delays and accidents.[149][150]

Unlike Delhi Metro, Kolkata Metro is owned and operated by Indian Railways instead of an autonomous body, and it relies solely on Indian Railways for every decision, from funding to route realignment.[151][152]

Underground tunnels

In densely populated areas, no free areas are left in order to build elevated metro tracks and stations. Therefore, underground systems are made there. But construction of underground metro tunnel at the Bowbazar area has caused cracks in the house of many habitats there. Hence the metro authority had to evacuate the people, and the construction of metro railway there faced massive delay and slow development.

Network map

See also

Notes

  1. 102 If interchanges counted multiple times
  2. Average before the COVID-19 lockdown in India
  3. Average after the COVID-19 lockdown in India
  4. Till December 2021

References

  1. "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Archived from the original on 1 June 2019. Retrieved 30 May 2019.
  2. "Registered Office". www.kmrc.in. Archived from the original on 15 February 2020. Retrieved 29 July 2020.
  3. "ইস্ট-ওয়েস্ট মেট্রো: বিধাননগরের সঙ্গে জুড়ে গেল ফুলবাগান". www.anandabazar.com (in Bengali). Anandabazar Patrika. 4 October 2020. Archived from the original on 29 May 2021. Retrieved 8 October 2020.
  4. "Kolkata Metro – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 27 July 2022.
  5. Jayanta Gupta (5 February 2020). "Kolkata's Tube Railway plan nipped in bud a century ago". The Times of India. Archived from the original on 8 February 2020. Retrieved 11 February 2020.
  6. Ganguly, Deepankar (23 August 2014). "Metro missed the train to Piccadilly". The Telegraph. Archived from the original on 22 August 2020. Retrieved 10 May 2020.
  7. Das, Madhuparna (5 March 2020). "100 years in the making, why Kolkata's east-west corridor is world's slowest metro project". ThePrint. Archived from the original on 30 March 2020. Retrieved 8 August 2020.
  8. "Kolkata Metro Rail Corporation Ltd". Kmrc.in. Archived from the original on 2 June 2017. Retrieved 27 January 2016.
  9. "Metro Railway – Kolkata, Route Map". 9 December 2004. Archived from the original on 9 December 2004. Retrieved 16 May 2020.
  10. "Brief History of Construction of Metro Railway Kolkata". mtp.indianrailways.gov.in. 15 January 2020. Archived from the original on 17 February 2019. Retrieved 20 May 2020.
  11. Mukherjee, Devjyot Ghoshal & Sharmistha (3 November 2009). "Delhi Metro speeds past Kolkata's". Business Standard India. Archived from the original on 30 December 2014. Retrieved 15 May 2020.
  12. "Kolkata Metro Line 1 provided start of the international career for Gus Klados". www.tunneltalk.com. Archived from the original on 9 June 2020. Retrieved 15 July 2020.
  13. "Metro Railway, Kolkata". kolmetro.com. 10 September 2007. Archived from the original on 10 September 2007. Retrieved 30 May 2020.
  14. Ghosal, Mainak (January 2018). "Challenges faced(then & now)during Kolkata Metro Construction – A Study". Structural Engineering Digest. Archived from the original on 22 August 2020. Retrieved 15 July 2020.
  15. "Metro Railway, Kolkata, the confluence of culture, technology and eco-friendliness". mtp.indianrailways.gov.in. 13 March 2020. Archived from the original on 5 July 2019. Retrieved 20 May 2020.
  16. Hall, Andrew (2006). "Reinventing Calcutta". Asian Affairs. 37 (3): 353–360. doi:10.1080/03068370600906515. S2CID 218620885.
  17. Chakraborty, Ajanta (13 February 2020). "West Bengal: Three drivers on roster to steer the first train". The Times of India. Retrieved 22 September 2021.
  18. Kolkata Old Map.jpg "Archived copy". Archived from the original on 22 August 2020. Retrieved 15 July 2020.{{cite web}}: CS1 maint: archived copy as title (link) CS1 maint: bot: original URL status unknown (link) Lt. Col Mark Wood's Map of Kolkata in 1784–85 showing the extent of the Maratha Ditch
  19. Saha, Gouranga Prasad; Chaudhary, P.R. (1995). Calcutta Metro – Construction by 'Cut and Cover' and 'Shield Tunneling' Methods. Archived from the original on 22 August 2020. Retrieved 20 May 2020.
  20. "Kolkata Metro on a Reform Roadmap". mtp.indianrailways.gov.in. 4 December 2019. Archived from the original on 19 August 2013. Retrieved 18 July 2013.
  21. "Metro Railway, Kolkata". 9 December 2004. Archived from the original on 9 December 2004. Retrieved 10 May 2020.
  22. Chakraborty, Ajanta (25 December 2012). "From April, fly to Naoapara from Garia in 54 mins flat". The Times of India. Archived from the original on 22 August 2020. Retrieved 20 May 2020.
  23. Chakraborty, Ajanta (22 February 2021). "Dakshineswar Metro to link Kolkata with districts". The Times of India. Retrieved 8 March 2022.
  24. "Hindustan Times – Archive News". Hindustan Times. Archived from the original on 10 October 2007.
  25. "Review of annual report and audited accounts of kolkata metro rail corporation limited (KMRCL) for the year 2016–17" (PDF). kmrc. Archived (PDF) from the original on 9 December 2019. Retrieved 17 May 2020.
  26. Chakraborty, Ajanta (13 August 2019). "India's deepest Metro station comes up 30 m below Howrah railway station". The Times of India. Archived from the original on 2 September 2019. Retrieved 23 May 2020.
  27. "Kolkata Metro's TBM S639 Crosses Halfway Mark Under Hooghly". The Metro Rail Guy. 5 May 2017. Retrieved 14 February 2023.
  28. Chakraborty, Ajanta (14 April 2018). "Kolkata metro: Kolkata: Metro tunnel boring hits steel wall at Esplanade". The Times of India. Archived from the original on 22 August 2020. Retrieved 3 June 2020.
  29. Jayanta Gupta (2 August 2018). "Kolkata metro: 'Microsurgery' at Esplanade to remove E-W Metro hurdle". The Times of India. Archived from the original on 7 July 2020. Retrieved 3 June 2020.
  30. Shukla, Darshana (6 August 2018). "Kolkata Metro | KMRCL plans microsurgery to solve E-W metro hurdle". Metro Rail News. Archived from the original on 3 June 2020. Retrieved 3 June 2020.
  31. Roy, Subhajoy (6 August 2019). "Underground wall to halt subsidence in Bowbazar". The Telegraph. Archived from the original on 9 September 2019. Retrieved 16 May 2020.
  32. "80 houses damaged, hundreds homeless as digging for Kolkata Metro tunnel hits water body". The New Indian Express. Archived from the original on 3 June 2020. Retrieved 3 June 2020.
  33. "Bowbazar mishap: KMRCL gives compensation to evacuated families". The Statesman. 8 September 2019. Archived from the original on 3 June 2020. Retrieved 3 June 2020.
  34. "Road Ahead….. Projects sanctioned". mtp.indianrailways.gov.in. 8 May 2014. Archived from the original on 17 February 2019. Retrieved 19 May 2020.
  35. "Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News – Times of India". The Times of India. 10 June 2019. Archived from the original on 10 June 2019. Retrieved 10 June 2019.
  36. "Kolkata Metro Commissioned 3rd Platform At Noapara on Friday". Kolkata24x7: Latest English and Bengali News, Bangla News, Breaking News, Business, Tollywood, Cricket. 21 January 2017. Archived from the original on 22 August 2020. Retrieved 20 May 2020.
  37. Chakraborty, Ajanta (13 August 2019). "India's deepest Metro station comes up 30 m below Howrah railway station". The Times of India. Archived from the original on 2 September 2019. Retrieved 20 May 2020.
  38. Sanjay Mandal (2 January 2020). "East West Metro design in last leg". The Telegraph. Archived from the original on 22 August 2020. Retrieved 29 July 2020.
  39. "Game of the name". The Telegraph. 26 July 2009. Archived from the original on 9 April 2019. Retrieved 20 May 2020.
  40. Jayanta Gupta (6 July 2017). "Metro prepares completion calendar for city projects". The Times of India. Archived from the original on 4 April 2019. Retrieved 29 July 2020.
  41. Chakraborty, Ajanta; Gupta, Jayanta (5 February 2020). "Kolkata Metro: 8am on Valentine's Day;Your date with East-West Metro". The Times of India. Archived from the original on 5 February 2020. Retrieved 5 February 2020.
  42. Ajanta Chakraborty (4 February 2020). "On track: First phase of East-West Metro to roll out on February 13". The Times of India. Archived from the original on 7 February 2020. Retrieved 30 May 2020.
  43. "Kolkata Metro: First glimpse of Joka-Taratala route in pics". mint. 30 December 2022. Retrieved 30 December 2022.
  44. "New System Map of Kolkata Metro". mtp.indianrailways.gov.in. 5 December 2019. Archived from the original on 5 September 2019. Retrieved 17 May 2020.
  45. "Metro Railway Kolkata / Indian Railways Portal". 30 March 2018. Archived from the original on 30 March 2018. Retrieved 10 May 2020.
  46. "Milestone". mtp.indianrailways.gov.in. 4 December 2019. Archived from the original on 5 July 2019. Retrieved 20 May 2020.
  47. "Kolkata Metro services to start earlier on weekends from July 1". The Indian Express. 29 June 2019. Archived from the original on 27 September 2019. Retrieved 27 September 2019.
  48. "Bengal has made up its mind for 'poriborton', says PM Modi in Hooghly". business-standard.com. 22 February 2021. Archived from the original on 22 February 2021. Retrieved 22 February 2021.
  49. "Kolkata Metro's extended route to Dakshineswar to start in January". Asianet News Network Pvt Ltd. Archived from the original on 24 November 2020. Retrieved 18 November 2020.
  50. B, Krishnendu; Ajanta Chakraborty (10 June 2019). "Kolkata: Work on fast track as East-West Metro eyes new links in next two years". The Times of India. Archived from the original on 10 June 2019. Retrieved 19 June 2019.
  51. Mitra, Debraj (29 July 2020). "Quicker train hope in nod for Calcutta Metro signal upgrade". The Telegraph. Archived from the original on 3 November 2019. Retrieved 9 May 2020.
  52. "18 buildings damaged as Kolkata Metro tunnel-borer 'hits aquifer' – Times of India". The Times of India. 2 September 2019. Archived from the original on 5 September 2019. Retrieved 2 March 2020.
  53. IANS (4 June 2016). "East West Metro project cost to shoot up to nearly Rs 9,000 cr". Business Standard India. Archived from the original on 19 August 2016. Retrieved 17 May 2020.
  54. "East West Metro project cost to shoot up to nearly Rs 9,000 cr – Times of India". The Times of India. 5 January 2017. Archived from the original on 5 January 2017. Retrieved 17 May 2020.
  55. "Mixed bag for Bengal in Railway Budget 2016; Kolkata gets new Metro route". 25 February 2016. Archived from the original on 27 September 2016. Retrieved 25 September 2016.
  56. "East west metro will be started to run from 13 th february". Sangbad Pratidin (in Bengali). 3 February 2020. Archived from the original on 3 February 2020. Retrieved 3 February 2020.
  57. "First underwater metro to begin services in Kolkata from February 13". The Hindu. 4 February 2020. ISSN 0971-751X. Archived from the original on 26 February 2020. Retrieved 29 July 2020.
  58. "Kolkata to get first underground metro station in 25 years". livemint. 4 October 2020. Archived from the original on 4 October 2020. Retrieved 4 October 2020.
  59. "Piyush Goyal inaugurates Phoolbagan Station of Kolkata's East West Metro corridor". The Hindu. PTI. 4 October 2020. ISSN 0971-751X. Archived from the original on 7 October 2020. Retrieved 4 October 2020.{{cite news}}: CS1 maint: others (link)
  60. NANDI, SOUMITRA (30 January 2020). "Inability to procure land for depot leaves RVNL unsure of Joka-BBD Bag Metro's 1st phase commencement". www.millenniumpost.in. Archived from the original on 31 January 2020. Retrieved 17 May 2020.
  61. "580 crore sanctions to build Joka-BBD Bagh Metro depot – Rail Analysis India". 18 June 2019. Archived from the original on 18 June 2019. Retrieved 17 May 2020.
  62. Bandyopadhyay, Krishnendu (30 July 2020). "Kolkata: Defence nod makes journey of Joka Metro project easier". The Times of India. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  63. B, Krishnendu (1 March 2019). "Work begins at Joka Metro depot, wall built". The Times of India. Archived from the original on 22 August 2020. Retrieved 17 May 2020.
  64. Khare, Anushka (1 May 2020). "Bids invited for construction of Joka depot for Kolkata Metro Line 3". Urban Transport News. Archived from the original on 16 May 2020. Retrieved 17 May 2020.
  65. "RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot". The Metro Rail Guy. 28 April 2020. Archived from the original on 22 August 2020. Retrieved 17 May 2020.
  66. Bandyopadhyay, Krishnendu (12 August 2020). "Kolkata: Joka-Esplanade to be India's first Metro to run on indigenous rails". The Times of India. Archived from the original on 12 August 2020. Retrieved 12 August 2020.
  67. "JSPL Becomes First Indian Company To Supply Head Hardened Rails To India's Metro Trains". Ommcom News. 12 August 2020. Archived from the original on 16 August 2020. Retrieved 12 August 2020.
  68. Chakraborty, Monotosh (10 July 2010). "Joka-Eplanade Metro on the anvil". The Times of India. Archived from the original on 2 October 2016.
  69. Jayanta Gupta (18 February 2017). "Defence ministry clears decks for Mominpore metro station". The Times of India. Archived from the original on 20 February 2017. Retrieved 17 May 2020.
  70. Byandhopadhyay, Krishnendu (17 April 2016). "Kolkata's Mominpore station jinx broken, Joka-BBD Bag Metro rises again". The Times of India. Archived from the original on 31 January 2017. Retrieved 18 May 2020.
  71. "RVNL invites bids for consultancy services for Kolkata Metro extension". Urban Transport News. 19 July 2019. Archived from the original on 22 July 2019. Retrieved 18 May 2020.
  72. Chakraborty, Ajanta (14 December 2020). "Kolkata: Joka Metro skirts school bottleneck with route tweak". The Times of India. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  73. "Dum Dum-Barrackpore Metro project awaits state nod". The Statesman. Archived from the original on 9 June 2012. Retrieved 7 July 2012.
  74. Mandal, Sanjay (7 December 2018). "Airport-Barasat metro line back to life". The Telegraph. Archived from the original on 2 November 2019. Retrieved 19 May 2020.
  75. Sarkar, Pranesh (5 February 2021). "PM nod for underground Metro averts eviction". The Telegraph. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  76. Mandal, Sanjay (26 February 2015). "Going going... RIP Barrackpore Metro". www.telegraphindia.com. Archived from the original on 9 July 2017. Retrieved 29 July 2020.
  77. "Rail set to take over East-West". The Telegraph. 8 February 2011. Archived from the original on 22 August 2020. Retrieved 29 July 2020.
  78. Chakraborty, Ajanta (4 February 2021). "Kolkata: In election year, four Metro links get Rs 2,263 crore boost". The Times of India. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  79. Gupta, Jayanta (28 July 2018). "Airport Metro yard to be country's largest underground facility". The Times of India. Archived from the original on 2 August 2018. Retrieved 10 May 2020.
  80. Shah, Narendra (4 July 2020). "Railway Board approves Rs 527 crore for Kolkata Metro Line 6 corridor". Metro Rail News. Archived from the original on 8 July 2020. Retrieved 7 July 2020.
  81. Khare, Anushka (12 June 2020). "ITD bags balance civil work contract of Kolkata Metro's Airport Line". Urban Transport News. Archived from the original on 7 July 2020. Retrieved 7 July 2020.
  82. Mandal, Sanjay (21 April 2019). "Metro hub 150 m from Calcutta airport". The Telegraph. Archived from the original on 22 April 2019. Retrieved 16 May 2020.
  83. Mandal, Sanjay (2 April 2012). "Track tweak for airport link". Archived from the original on 30 August 2017. Retrieved 13 December 2016.
  84. "Survey of 16 new Metro routes – Times of India". The Times of India. 2 January 2012. Archived from the original on 28 November 2018. Retrieved 27 November 2018.
  85. Rupak Banerjee (2 December 2016). "2017 start for Howrah EW Metro". The Times of India. Archived from the original on 28 November 2019. Retrieved 29 July 2020.
  86. "E-W Metro may run till Santragachhi". The Times of India. 28 August 2018. Archived from the original on 30 July 2019. Retrieved 29 July 2020.
  87. Sanjay Mandal (18 July 2019). "East-West load on struggling Metro". The Telegraph. Archived from the original on 23 July 2019. Retrieved 20 May 2020.
  88. "Kolkata Metro is now the 17th zone of Indian Railways". The Times of India. 29 December 2010. Archived from the original on 4 November 2012. Retrieved 29 December 2010.
  89. "First/last train". mtp.indianrailways.gov.in. 29 July 2019. Archived from the original on 11 July 2019. Retrieved 17 May 2020.
  90. "Time Table". mtp.indianrailways.gov.in. 12 April 2021. Archived from the original on 21 April 2021. Retrieved 13 April 2021.
  91. Chakraborty, Ajanta; Gupta, Jayanta (5 February 2020). "Kolkata Metro: 8am on Valentine's Day;Your date with East-West Metro". The Times of India. Archived from the original on 5 February 2020. Retrieved 17 May 2020.
  92. Debraj Mitra (21 February 2018). "Metro gets real-time display boards". The Telegraph. Archived from the original on 22 August 2020. Retrieved 24 May 2020.
  93. Subhro Niyogi (16 February 2019). "Metro timetable to remain but boards to display dynamic ETA". The Times of India. Archived from the original on 22 August 2020. Retrieved 24 May 2020.
  94. Ramachandran, M. (3 November 2011), "East–West Metro in Kolkata", Metro Rail Projects In India, Oxford University Press, pp. 85–100, doi:10.1093/acprof:oso/9780198073987.003.0005, ISBN 978-0-19-807398-7
  95. "1st Refurbished Non-AC Train Rejoins Kolkata Metro". The Metro Rail Guy. 10 June 2016. Archived from the original on 14 July 2019. Retrieved 27 July 2020.
  96. "Kolkata 'underwater' Metro: City of Joy gets its second corridor after 36 years". The Indian Express. 14 February 2020. Archived from the original on 27 July 2020. Retrieved 27 July 2020.
  97. "Google Maps Transit Adds Indian Railways Schedules, Updated Bus and Metro Routes for 8 Cities". NDTV Gadgets 360. 12 May 2015. Archived from the original on 8 July 2020. Retrieved 7 July 2020.
  98. "Metro Railway Official Mobile Application (App)". mtp.indianrailways.gov.in. 14 August 2020. Archived from the original on 2 July 2019. Retrieved 15 August 2020.
  99. "Existing Features". www.mtp.indianrailways.gov.in. 15 January 2020. Archived from the original on 6 August 2013. Retrieved 30 June 2013.
  100. "Why we must still reserve seats for women on public transport". citizenmatters. 5 October 2017. Archived from the original on 21 June 2020. Retrieved 20 May 2020.
  101. "Big cheer for commuters! First phase of Kolkata Metro East-West Corridor opens; top 10 salient features". The Financial Express. 14 February 2020. Archived from the original on 15 February 2020. Retrieved 20 May 2020.
  102. "How to Ride the Kolkata Metro Rail or Subway: Insider Tips from a Local Girl! – Orange Wayfarer". www.orangewayfarer.com. 13 October 2018. Archived from the original on 22 August 2020. Retrieved 20 May 2020.
  103. "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Archived from the original on 8 July 2019. Retrieved 28 February 2020.
  104. Jayanta (31 July 2011). "Smart cards, tokens to replace Metro tickets today". The Times of India. Archived from the original on 22 August 2020. Retrieved 3 March 2020.
  105. Sanjay Mandal (10 May 2011). "A token ride on the Metro". The Telegraph. Archived from the original on 3 March 2020. Retrieved 3 March 2020.
  106. "East West Metro In Kolkata Begins Operations On Valentine's Day". www.outlookindia.com/outlooktraveller. 14 February 2020. Archived from the original on 22 August 2020. Retrieved 18 May 2020.
  107. "Business Rule of Metro Railway". mtp.indianrailways.gov.in. 13 March 2020. Archived from the original on 5 July 2019. Retrieved 18 May 2020.
  108. "For passenger convenience, Kolkata Metro introduces information in Bengali on smart cards". The Financial Express. 8 May 2018. Archived from the original on 9 July 2020. Retrieved 7 July 2020.
  109. "Kolkata Metro Web Based Card Recharge System". mtp.indianrailways.gov.in. 1 July 2020. Retrieved 1 July 2020.
  110. B, Krishnendu (30 June 2020). "Online recharge of Kolkata Metro Smart Card introduced". The Times of India. Archived from the original on 1 July 2020. Retrieved 1 July 2020.
  111. MP, Team (19 September 2019). "Kolkata Metro to run night-long special services to tackle Puja rush". www.millenniumpost.in. Archived from the original on 23 September 2019. Retrieved 19 May 2020.
  112. "Kolkata Metro To Run Night-Long Service During Durga Puja". NDTV.com. 3 October 2018. Archived from the original on 11 August 2019. Retrieved 19 May 2020.
  113. "Kolkata metro: Kolkata: Night-long Metro services during Durga Puja". The Times of India. 3 October 2018. Archived from the original on 9 October 2018. Retrieved 19 May 2020.
  114. "Kolkata metro to install x-ray baggage scanners". Daily News and Analysis. 5 October 2012. Archived from the original on 19 October 2012. Retrieved 7 November 2012.
  115. "Integrated Security System". mtp.indianrailways.gov.in. 14 January 2020. Archived from the original on 17 February 2019. Retrieved 19 May 2020.
  116. "INCODA TV HD inks sales partnership deal with Aidem Ventures – Exchange4media". Indian Advertising Media & Marketing News – exchange4media. Archived from the original on 22 August 2020. Retrieved 17 May 2020.
  117. Indrajit Kundu (1 June 2016). "Get set for Wi-Fi service on Kolkata's underground metro rail!". India Today. Archived from the original on 22 August 2020. Retrieved 18 May 2020.
  118. "Free Wi-Fi at Metro stations". The Telegraph. 14 October 2015. Archived from the original on 22 August 2020. Retrieved 18 May 2020.
  119. "List of passenger amenities item at stations". mtp.indianrailways.gov.in. 2 January 2020. Archived from the original on 9 July 2019. Retrieved 24 May 2020.
  120. "Metro Railway observes "Swachhta – Hi –Seva"". mtp.indianrailways.gov.in. 11 September 2019. Retrieved 24 May 2020.
  121. Verma, Kanika (17 July 2019). "2,465 travel by every Metro train in Kolkata against 1,110 in Delhi -". Metro Rail News. Archived from the original on 6 December 2019. Retrieved 19 May 2020.
  122. "Metro Services". mtp.indianrailways.gov.in. Archived from the original on 12 August 2019. Retrieved 19 May 2020.
  123. "Sealdah E-w Link Pushes Up Daily Footfall From 3k To 41k In A Week | Kolkata News – Times of India". Timesofindia.indiatimes.com. 23 July 2022. Retrieved 2 August 2022.
  124. "Comprehensive Mobility Plan Back to Basics Kolkata Metropolitan Area" (PDF). Archived (PDF) from the original on 7 May 2017. Retrieved 19 May 2020.
  125. "Performance of the Metro Railway, Kolkata for 2010-11" (PDF). indianrailways.gov.in. Archived (PDF) from the original on 2 April 2013. Retrieved 19 May 2020.
  126. "Performance of the Metro Railway, Kolkata for 2009-10" (PDF). indianrailways.gov.in. Archived (PDF) from the original on 23 August 2014. Retrieved 19 May 2020.
  127. Vibrant Railways Strengthening Bengal. Indian Railways. 2019. p. 22. Archived from the original on 25 November 2020. Retrieved 19 May 2020.
  128. Singh, Shiv Sahay (20 March 2020). "Sharp fall in Kolkata Metro traffic". The Hindu. ISSN 0971-751X. Archived from the original on 21 March 2020. Retrieved 19 May 2020.
  129. Hossain, Shaheryar (23 November 2020). "Over 1 Lakh passengers avail Metro services on Nov 18". millenniumpost. Archived from the original on 27 November 2020. Retrieved 21 February 2021.
  130. Chakraborty, Ajanta (8 August 2021). "Kolkata: Metro footfall crosses 2 lakh mark in 3 weeks". The Times of India. Retrieved 11 August 2021.
  131. Ajanta Chakraborty (22 December 2021). "Kolkata Metro crosses 4 lakh daily ridership | Kolkata News – Times of India". The Times of India. Retrieved 21 February 2022.
  132. [124][125][126][127][128][129][130][131]
  133. "Rolling Stock" (PDF). mtp.indianrailways.gov.in. 2 May 2020. Retrieved 20 May 2020.
  134. Ajanta Chakraborty. "E-W Metro ready for trial run between Central Park & Sec V". The Times of India. Archived from the original on 27 July 2018. Retrieved 16 May 2020.
  135. Mitra, Debraj (4 March 2019). "Metro rake from China off vessel". The Telegraph. Archived from the original on 6 March 2019. Retrieved 16 May 2020.
  136. Jayanta Gupta. "Yard remodelling may affect Metro services for a month". The Times of India. Archived from the original on 29 May 2018. Retrieved 16 May 2020.
  137. Jayanta Gupta (7 October 2018). "Work gets going on Metro's airport station". The Times of India. Archived from the original on 3 April 2019. Retrieved 16 May 2020.
  138. "Rail Vikas Nigam invites bids for Joka-Esplanade Metro Project". Construction Week Online India. Archived from the original on 22 August 2020. Retrieved 16 May 2020.
  139. Mandal, Sanjay (26 May 2010). "Metro overshoots safety line – Platforms at two stations shorter than stipulated". The Telegraph. Archived from the original on 22 August 2020. Retrieved 30 June 2013.
  140. "Automatic warning to make Metro safer". The Times of India. 3 March 2013. Archived from the original on 16 January 2014. Retrieved 30 June 2013.
  141. "Existing Signalling System". mtp.indianrailways.gov.in. 1 January 2020. Archived from the original on 2 June 2013. Retrieved 30 June 2013.
  142. "Optical Fibre Cable Communication System". mtp.indianrailways.gov.in. 14 October 2014. Archived from the original on 17 February 2019. Retrieved 20 May 2020.
  143. "Kolkata Metro East-West Corridor". Railway Technology. Archived from the original on 21 May 2020. Retrieved 18 May 2020.
  144. Batra, Mannat (12 July 2019). "Kolkata East West Metro gets safety clearance for signalling systems". Urban Transport News. Archived from the original on 7 March 2020. Retrieved 18 May 2020.
  145. Mandal, Sanjay (29 July 2020). "Smart signalling for swifter East-West". The Telegraph. Archived from the original on 22 August 2020. Retrieved 18 May 2020.
  146. "Kolkata Metro Rail Corporation Ltd". www.kmrc.in. Archived from the original on 25 January 2020. Retrieved 24 May 2020.
  147. "Public Address System (PA System)". mtp.indianrailways.gov.in. 8 May 2014. Archived from the original on 17 February 2019. Retrieved 20 May 2020.
  148. Jayanta Gupta (23 August 2019). "Kolkata Metro will continue to have problems with rakes, thanks to its construction". The Times of India. Archived from the original on 27 January 2020. Retrieved 30 July 2020.
  149. Gupta, Jayanta (12 June 2019). "After Monday's disruption, Kolkata Metro back to old rakes; services dip". The Times of India. Archived from the original on 13 June 2019. Retrieved 19 May 2020.
  150. Mitra, Debraj (13 July 2019). "New trains with a history of snags". The Telegraph. Archived from the original on 22 August 2020. Retrieved 19 May 2020.
  151. B, Krishnendu (18 April 2019). "Systemic faults behind East-West Kolkata Metro delay, says expert". The Times of India. Archived from the original on 22 August 2020. Retrieved 19 May 2020.
  152. Bhattacharya, Alokesh; J, Anand (9 January 2012). "DMRC MD E Sreedharan says many Indian cities need metro rail urgently". www.businesstoday.in. Archived from the original on 10 November 2017. Retrieved 19 May 2020.